Shopping Cart

No products in the cart.

ACI 304.2R 17:2017 Edition

$29.52

304.2R-17 Guide to Placing Concrete by Pumping Methods

Published By Publication Date Number of Pages
ACI 2017 24
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This guide discusses the use of pumps for transporting and placing concrete. Rigid and flexible pipelines, couplings and other accessories, and the various types of concrete pumps are discussed. The importance of proportioning a pumpable concrete mixture is emphasized with reference to sources for further direction on its design. Evaluation of trial mixtures to ensure pumpability and strength is encouraged. Of specific importance is a discussion on the use of lightweight aggregates. Methods to saturate these aggregates and provide a consistent moisture content are discussed. Preconstruction planning for equipment placement and line routing are emphasized. Discussions on achieving a consistent mixture and its critical importance are also addressed.

PDF Catalog

PDF Pages PDF Title
3 TITLE PAGE
4 CHAPTER 1—INTRODUCTION AND SCOPE
1.1—Introduction
1.2—Scope
CHAPTER 2—DEFINITIONS
CHAPTER 3—PUMPING CONCRETE
3.1—Mixture component distribution
5 3.2—Disruptions to flow
6 CHAPTER 4—PUMPING EQUIPMENT AND COMPONENTS
4.1—Piston pumps
4.2—Valve types
7 4.3—Trailer pumps
4.4—Truck-mounted concrete pumps
8 4.5—Separate placing booms
4.6—Specialized equipment
4.7—Pipeline and accessories
11 4.8—Flexible system hose types and applications
4.9—Concrete placing system accessories
13 CHAPTER 5—PUMPABLE CONCRETE
5.1—Basic considerations
5.2—Normalweight aggregate
14 5.3—Lightweight aggregate concrete
5.4—Water and slump
16 5.5—Cementitious materials
5.6—Admixtures
5.7—Fiber reinforcement
17 5.8—Trial mixtures and pumpability testing
5.9—Estimating performance
CHAPTER 6—FIELD PRACTICES
6.1—General
18 6.2—Pipeline concrete placement
19 6.3—Powered boom placement
20 6.4—Equipment and operational safety
6.5—Reduction in air content
21 CHAPTER 7—FIELD CONTROL
CHAPTER 8—REFERENCES
Authored documents
ACI 304.2R 17
$29.52