ASCE 9780784409237 2007
$56.88
Civil Works for Hydroelectric Facilities
Published By | Publication Date | Number of Pages |
ASCE | 2007 | 490 |
This report explores methodologies and techniques for applying rehabilitation engineering to aging hydroelectric infrastructure.
PDF Catalog
PDF Pages | PDF Title |
---|---|
10 | Table of Contents |
18 | 1.0 CHAPTER 1 – INTRODUCTION 1.1 Objective LIST OF TABLES |
19 | LIST OF FIGURES |
20 | 1.2 About This Guideline |
21 | 1.3 Historical Perspective |
23 | 1.3.1 Dam and Hydropower Development & Aging Infrastructure |
24 | 1.3.2 Evolving Design Criteria and Regulatory Demands |
27 | 1.4 Initiating Change |
28 | 1.4.1 Make It Last Longer and Work Better |
30 | 1.5 Technical References 1.6 Collective Knowledge |
31 | 2.0 CHAPTER 2 – PLANNING AND EVALUATION 2.1 Introduction 2.2 Planning and Evaluation Process |
32 | 2.3 Identify Need for Project 2.3.1 Mandatory Actions 2.3.2 Discretionary Actions |
33 | 2.4 Assemble Data and Information and Assess Condition |
34 | 2.4.1 Sources of Information |
38 | 2.4.2 Condition Assessment |
39 | 2.4.3 Beyond Engineering |
43 | 2.5 Identify Parties Involved |
44 | 2.6 Plan and Evaluate Alternatives 2.6.1 Regulatory Considerations |
45 | 2.6.2 Cost Estimates 2.6.3 Constructability |
46 | 2.6.4 Staging and Scheduling |
47 | 2.6.5 Access 2.6.6 Contracting Options |
48 | 2.7 Selection of Preferred Course of Action 2.7.1 Comparison of Alternatives 2.7.2 Economic Comparisons |
50 | 2.7.3 Financial Considerations 2.8 Moving Forward with a Life Extension or Upgrade Project |
51 | 2.9 Technical References |
52 | 3.0 CHAPTER 3 – INNOVATIVE TECHNOLOGIES 3.1 Introduction |
55 | 3.2 Surveillance 3.2.1 Underwater Surveillance and Remote Operated Vehicles |
56 | 3.2.2 Automation of Instrumentation and Monitoring |
57 | 3.2.3 Flow Measurement 3.3 Assessment Techniques 3.3.1 Condition Assessment |
59 | 3.3.2 Business Risk Assessment |
60 | 3.3.3 Testing |
61 | 3.4 Performance Analysis 3.4.1 Alkali-Aggregate Reaction (AAR) |
64 | 3.4.2 Reduction of Hydraulic Losses |
65 | 3.4.3 Sealing Dams and Hydraulic Structures |
67 | 3.5 Life Extension Methods 3.5.1 Underwater Repairs |
68 | 3.5.2 Construction Methods 3.5.3 Relining and Repairing Water Passages |
71 | 3.5.4 Protective Coatings |
72 | 3.5.5 Repairing Concrete and Masonry Dams |
73 | 3.5.6 Rehabilitation of Gates |
74 | 3.5.7 Use of Roller Compacted Concrete (RCC) |
75 | 3.6 Modernization (Upgrade) |
76 | 3.7 Environmental Considerations 3.7.1 Preserving Historical Structures |
77 | 3.7.2 Removal of Hazardous Materials 3.7.3 Habitat Maintenance 3.7.4 Reservoir Ice |
78 | 3.7.5 Reservoir Debris 3.7.6 Water Quality |
79 | 3.7.7 Fish Passage 3.7.8 Noise Reduction |
80 | 3.8 Management and Knowledge Systems 3.8.1 Management Approaches |
81 | 3.8.2 Decision Support 3.8.3 Guides and Standards |
82 | 3.9 Technical References |
90 | 4.0 CHAPTER 4 – STRUCTURES 4.1 Introduction |
100 | 4.2 Intakes 4.2.1 Function |
101 | 4.2.2 Problems |
102 | 4.2.3 Corrective Measures |
103 | 4.2.4 Case Histories |
110 | 4.2.5 Collective Knowledge 4.2.6 Technical References |
111 | 4.3 Dams, Spillways, and Reservoirs 4.3.1 General |
112 | 4.3.2 Concrete Dams & Spillways |
119 | 4.3.3 Embankment Dams |
126 | 4.3.4 Timber Crib Dams |
127 | 4.3.5 Reservoirs |
129 | 4.3.6 Case Histories |
172 | 4.3.7 Collective Knowledge 4.3.8 Technical References |
175 | 4.4 Powerhouses 4.4.1 Function |
176 | 4.4.2 Problems |
181 | 4.4.3 Corrective Measures |
184 | 4.4.4 Case Histories |
188 | 4.4.5 Collective Knowledge |
189 | 4.4.6 Technical References 4.5 Fish Passage Facilities 4.5.1 Function |
190 | 4.5.2 Problems |
206 | 4.5.3 Corrective Measures 4.5.4 Opportunities |
208 | 4.5.5 Case Histories |
226 | 4.5.6 Collective Knowledge |
228 | 4.5.7 Technical References 4.6 Trash Racks 4.6.1 Function |
230 | 4.6.2 Problems |
231 | 4.6.3 Corrective Measures |
233 | 4.6.4 Opportunities 4.6.5 Case Histories |
237 | 4.6.6 Collective Knowledge 4.6.7 Technical References |
238 | 4.7 Trash Rakes 4.7.1 Function |
239 | 4.7.2 Problems |
240 | 4.7.3 Corrective Measures 4.7.4 Opportunities 4.7.5 Case Histories |
244 | 4.7.6 Collective Knowledge 4.7.7 Technical References |
245 | 5.0 CHAPTER 5 – WATER CONVEYANCES 5.1 Introduction |
251 | 5.2 Intake, Canals, Flumes, and Forebays 5.2.1 Function |
252 | 5.2.2 Problems |
255 | 5.2.3 Corrective Measures |
256 | 5.2.4 Opportunities |
257 | 5.2.5 Case Histories |
262 | 5.2.6 Collective Knowledge |
263 | 5.2.7 Technical References 5.3 Tunnels, Shafts, and Other Underground Openings 5.3.1 Function |
264 | 5.3.2 Problems |
265 | 5.3.3 Corrective Measures |
266 | 5.3.4 Opportunities 5.3.5 Case Histories |
274 | 5.3.6 Collective Knowledge |
275 | 5.3.7 Technical References 5.4 Penstocks 5.4.1 Function |
276 | 5.4.2 Problems |
278 | 5.4.3 Corrective Measures |
279 | 5.4.4 Opportunities 5.4.5 Case Histories |
286 | 5.4.6 Collective Knowledge |
287 | 5.4.7 Technical References 5.5 Tailraces 5.5.1 Function |
288 | 5.5.2 Problems |
290 | 5.5.3 Corrective Measures |
291 | 5.5.4 Opportunities |
292 | 5.5.5 Case Histories |
296 | 5.5.6 Collective Knowledge 5.5.7 Technical References |
298 | 6.0 CHAPTER 6 – WATER CONTROL DEVICES 6.1 Introduction |
303 | 6.2 Gates and Gate Hoists 6.2.1 Function |
304 | 6.2.2 Problems |
325 | 6.2.3 Corrective Measures 6.2.4 Opportunities |
327 | 6.2.5 Case Histories |
338 | 6.2.6 Collective Knowledge |
340 | 6.2.7 Technical References |
341 | 6.3 Valves and Operators 6.3.1 Function |
342 | 6.3.2 Problems, Causes, Solutions |
357 | 6.3.3 Corrective Measures 6.3.4 Opportunities 6.3.5 Case Histories |
358 | 6.3.6 Collective Knowledge |
359 | 6.3.7 Technical References 6.4 Flashboards 6.4.1 Function |
361 | 6.4.2 Problems |
362 | 6.4.3 Corrective Measures |
370 | 6.4.4 Case Histories |
382 | 6.4.5 Collective Knowledge 6.4.6 Technical References |
383 | 7.0 CHAPTER 7 – ANCILLARY SYSTEMS, SAFETY AND SECURITY 7.1 Introduction 7.2 Civil Works Systems 7.2.1 Structural Instrumentation |
387 | 7.2.2 Pressure Relief Systems |
389 | 7.2.3 Flood-Proofing |
391 | 7.2.4 Oil Containment Systems |
393 | 7.3 Systems Critical for Emergency Operations |
394 | 7.3.1 Electrical Backup Power (EBP) |
399 | 7.3.2 Communications |
401 | 7.3.3 Access During Emergencies |
402 | 7.4 Recreational Project Safety |
404 | 7.5 Project Security |
408 | 7.6 References |
409 | LIST OF APPENDICES Appendix A: Hydroelectric and Dam Engineering, Library of General Resources |
424 | Appendix B: Project Information |
439 | Appendix C: Tables |
460 | Appendix D: Summary of Case Histories |
479 | Index A B C |
480 | D |
481 | E |
482 | F |
483 | G |
484 | H I |
485 | J K L M |
486 | N O P |
487 | Q R |
488 | S |
489 | T |
490 | U V W Y Z |