{"id":286517,"date":"2024-10-19T19:24:48","date_gmt":"2024-10-19T19:24:48","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-7346-62005\/"},"modified":"2024-10-25T16:18:20","modified_gmt":"2024-10-25T16:18:20","slug":"bs-7346-62005","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-7346-62005\/","title":{"rendered":"BS 7346-6:2005"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | BRITISH STANDARD <\/td>\n<\/tr>\n | ||||||
2<\/td>\n | Committees responsible for this British\ufffdStandard <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Introduction <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | 1 Scope 2 Normative references 3 Terms and definitions 4 Type of cable <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Table 1 – Building services incorporating circuits for cable systems 5 Cable integrity under fire conditions 5.1 Point of failure 5.2 Fire survival time 5.3 Temperature criteria (operating temperature) <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 5.4 Direct mechanical impact criteria 5.5 Water drenching criteria 5.6 Testing 6 Installations <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Annex A (informative) Additional information regarding building service cable\ufffdsystems other than\ufffdSHEVS Table A.1 – Building services incorporating circuits for cable systems other than\ufffdSHEVS <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Annex B (normative) Test method B.1 Principle B.2 Test apparatus B.2.1 Test equipment <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Figure B.1 – Schematic of test configuration <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | Figure B.2 – Plan view of fire test equipment <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Figure B.3 – End elevation of fire test equipment <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | B.2.2 Vertical test ladder and its mounting Figure B.4 – Rubber bush <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | Continuity and voltage checking arrangement Source of heat Figure B.5 – Burner face <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | Shock-producing device Water jet device Test wall Test chamber <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Figure B.6 – Position of water jet device <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | Figure B.7 – Temperature measuring arrangement <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | B.3 Verification procedure for source of heat B.4 Test sample B.4.2 Sample mounting <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Figure B.8 <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Figure B.9 – Detailed section of adjusted position of mounting of a sample\ufffdfor\ufffdtest <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | B.5 Cable test procedure B.5.5 Duration of fire with impact phase <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Figure B.10 – Basic circuit diagram <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | B.6 Test report Annex C (informative) Calculation of a fire-fighting jet to a test house jet <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Components for smoke and heat control systems – Specifications for cable systems<\/b><\/p>\n |