Shopping Cart

No products in the cart.

AWWA C509 2009

$75.83

AWWA C509-09: Resilient Seated Gate Valves For Water Supply Service

Published By Publication Date Number of Pages
AWWA 2009 42
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This standard covers iron-body, resilient-seated gate valves, including tapping gate valves, with nonrising stems (NRS) and outside-screw-and-yoke (OS&Y) rising stems for water supply service.

PDF Catalog

PDF Pages PDF Title
1 ANSI/AWWA C509-09
3 Committee Personnel
5 Contents
7 Foreword
I. Introduction.
8 II. Special Issues.
9 III. Use of This Standard.
10 IV. Major Revisions.
V. Comments.
11 AWWA Standard Resilient-Seated Gate Valves
for Water Supply Service
SECTION 1: GENERAL
Sec. 1.1 Scope
12 Sec. 1.2 Purpose
Sec. 1.3 Application
SECTION 2: REFERENCES
15 SECTION 3: DEFINITIONS
SECTION 4: REQUIREMENTS
Sec. 4.1 Data to Be Supplied by the Manufacturer
16 Sec. 4.2 Materials
19 Table 1 Design valve stem input torque
Sec. 4.3 General Design
Sec. 4.4 Detailed Design
20 Table 2 Minimum thickness of body and bonnet
21 Table 3 Minimum thickness for ductile-iron connecting end flanges
Table 4 Excess flange thickness
23 Table 5 Stem gate, thrust collar, and stem nut copper alloys
25 Table 6 Stainless-steel valve stem alloys
Table 7 Minimum diameter of stem and minimum number of turns to open
27 Table 8 Outside diameter of handwheels
28 Table 9 Gear ratios
Sec. 4.5 Fabrication
29 SECTION 5: VERIFICATION
Sec. 5.1 Testing
30 Table 10 Proof-of-design torque
Sec. 5.2 Production Testing
Sec. 5.3 Plant Inspection and Rejection
31 SECTION 6: DELIVERY
Sec. 6.1 Marking
Sec. 6.2 Packaging and Shipping
Sec. 6.3 Affidavit of Compliance
33 APPENDIX A
SECTION A.1: GENERAL
SECTION A.2: UNLOADING
34 SECTION A.3: INSPECTION PRIOR TO
INSTALLATION
SECTION A.4: STORAGE
SECTION A.5: INSTALLATION
Sec. A.5.1 Bolts
Sec. A.5.2 Underground Installation
35 Sec. A.5.3 Aboveground Installations
Sec. A.5.4 Inspection
Sec. A.5.5 Hydrostatic Testing
36 Sec. A.5.6 Records
Sec. A.5.7 Application Hazards
37 SECTION A.6: INSPECTION AND MAINTENANCE
Sec. A.6.1 Valve Exercising
Sec. A.6.2 Inspection
38 Sec. A.6.3 Record Keeping
SECTION A.7: REPAIRS
AWWA C509 2009
$75.83