ACI 336.3R 14:2014 Edition

$41.98

336.3R-14 Report on Design and Construction of Drilled Piers

Published By Publication Date Number of Pages
ACI 2014 34
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This report covers design and construction of 30 in. (760 mm) diameter or larger foundation piers constructed by excavation of a hole in a subgrade that is later filled with concrete. The 30 in.(760 mm) diameter boundary is an arbitrary size; smaller-diameter drilled piers can be designed and installed in accordance with ACI 543R. Although determination of overall pier size and concrete section design are two basic drilled pier design procedures, emphasis is focused on the determination of overall pier size, which is affected by the interaction between subgrade and pier. Because pier capacity is significantly affected by construction means and methods, the licensed design professional should understand these limitations. Construction methods described include excavation, casing, reinforcing steel installation, and concrete placement.Acceptance criteria and recommended procedures for construction, engineering, and evaluation are presented. Keywords: bearing capacity; caisson; casing; excavation; foundation; geotechnical engineering; lateral pressure; lining; slurry; tremie.

PDF Catalog

PDF Pages PDF Title
3 CONTENTS
4 CHAPTER 1— INTRODUCTION AND SCOPE
1.1—Introduction
1.2—Scope
CHAPTER 2— NOTATION AND DEFINITIONS
2.1—Notation
2.2—Definitions
5 CHAPTER 3— GENERAL CONSIDERATIONS
3.1—General
3.2—The structural and geotechnical teams
6 3.3—Factors to consider
3.4—Pier types
7 3.5—Geotechnical considerations
9 CHAPTER 4— DESIGN
4.1—Loads
10 4.2—Loading conditions
11 4.3—Vertically loaded piers
4.4—Laterally loaded piers
17 4.5—Piers socketed in rock
18 4.6—Strength design of piers
4.7—Pier configuration
19 CHAPTER 5— CONSTRUCTION MEANS AND METHODS
5.1—Excavation and casing
20 5.2—Placing reinforcement
5.3—Dewatering, concreting, and removal of casing
21 5.4—Slurry displacement method
23 5.5—Safety
24 CHAPTER 6— CONSTRUCTION ENGINEERING AND TESTING
6.1—Scope
6.2—Geotechnical field representative
6.3—Preconstruction activities
25 6.4—Construction geotechnical engineering procedures
27 6.5—Concrete placement
29 6.6—Post-construction assessment
6.7—Reports
6.8—Criteria for acceptance
30 6.9—Corrective measures
CHAPTER 7— REFERENCES