ASCE 9780784408599 2007
$65.54
Waste Containment Facilities
Published By | Publication Date | Number of Pages |
ASCE | 2007 | 365 |
Daniel and Koerner provide technical guidance for ensuring construction quality control and assurance of geosynthetics used to contain waste.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | Contents |
10 | Preface |
14 | Chapter 1. Introduction to Waste Containment 1.1 Introduction |
15 | 1.2 Waste Generation |
17 | 1.3 Regulations |
21 | 1.4 A Generalized Waste-Containment System |
23 | 1.5 Natural Soil Components |
24 | 1.6 Geosynthetic Components |
27 | 1.7 Geosynthetic Clay Liners |
28 | 1.8 Other Components of Waste Containment Systems |
30 | 1.9 Importance of CQC/CQA |
32 | 1.10 Cost of CQA |
33 | 1.11 References |
36 | Chapter 2. Manufacturing Quality Assurance (MQA) and Construction Quality Assurance (CQA) Concepts and Overview 2.1 Introduction |
38 | 2.2 Responsibility and Authority |
45 | 2.3 Personnel Qualifications 2.4 Written MQA/CQA Plan |
47 | 2.5 Documentation |
51 | 2.6 Meetings |
53 | 2.7 Sample Custody |
54 | 2.8 Weather 2.9 Work Stoppages 2.10 References |
56 | Chapter 3. Compacted Clay Liners 3.1 Introduction and Background |
69 | 3.2 Critical Construction Variables That Affect Clay Liners |
88 | 3.3 Field Measurement of Water Content and Dry Unit Weight |
97 | 3.4 Recommended Procedure for Developing Water Content–Density Specification |
103 | 3.5 Inspection of Borrow Sources before Excavation |
108 | 3.6 Inspection during Excavation of Borrow Soil |
109 | 3.7 Preprocessing of Materials |
114 | 3.8 Placement of Loose Lift of Soil |
118 | 3.9 Remolding and Compaction of Soil |
129 | 3.10 Protection of Compacted Soil |
133 | 3.11 CQA Procedures for Test Pads |
140 | 3.12 Final Approval 3.13 References |
146 | Chapter 4. Geomembranes 4.1 Types of Geomembranes and Their Formulations |
159 | 4.2 Manufacturing |
176 | 4.3 Handling |
185 | 4.4 Seaming and Joining |
210 | 4.5 Protection and Backfilling |
215 | 4.6 Complete System (Sheet and Seams) Leak Prevention |
216 | 4.7 References |
220 | Chapter 5. Geosynthetic Clay Liners 5.1 Types and Composition of Geosynthetic Clay Liners |
222 | 5.2 Manufacturing |
226 | 5.3 Handling |
231 | 5.4 Installation |
235 | 5.5 Backfilling or Covering |
236 | 5.6 Exposed Geomembrane Covered GCLs |
238 | 5.7 References |
240 | Chapter 6. Soil in Drainage and Alternative Cover Systems 6.1 Introduction and Background 6.2 Material Composition |
242 | 6.3 Material Gradation |
245 | 6.4 Control of Materials |
246 | 6.5 Location of Borrow Sources |
247 | 6.6 Processing of Materials 6.7 Placement |
249 | 6.8 Compaction |
250 | 6.9 Protection |
251 | 6.10 Alternative Final Covers |
258 | 6.11 References |
260 | Chapter 7. Geosynthetic Drainage Systems 7.1 Overview 7.2 Geotextiles as Filters and Separators |
274 | 7.3 Geotextiles as Protection Materials |
276 | 7.4 Geonets and Geonet–Geotextile Geocomposites |
285 | 7.5 Other Types of Drainage Geocomposites |
292 | 7.6 References |
294 | Chapter 8. Vertical Cutoff Walls 8.1 Introduction 8.2 Types of Vertical Cutoff Walls |
303 | 8.3 Construction of Slurry Trench Cutoff Walls |
312 | 8.4 Other Types of Cutoff Walls 8.5 Hydraulic Conductivity |
318 | 8.6 Specific CQA Requirements |
324 | 8.7 Postconstruction Tests for Continuity 8.8 References |
330 | Chapter 9. Ancillary Materials, Appurtenances, and Other Details 9.1 Plastic Pipe (Also Known as “Geopipe”) |
340 | 9.2 Sumps, Manholes, and Risers |
344 | 9.3 Liner System Penetrations |
346 | 9.4 Anchor Trenches |
348 | 9.5 Access Ramps |
350 | 9.6 Geosynthetic Reinforcement Materials |
354 | 9.7 Erosion-Control Materials |
357 | 9.8 References |
360 | Index A B C |
361 | D E F G |
362 | H I L M N O P |
363 | R S T U V W |
364 | About the Authors |