ASHRAE Guideline 1.2 2019 SPANISH
$47.13
ASHRAE Spanish – Guideline 1.2-2019 — Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies
Published By | Publication Date | Number of Pages |
ASHRAE | 2019 | 84 |
This is a Spanish translation of Guideline 1.2, Technical Requirements for the Commissioning Process for Existing HVAC&R Systems and Assemblies.ASHRAE Guideline 1.2 provides requirements for the application of the Commissioning (Cx) Process described in ASHRAE Guideline 0.2 to existing heating, ventilating, air-conditioning, and refrigerating (HVAC&R) systems and assemblies.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ASHRAE Directriz 1.2-2019, Requisitos Técnicos del Proceso de Commissioning para Sistemas e Instalaciones Existentes de Climatización y Refrigeración |
5 | ÍNDICE |
6 | PRÓLOGO OBJETO ALCANCE DEFINICIONES Y ABREVIATURAS DESCRIPCIÓN DEL PROCESO |
7 | PLANIFICACIÓN DE CARTERA DE EDIFICIOS |
11 | EVALUACIÓN |
17 | INSPECCIÓN |
30 | IMPLANTACIÓN |
38 | ENTREGA |
40 | COMMISSIONING EN CONTINUO |
44 | ANEXO INFORMATIVO EMUESTRA DE SOLICITUD DEPROPUESTAS PARA UN PROYECTO EECx |
46 | ANEXO INFORMATIVO JREQUERIMIENTOS ACTUALES DEL EDIFICIO |
56 | ANEXO INFORMATIVO L2EJEMPLO DE INFORMEDE LA FASE DE INSPECCIÓN |
84 | Back Page |