AISC AcceleratedSteel 2022
$43.55
Accelerated Steel Achieving Speed in Steel Bridge Fabrication
Published By | Publication Date | Number of Pages |
AISC | 2022 | 75 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Accelerated Steel – Achieving Speed in Steel Bridge Fabrication |
5 | Foreword |
7 | Table of Contents |
9 | 1.0 INTRODUCTION |
10 | 2.0 FABRICATION |
11 | 2.1 Estimating |
12 | 2.2 Bidding and Contracting |
13 | 2.3 Scheduling 2.4 Planning |
14 | 2.5 Shop Drawing Production |
18 | 2.6 Shop Drawing Approval |
19 | 2.7 Material Procurement |
21 | 2.8 Welding and Welding Procedures |
24 | 2.9 Equipment Programming 2.10 Fabrication |
28 | 2.11 Shop Assembly |
32 | 2.12 Cleaning and Coating |
37 | 2.13 Quality Control |
39 | 2.14 Shipping |
42 | 3.0 BEST PRACTICES ON BEHALF OF THE OWNER 3.1 Overview 3.2 Choosing an Engineer |
43 | 3.3 The Engineer’s Scope |
45 | 3.4 Communications 3.5 Quality Verification |
48 | 4.0 BEST PRACTICES ON BEHALF OF THE DESIGNER 4.1 Bridge Design |
53 | 4.2 Construction Support |
57 | 5.0 BEST PRACTICES ON BEHALF OF THE GENERAL CONTRACTOR 5.1 Communication |
59 | 5.2 Field Information Needed from the General Contractor 5.3 Erection Practices and the Fabrication Schedule |
61 | 5.4 Shop Instructions Reflecting the General Contractor’s Preferences |
62 | 5.5 Facilitating Approval of Routine Fabrication Practices |
63 | 6.0 BEST PRACTICES ON DESIGN/BUILD PROJECTS |
64 | 6.1 Design/Build Project Workflow and Roles |
67 | 6.2 Working with the Fabricator—Prebid |
68 | 6.3 Working with the Fabricator—After Award |
70 | 6.4 Contract Cost Terms |
71 | 6.5 Design Considerations |
73 | 7.0 REFERENCES |