AWWA D115 2006
$75.83
AWWA D115-06: Tendon-Prestressed Concrete Water Tanks
Published By | Publication Date | Number of Pages |
AWWA | 2006 | 96 |
This standard covers current and recommended practice for the design, construction, and field observations of concrete tanks using tendons for prestressing.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ANSI/AWWA D115-06 |
3 | Committee Personnel |
5 | Contents |
7 | Foreword I. Introduction. |
9 | II. Special Issues. |
10 | III. Use of This Standard. |
13 | IV. Modification of Standard. V. Major Revisions. VI. Comments. |
15 | AWWA Standard Tendon-Prestressed Concrete Water Tanks SECTION 1: GENERAL Sec. 1.1 Scope Sec. 1.2 Definitions |
18 | Sec. 1.3 References |
21 | SECTION 2: MATERIALS Sec. 2.1 Materials Sec. 2.2 Concrete and Shotcrete |
23 | Sec. 2.3 Mixing Water Sec. 2.4 Admixtures |
24 | Sec. 2.5 Reinforcement Sec. 2.6 Ducts Sec. 2.7 Sheathing |
25 | Sec. 2.8 Elastomeric Materials |
26 | Sec. 2.9 Epoxy Bonding Agent Sec. 2.10 Shrinkage Compensating Grout Sec. 2.11 Steel Corrosion Inhibitor |
27 | Sec. 2.12 Concrete Coatings Sec. 2.13 Sealants SECTION 3: DESIGN Sec. 3.1 Notation |
28 | Sec. 3.2 Design Method |
29 | Sec. 3.3 Design Loads |
31 | Sec. 3.4 Allowable Stresses |
33 | Sec. 3.5 Footing Design |
34 | Sec. 3.6 Floor Design |
36 | Sec. 3.7 Wall Design |
40 | Sec. 3.8 Concrete Roofs |
41 | Sec. 3.9 Dome Roof Design |
44 | Sec. 3.10 Other Roof Designs |
45 | Sec. 3.11 Concrete and Shotcrete Cover |
46 | Sec. 3.12 Additional Considerations in Cold Climates |
47 | Sec. 3.13 Tank Appurtenances |
50 | SECTION 4: EARTHQUAKE DESIGN CONSIDERATIONS Sec. 4.1 Introduction Sec. 4.2 Seismic-Design Categories |
51 | Table 1 Importance factor Table 2 Response modification factor, R, for type of tank base Table 3 Soil-profile coefficient |
52 | Table 4 Zone coefficient |
53 | Sec. 4.3 Seismic-Design Loads |
57 | Sec. 4.4 Vertical and Horizontal Forces |
58 | Sec. 4.5 Other Effects |
60 | Sec. 4.6 Allowable Stresses |
61 | Sec. 4.7 Maximum Allowable Coefficient of Friction Sec. 4.8 Serviceability Requirements |
62 | Sec. 4.9 Foundation Design Sec. 4.10 Minimum Freeboard |
63 | Sec. 4.11 Design for Seismic Effects of Backfill SECTION 5: CONSTRUCTION PROCEDURES Sec. 5.1 Scope Sec. 5.2 Cast-in-Place Concrete |
72 | Sec. 5.3 Precast Concrete |
74 | Sec. 5.4 Shotcrete Cover Coats |
78 | Sec. 5.5 Waterstops and Sealants Sec. 5.6 Elastomeric Bearing Pads and Sponge Fillers |
79 | Sec. 5.7 Tolerances |
80 | Sec. 5.8 Cleaning and Disinfection Sec. 5.9 Backfill Sec. 5.10 Electrical Grounding SECTION 6: WATERTIGHTNESS Sec. 6.1 General |
81 | Table 5 Watertightness criteria |
82 | Sec. 6.2 Testing |
83 | Sec. 6.3 Repairs |
84 | SECTION 7: OBSERVATIONS |
85 | APPENDIX A Bibliography |
87 | APPENDIX B Observation Procedures SECTION B.1: SCOPE SECTION B.2: OBSERVATIONS DURING CONSTRUCTION Sec. B.2.1 General Sec. B.2.2 Observations of cast-in-place concrete construction |
90 | Sec. B.2.3 Observations of precast panels Sec. B.2.4 Observations of shotcrete cover coats |
91 | SECTION B.3: OBSERVATIONS AFTER CONSTRUCTION Sec. B.3.1 General Sec. B.3.2 Watertightness |
92 | Sec. B.3.3 Walls Sec. B.3.4 Repairs Sec. B.3.5 Disinfection SECTION B.4: OBSERVATIONS DURING ROUTINE MAINTENANCE |
93 | Sec. B.4.1 Floor and footing Sec. B.4.2 Wall |
94 | Sec. B.4.3 Roof |