ASCE 9780784411094 2010
$164.13
Construction Research Congress 2010
Published By | Publication Date | Number of Pages |
ASCE | 2010 | 1623 |
This collection contains 156 peer-reviewed papers presented at the 2010 Construction Research Congress, held in Alberta, Canda, May 8-10, 2010.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Cover |
2 | Volume I |
10 | Contents |
22 | Automated/Real Time Systems 3D Visualization for Tunnel Boring Machine Steering and Alignment Control in Microtunneling |
32 | Automated Multiple Objects Tracking System (AMOTS) |
42 | Resource Performance Indicators in Controlling Industrial Steel Projects |
52 | Application of Sensing Technology to Safety Management |
62 | Automated Materials Tracking and Locating: Impact Modeling and Estimation |
72 | Automated Model-Based Recognition of Progress Using Daily Construction Photographs and IFC-Based 4D Models |
82 | Construction Activity Classification Using Accelerometers |
92 | Evaluation the Electric Consumption of Residential Buildings: Current Practices and Future Prospects |
102 | Automatically Tracking and Guiding Underground Tunnel Boring Machines during Microtunneling and Pipe Jacking Operations |
112 | Geospatial Databases and Augmented Reality Visualization for Improving Safety in Urban Excavation Operations |
123 | Real Time Information Integration via i-Booth |
133 | Real-Time Spatial Location Tracking of Construction Resources in Lay Down Yards |
143 | Semi-Automated As-Built Modeling of Light Rail System Guide Beams |
153 | Construction Industry Institute Research Blind Spot Measurements for Real-Time Pro-Active Safety in Construction |
163 | Identification and Assessment of Cost Estimating Competencies |
172 | Improving Project Performance Using the Project Health Indicator Tool |
183 | Quality Management Systems in the Capital Facilities Delivery Industry: Analysisof Best Practices in Leadership and Third-Party Certification |
193 | Construction Education An IDP-BIM Framework for Reshaping Professional Design Practices |
204 | Construction Engineering Education: Need, Content, Learning Approaches |
215 | Identifying Competencies for Baccalaureate Level Construction Education: Enhancing Employability of Young Professionals in the Construction Industry |
226 | Interdisciplinary Team Learning in the Context of Integrated Design Studio |
236 | Repositioning the Faculty Internship Experience in Construction Management |
247 | The Need and Challenges for Interdisciplinary Education in AEC |
257 | Virtual Construction Project Field Trips Using Remote Classroom Technology |
267 | Construction Modeling and Simulation A Case Study for Integrating Lean Six-Sigma and RFID Applications in Construction Processes through Simulation Approach |
278 | A Simulation Driven Visualization Framework for Construction Operations: Development and Application |
288 | An Integrated System to Select, Position, and Simulate Mobile Cranes for Complex Industrial Projects |
298 | An Optimization Model for Dynamic Multi-Project Environment in Construction |
309 | BIM-Integrated Sustainable Material and Renewable Energy Simulation |
319 | Exploring the Effects of Context Level Factors on the Structural Steel FabricationShop Operation |
329 | Korean Real Estate Market and Mortgage Lending Policies: A Quantitative Approach |
339 | Lessons Learned from Utilizing Building Information Modeling for Construction Management Tasks |
349 | Multi-Objective Dynamic Simulation-Optimization for Equipment Allocation of Earthmoving Operations |
360 | Real-Time Data Collection and Visualization Technology in Construction |
370 | Simulation-Based Multiple Heavy Lift Planning in Industrial Construction |
380 | Spatial Trajectory Analysis for Cranes Operations on Construction Sites |
390 | State-Based Simulation Mechanism for Facilitating Project Schedule Updating |
400 | Studying Dynamic Decision-Making in Construction Management Using Adaptive Interactive Simulations |
410 | System Dynamics Modeling of a Safety Culture Based on Resilience Engineering |
419 | Virtual Organizational Imitation for Construction Enterprises (VOICE): Managing Business Complexity Using Agent Based Modeling |
430 | Disaster Planning and Mitigation A Method to Develop and Optimize the Placement of Road Barriers in Emergency Evacuation for University Campuses |
441 | Developing Optimal Hazard Investment Strategies |
451 | Development of an Index to Rate the Completeness and Quality of Mitigation Project Definition |
461 | Optimizing Alternative Housing Projects in the Aftermath of Natural Disasters |
470 | Vulnerability Assessment of Critical Infrastructure, Associated Industries, and Communities during Extreme Events |
480 | Information Technology and Computer Applications 2D Vision Tracking Methods’ Performance Comparison for 3D Tracking of Construction Resources |
491 | A Decision Support System for Integrating Corrective Maintenance, Preventive Maintenance, and Condition-Based Maintenance |
501 | A GIS Framework for Construction Equipment Request and Deployment during Emergency Response |
511 | Visually Scheduling Construction Projects |
521 | Assessment of Internet Based Systems for Construction Product Information |
530 | BIM for Integration of Automated Real-Time Project Control Systems |
539 | Defining High-Level Project Control Data for Visual Information Systems |
549 | Towards a Cyber-Physical Systems Approach to Construction |
559 | Use of As-Built Building Information Modeling |
570 | Infrastructure Management and Underground Construction A Novel Approach to Measuring Ground Movements Associated with Trenchless Construction Techniques |
579 | A Stochastic Method for Condition Rating of Concrete Bridges |
589 | Analysis of Injury and Fatal Crashes in Highway Construction Zones |
599 | Community-Driven and Reliability-Based Budget Allocation for Water Networks |
609 | Development of an Innovative Free-Swimming Device for Detection of Leaks in Oil and Gas Pipelines |
618 | Analyzing Municipal Blockage Failure Datasets for Sewer Systems |
628 | Framework for Web-Based Highway Construction Geospatial Data Management |
638 | Infrastructure and Energy OR Energy and Infrastructure: How Energy Demandand Infrastructure Impact Each Other and What Carbon Limits Will Mean for Both |
648 | Integrating GPS and Laser Technology to Map Underground Utilities Installed Using Open Trench Method |
658 | Large-Scale Column Detection for Bridge Inspection |
668 | Review of Wireless Sensors for Road and Bridge Asset Management |
677 | Semantic Representation of Infrastructure Interdependencies: Rethinking Infrastructure Design and Management |
687 | Towards Optimum Condition Assessment Policies for Water and Sewer Networks |
697 | Knowledge Management e-Society: A Community Engagement Framework for Construction Projects |
708 | Knowledge Management Systems for Construction |
718 | The Embedment of a Knowledge Management Program in an AEC Organization |
729 | Using Lean Theory to Identify Waste Associated with Information Exchanges on a Building Project |
738 | Organizational Leadership and Management A Game Theoretic Approach to Understand Opportunistic Behavior in Project Network Subcontractor Selection |
748 | A Tool for Improving Construction Organizations’ Innovation Capabilities |
758 | Conflict Management in Concurrent Engineering: A Case Study |
768 | Establishing a Collaborative Environment among Project Stakeholders |
778 | Governance Challenges of Infrastructure Delivery: The Case for Socio-Economic Governance Approaches |
789 | Knowledge System Conflicts in Global Project Networks |
799 | Theoretical Categories of Successful Collaboration and BIM Implementation within the AEC Industry |
810 | The Evolution of Collaboration within Inter-Organizational Networks of Temporary Project Teams |
820 | The Leadership Flexibility Space |
830 | Understanding Withdrawal Behavior in the Construction Industry |
838 | When Are Public-Private Partnerships Not an Appropriate Governance Structure? Case Study Evidence |
857 | Volume II |
877 | Procurement, Contracting, and Legal Affairs A Critical Analysis of Innovations in Construction Manager-at-Risk Project Delivery |
887 | Emergency Accelerated Construction |
899 | Assessment of Responsibilities of Project Teams for Owner Managing Contractor Tasks—A Fuzzy Consensus Approach |
909 | Comparison of Water/Wastewater Project Performance by Project Delivery Systemand Payment Provision |
919 | Configurational Comparative Methods for Aligning PPP Strategies with Public-Policy Objectives |
929 | Construction Legal Decision Support Using Support Vector Machine (SVM) |
939 | Contracting Strategy Decision Framework for Highway Maintenance |
949 | Developing a Framework for Construction Contractor Qualification for Surety Bonding |
959 | Effect of Culture on Selection of Dispute Resolution Methods in International Contracts |
969 | Guidelines for a Standard Project Partnering Contract |
979 | Implementation of a Decision Support System for Commercial Evaluation and Selection of Equipment Suppliers |
989 | Interaction of Processes and Phases in Project Scheduling Using BIM for A/E/C/FM Integration |
999 | Model for Legal Principles of Compensation for Errors in Bills of Quantities: A Law and Economic Analysis |
1010 | Productivity, Benchmarking, and Workforce Issues Assessment of Direct Work Utilization at the Workface in the U.S. Construction Industry (1972-2008) |
1020 | Bi-Level Framework for Measuring Performance to Improve Productivity of Construction Enterprises |
1030 | Causes of Variation in Construction Task Starting Times and Duration |
1040 | Comparison of Construction Labor Productivity between U.S. and China |
1050 | Development of Performance Measurement Framework for Value Management Studies in Construction |
1060 | Emergent Themes of Instruments Used to Measure Safety Climate in Construction |
1070 | From Construction Project Success to Integrated Construction Project Selection |
1080 | Top 10 Areas for Construction Productivity Improvement on Alberta Oil and Gas Construction Projects |
1089 | Principles for Utilization of Construction Equipment Operator Training Simulators |
1097 | The Relationship between the Maturity of Safety Management Practices and Performance |
1107 | Validity of Industry Benchmarks and Metrics for Engineering Productivity |
1114 | Worker Satisfaction and Work-Life Related Characteristics in the U.S. Construction Industry |
1124 | Project Planning and Control A Framework for Evaluating the Effect of Fast-Tracking Techniques on Project Performance |
1134 | A New Approach for Resource-Constrained Multi-Project Scheduling |
1144 | An Analytical Framework for Incorporating Projects Supply Chain Problems into Project Plan |
1153 | Analysis of Temporary Traffic Control Cost Items in Transportation Construction Bidding Process |
1165 | Assessment of the Impact of Inter-Organizational Interactions on Project Metrics |
1175 | Front End Planning for Infrastructure Projects |
1186 | Implementation of Building Information Modeling (BIM) in Modular Construction: Benefits and Challenges |
1196 | Improved Procedures for Business Accommodation on Transportation Construction Projects |
1205 | Modeling Cash Flow Profiles with Singularity Functions |
1215 | Modeling Resource Profiles with Singularity Functions |
1225 | Activity Overlapping Assessment in Construction, Oil, and Gas Projects |
1235 | Optimizing Labor Utilization in Multiple Shifts for Construction Projects |
1244 | Optimizing Material Logistics Planning in Construction Projects |
1254 | Progress Monitoring of Construction Projects Using Statistical Pattern Recognition |
1264 | Significant Factors Affecting Right-of-Way Acquisition Time in Highway Projects |
1274 | Using Key Date Matrix (KDM) to Minimize Risk in Semiconductor Facility Projects |
1284 | Project Risk Assessment and Management A Decision Model for Technology Selection in Renovation Project Planning |
1294 | A Valuation Model for Choosing the Optimal Minimum Revenue Guarantee (MRG) in a Highway Project: A Real-Option Approach |
1304 | Classification of Risks for International Construction Joint Ventures (ICJV) Projects |
1314 | Interrelationships among Construction Injury Prevention Strategies: A Cross-Impact Analysis |
1324 | Quantitative Assessment of Horizontal Directional Drilling Project Risk Using Fuzzy Fault Tree Analysis |
1334 | The Application of Utility Theory in the Decision-Making Process for Investing in ADR Insurance |
1346 | The Impact of Regulatory Licensing Processes on U.S. Civilian Nuclear Power Plant Project Performance |
1357 | Quantitative Methods and Models A Financial Market Entry Decision Model for International Construction Business Using Real Option Analysis and Monte Carlo Simulation |
1366 | An Application of ELECTRE III to Contractor Selection |
1375 | Embeddedness and Collaborative Venture Networks for Overseas Construction Projects |
1385 | Field Measurement of Concrete Lateral Pressure in Formwork |
1395 | Forecasting ENR Construction Cost Index: A Time Series Analysis Approach |
1406 | Influence Factor-Based Safety Risk Assessment Methodology for Construction Site |
1416 | Sustainable Construction and Facilities “Sustainability by…” A Synthesis of Procurement Approaches for High Performance Buildings |
1426 | A Unified Process Approach to Healthcare Project Delivery: Synergies between Greening Strategies, Lean Principles, and BIM |
1436 | An Integrated Condition Assessment Model for Buildings |
1446 | The Application of Visualization for Construction Emission Monitoring |
1456 | Calculation of Greenhouse Gas Emissions Associated with Highway Construction Projects Using an Integrated Life Cycle Assessment Approach |
1466 | Decision Making Processes and the Adoption of Energy Saving Techniques in Social Housing |
1477 | Exploring the Validity of Qualitative Methods to Analyze Project Delivery of Sustainable, High Performance Buildings |
1487 | Identifying Factors that Affect the Energy Consumption of Residential Buildings |
1497 | Impact of Sustainability Perceptions on the Purchasability of Materials in Construction Projects |
1507 | Leadership in Energy and Environmental Design Certification of a Project in Alachua County: An Analysis of the 2007 Florida Building Code and the Alachua County Unified Land Development Code for LEED 2009 |
1517 | Life Cycle Assessment Modeling of Heavy Construction Activities |
1527 | Life Cycle Cost Analysis and Real Option Theory for Improved Sustainability in Existing Buildings |
1537 | Life Cycle Cost Analysis of Hybrid Chiller Plants under Dynamic Utility Prices |
1548 | Modeling Construction Waste Generation towards Sustainability |
1558 | Current Status of C&D Waste Management and Green Building Standards in Canada |
1568 | Process-Based Approach in Sustainable Impact Analysis of Rebar Supply System |
1578 | Shale Oil—An Opportunity to Revive the Construction Industry and Economy while Increasing Energy and Construction Job Security |
1588 | Carbon Footprints Analysis for Tunnel Construction Processes in the Preplanning Phase Using Collaborative Simulation |
1597 | Canadian Industry Practitioners Perception on LEED Credits |
1607 | A GIS Framework for Reducing GHG Emissions in Concrete Transportation |
1617 | Indexes Author Index A B C D E |
1618 | F G H I J K |
1619 | L M N O P S |
1620 | T U V W X Y Z |
1621 | Subject Index A B C D E F |
1622 | G H I J K L M N O P |
1623 | Q S T U V W |