Shopping Cart

No products in the cart.

ACI 548.4 11:2012 Edition

$25.73

548.4-11 Specification for Latex-Modified Concrete Overlays

Published By Publication Date Number of Pages
ACI 2012 12
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Reference Specification covers styrene-butadiene latex-modified concrete (LMC) as an overlay on concrete bridge decks and other structures. It applies to both new construction and rehabilitation of existing structures. It includes certification requirements of the latex products, storage, handling, surface preparation, mixing, application, and limitations. Keywords: bridge decks; latex-modified concrete; mixing; resurfacing.

PDF Catalog

PDF Pages PDF Title
3 CONTENTS
CONTENTS
4 PART 1— GENERAL
PART 1— GENERAL
1.1—Scope
1.1—Scope
1.1.1
1.1.1
1.1.2
1.1.2
1.2—Units
1.2—Units
1.3—Definitions
1.3—Definitions
1.4—Referenced standards
1.4—Referenced standards
1.4.1 American Concrete Institute
1.4.1 American Concrete Institute
1.4.2 ASTM standards
1.4.2 ASTM standards
1.4.3 Federal Highway Administration
1.4.3 Federal Highway Administration
1.4.4 International Concrete Repair Institute (ICRI)
1.4.4 International Concrete Repair Institute (ICRI)
1.4.5 Standards-producing organizations
1.4.5 Standards-producing organizations
5 1.5—Submittals
1.5—Submittals
1.5.1
1.5.1
1.5.1.1
1.5.1.1
1.5.1.2
1.5.1.2
1.5.1.3
1.5.1.3
1.5.1.4
1.5.1.4
1.6—Quality assurance
1.6—Quality assurance
1.6.1 Labeling
1.6.1 Labeling
1.7—Storage and handling
1.7—Storage and handling
1.7.1 Storage of materials
1.7.1 Storage of materials
1.7.2 Handling of materials
1.7.2 Handling of materials
PART 2— PRODUCTS
PART 2— PRODUCTS
2.1—Materials
2.1—Materials
2.1.1 Latex
2.1.1 Latex
2.1.2 Aggregate
2.1.2 Aggregate
2.1.3 Cement
2.1.3 Cement
2.1.4 Water
2.1.4 Water
2.2—Mixture proportion
2.2—Mixture proportion
2.2.1
2.2.1
2.2.2
2.2.2
2.3—Thickness
2.3—Thickness
2.3.1
2.3.1
PART 3— EXECUTION
PART 3— EXECUTION
3.1—Equipment
3.1—Equipment
3.1.1 Surface preparation
3.1.1 Surface preparation
3.1.1.1
3.1.1.1
3.1.1.2
3.1.1.2
3.1.1.3
3.1.1.3
3.1.1.4
3.1.1.4
3.1.2 Mixing
3.1.2 Mixing
3.1.2.1
3.1.2.1
3.1.2.2
3.1.2.2
3.1.2.3
3.1.2.3
3.1.3 Placement
3.1.3 Placement
3.1.4 Finishing
3.1.4 Finishing
3.1.4.1
3.1.4.1
6 3.1.4.2
3.1.4.2
3.1.4.3
3.1.4.3
3.1.4.4
3.1.4.4
3.1.4.5
3.1.4.5
3.1.5 Curing materials
3.1.5 Curing materials
3.1.5.1
3.1.5.1
3.1.5.2
3.1.5.2
3.1.5.3
3.1.5.3
3.2—Construction procedure
3.2—Construction procedure
3.2.1 Preparation
3.2.1 Preparation
3.2.1.1
3.2.1.1
3.2.1.2
3.2.1.2
3.2.1.3
3.2.1.3
3.2.1.4
3.2.1.4
3.2.1.5
3.2.1.5
3.2.1.6
3.2.1.6
3.2.1.7
3.2.1.7
3.2.1.8
3.2.1.8
3.2.1.9
3.2.1.9
3.2.1.10
3.2.1.10
3.2.1.11
3.2.1.11
3.2.1.12
3.2.1.12
3.2.1.13
3.2.1.13
3.2.2 Mixture production
3.2.2 Mixture production
3.2.2.1
3.2.2.1
3.2.2.2
3.2.2.2
3.2.3 Placement
3.2.3 Placement
3.2.3.1
3.2.3.1
3.2.3.2
3.2.3.2
3.2.3.3
3.2.3.3
7 3.2.3.4
3.2.3.4
3.2.3.5
3.2.3.5
3.2.3.6
3.2.3.6
3.2.4 Finishing
3.2.4 Finishing
3.2.4.1
3.2.4.1
3.2.4.2
3.2.4.2
3.2.4.3
3.2.4.3
3.2.4.4
3.2.4.4
3.2.4.5
3.2.4.5
3.2.5 Curing
3.2.5 Curing
3.2.5.1
3.2.5.1
3.2.5.2
3.2.5.2
3.2.5.3
3.2.5.3
3.2.5.4
3.2.5.4
3.2.5.5
3.2.5.5
3.2.6 Test specimens
3.2.6 Test specimens
3.2.6.1
3.2.6.1
3.2.6.2
3.2.6.2
3.2.7 Limitations
3.2.7 Limitations
3.2.7.1
3.2.7.1
3.2.7.2
3.2.7.2
3.3—Very-early-strength latex-modified concrete overlays (LMC-VEs)
3.3—Very-early-strength latex-modified concrete overlays (LMC-VEs)
3.3.1 Hydraulic cement
3.3.1 Hydraulic cement
3.3.2 Strength
3.3.2 Strength
3.3.3 Curing
3.3.3 Curing
NOTES TO SPECIFIER General notes
NOTES TO SPECIFIER General notes
G1.
G1.
G2.
G2.
G3.
G3.
G4.
G4.
G5.
G5.
8 FOREWORD TO CHECKLISTS
FOREWORD TO CHECKLISTS
F1.
F1.
F2.
F2.
F3.
F3.
F4.
F4.
9 F5.
F5.
F6.
F6.
F7. Recommended references
F7. Recommended references
10 MANDATORY REQUIREMENTS CHECKLIST
MANDATORY REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
OPTIONAL REQUIREMENTS CHECKLIST
SUBMITTALS CHECKLIST
SUBMITTALS CHECKLIST
ACI 548.4 11
$25.73