AWWA C509 2009
$75.83
AWWA C509-09: Resilient Seated Gate Valves For Water Supply Service
Published By | Publication Date | Number of Pages |
AWWA | 2009 | 42 |
This standard covers iron-body, resilient-seated gate valves, including tapping gate valves, with nonrising stems (NRS) and outside-screw-and-yoke (OS&Y) rising stems for water supply service.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ANSI/AWWA C509-09 |
3 | Committee Personnel |
5 | Contents |
7 | Foreword I. Introduction. |
8 | II. Special Issues. |
9 | III. Use of This Standard. |
10 | IV. Major Revisions. V. Comments. |
11 | AWWA Standard Resilient-Seated Gate Valves for Water Supply Service SECTION 1: GENERAL Sec. 1.1 Scope |
12 | Sec. 1.2 Purpose Sec. 1.3 Application SECTION 2: REFERENCES |
15 | SECTION 3: DEFINITIONS SECTION 4: REQUIREMENTS Sec. 4.1 Data to Be Supplied by the Manufacturer |
16 | Sec. 4.2 Materials |
19 | Table 1 Design valve stem input torque Sec. 4.3 General Design Sec. 4.4 Detailed Design |
20 | Table 2 Minimum thickness of body and bonnet |
21 | Table 3 Minimum thickness for ductile-iron connecting end flanges Table 4 Excess flange thickness |
23 | Table 5 Stem gate, thrust collar, and stem nut copper alloys |
25 | Table 6 Stainless-steel valve stem alloys Table 7 Minimum diameter of stem and minimum number of turns to open |
27 | Table 8 Outside diameter of handwheels |
28 | Table 9 Gear ratios Sec. 4.5 Fabrication |
29 | SECTION 5: VERIFICATION Sec. 5.1 Testing |
30 | Table 10 Proof-of-design torque Sec. 5.2 Production Testing Sec. 5.3 Plant Inspection and Rejection |
31 | SECTION 6: DELIVERY Sec. 6.1 Marking Sec. 6.2 Packaging and Shipping Sec. 6.3 Affidavit of Compliance |
33 | APPENDIX A SECTION A.1: GENERAL SECTION A.2: UNLOADING |
34 | SECTION A.3: INSPECTION PRIOR TO INSTALLATION SECTION A.4: STORAGE SECTION A.5: INSTALLATION Sec. A.5.1 Bolts Sec. A.5.2 Underground Installation |
35 | Sec. A.5.3 Aboveground Installations Sec. A.5.4 Inspection Sec. A.5.5 Hydrostatic Testing |
36 | Sec. A.5.6 Records Sec. A.5.7 Application Hazards |
37 | SECTION A.6: INSPECTION AND MAINTENANCE Sec. A.6.1 Valve Exercising Sec. A.6.2 Inspection |
38 | Sec. A.6.3 Record Keeping SECTION A.7: REPAIRS |