Shopping Cart

No products in the cart.

ACI 346M 09 2009

$21.40

346M-09: Specification for Cast-in-Place Concrete Pipe – METRIC

Published By Publication Date Number of Pages
ACI 2009 10
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Architect/Engineer can make this specification applicable to any project by citing it in the Project Specification. Supplements can be made by designating or specifying individual project requirements as needed. This document must be used in conjunction with ACI 301M. Inclusion of this document in a Project Specification, with mandatory checklist items, will provide necessary default values for mandatory checklist items in ACI 301M. Keywords: cast-in-place concrete pipe (CIPCP); circumferential cracking; concrete pipe; longitudinal cracking; no-joint pipe.

PDF Catalog

PDF Pages PDF Title
3 CONTENTS
PART 1— GENERAL
1.1— Scope
1.1.1
1.1.2
1.2—Definitions
4 1.3—Referenced standards
1.3.1 ACI standards
1.3.2 ASTM standards
1.4—System description
1.5—Submittals
1.5.1 Pipe geometry reports
1.5.2 Concrete mixture
1.5.3 Test reports
1.5.4 Sealants
1.5.5 Quality assurance
PART 2— PRODUCTS
2.1— Materials
2.1.1 Concrete
2.1.1.1 Slump
2.1.1.2 Compressive strength
2.1.1.3 Sulfate resistance
2.1.2 Reinforcement dowel
2.1.3 Sealant
2.1.4 Polyethylene film
2.1.5 Curing compound
5 PART 3— EXECUTION
3.1— Preparation
3.1.1 Trench
3.1.1.1 Excavation
3.1.1.2 Unstable soils
3.1.1.2.a
3.1.1.3 Trench repair
3.1.1.4 Backfill material
3.2—Construction
3.2.1 Tolerances and geometry
3.2.1.1 Horizontal and vertical alignment
3.2.1.1.a Grade
3.2.1.1.b Alignment
3.2.1.2 Wall thickness
3.2.1.3 Pipe diameter tolerances
3.2.1.4 Offset tolerances
3.2.2 Concrete placement
3.2.2.1 Placement method
3.2.2.2 Construction joint
3.2.2.2.a Cold joint
3.2.2.2.b Collar
3.2.2.3 Finish
3.2.3 Curing, backfilling, and cleanup
3.2.3.1 Curing
3.2.3.2 Exterior curing
3.2.3.2.a Polyethylene film curing method
3.2.3.2.b Pigmented membrane-curing compound method
3.2.3.3 Interior curing
3.2.3.4 Backfill operations
6 3.2.3.4.a
3.2.3.4.b
3.3—Repair
3.3.1 Crack repair
3.3.2 Circumferential cracks
3.3.3 Longitudinal cracks
3.3.3.1
3.4—Field quality control
3.4.1 Load tests
3.4.1.1 Sandbox test
3.4.1.2 Wheel load test
3.4.2 Hydrostatic test
3.4.3 Trench grade
NOTES TO SPECIFIER General notes
G1.
G2.
G3.
G4.
G5.
FOREWORD TO CHECKLISTS
F1.
7 F2.
F3.
F4.
F5.
F6.
F7. Recommended References
MANDATORY REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
8 SUBMITTALS CHECKLIST
ACI 346M 09 2009
$21.40