ASHRAE UserManual 90.1 2019
$79.63
ASHRAE Standard 90.1 User’s Manual (Based On ANSI/ASHRAE/IES Standard 90.1-2019)
Published By | Publication Date | Number of Pages |
ASHRAE | 2019 | 462 |
ANSI/ASHRAE/IES Standard 90.1, Energy Standard for Buildings Except Low-Rise Residential Buildings, has been a benchmark for commercial building energy codes in the United States and a key basis for codes and standards around the world for more than 40 years. The standard provides the minimum requirements for energy-efficient design of most buildings, except low-rise residential buildings. It is an indispensable reference for engineers and other professionals involved in design of buildings and building systems.Because the standard is written in mandatory language and therefore not intended as a design specification or an instruction manual, this User
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Standard 90.1 User’s Manual |
5 | Contents Contents |
10 | Preface General Information Addenda Official Interpretations of the Standard Standard 90.1 Organization Numbering System |
12 | Organization and Use of Standard 90.1 User’s Manual I-P and SI units Resources, Data, and Analysis Tools |
14 | Acknowledgments |
15 | 1. Purpose Overview |
16 | 2. Scope Authority of Standard 90.1 Scope of the Standard |
18 | 3. Definitions, Abbreviations, and Acronyms Definitions Abbreviations and Acronyms |
21 | 4. Administration and Enforcement Scope and Compliance (4.1 and 4.2) |
22 | New Buildings (4.1.1.1 and 4.2.1.1) Existing Buildings (4.1.1.2, 4.1.1.3, 4.1.1.4, 4.2.1.2, and 4.2.1.3) Additions (4.1.1.2 and 4.2.1.2) |
23 | Alterations (4.1.1.3 and 4.2.1.3) |
24 | Building Alterations—Exceptions and Explanations Changes in Space Conditioning (4.1.1.5) Administrative Requirements (4.1.2) Alternative Materials, Construction Methods, or Design (4.1.3) Validity (4.1.4) Conflicts with Other Laws (4.1.5) Referenced Standards (4.1.6) |
25 | Normative Appendices (4.1.7) |
26 | Informative Appendices (4.1.8) Compliance Documentation (4.2.2) Operation and Maintenance Manuals (4.2.2.3) Labeling of Materials and Equipment (4.2.3) |
27 | Inspections (4.2.4) Verification and Commissioning Reporting (4.2.5) Building Systems Verification and Testing Requirements (4.2.5.1) |
28 | Information on Building Permit Application (4.2.5.1.1) FPT and Verification Documentation (4.2.5.1.2) Building Commissioning Requirements (4.2.5.2) |
29 | Commissioning Activities Prior to Building Permit Issuance (4.2.5.2.1) Project Commissioning Documents (4.2.5.2.2) |
30 | Activities Prior to Building Occupancy (4.2.5.2.3) |
31 | 5. Envelope General Information (5.1) Scope (5.1.1) Space-Conditioning Categories (5.1.2) Residential and Nonresidential Spaces |
33 | Space Classifications |
36 | Understanding Exterior and Semi-Exterior Building Envelope Components Shell Buildings (5.1.2.3) |
37 | Alteration of Existing Buildings (5.1.3) |
38 | Climate Zones (5.1.4) |
40 | Compliance Methods (5.2) Requirements for All Compliance Paths (5.2.1) |
41 | Prescriptive Building Envelope Compliance Path Building Envelope Trade-Off Compliance Path |
42 | Energy Cost Budget Method and Building Performance Rating Method Compliance Forms Mandatory Provisions (5.4) Insulation (5.4.1) |
43 | Steady-State Heat Flow: Understanding U-Factor and R-Value U-Factor R-Value Heat Transfer in Construction Assemblies |
44 | Fenestration and Doors (5.4.2) Air Leakage (5.4.3) Continuous Air Barrier (5.4.3.1) |
45 | Whole Building Air Leakage (5.4.3.1.1) Continuous Air Barrier Design (5.4.3.1.2) |
46 | Loading Dock Weatherseals (5.4.3.2) Vestibules and Revolving Doors (5.4.3.3) |
48 | Prescriptive Compliance Path (5.5) Using the Criteria Tables (5.5.1 and 5.5.2) |
49 | Opaque Areas (5.5.3) |
54 | Area-Weighted Averaging |
55 | Roof Insulation and Roof Construction Classes (5.5.3.1 and A2) Insulation Entirely above Deck |
56 | R-value Criteria U-factor Criteria Metal Building Roofs |
57 | R-value Criteria U-factor Criteria |
58 | Attics and Other Roofs |
60 | Cool Roofs (5.5.3.1.1) |
62 | Above-Grade Wall Insulation (5.5.3.2 and A3) Mass Walls |
63 | R-value Criteria |
65 | U-factor Criteria |
66 | Metal Building Walls |
68 | Detailed metal building wall descriptions are provided in Section A3.2.2. R-value Criteria U-factor Criteria Steel-Framed Walls R-value Criteria |
69 | U-factor Criteria |
71 | Wood-Framed and Other Walls R-value Criteria U-factor Criteria |
72 | Below-Grade Wall Insulation (5.5.3.3 and A4) R-value Criteria |
75 | C-factor Criteria |
77 | Floor Insulation (5.5.3.4 and A5) Mass Floors R-value Criteria U-factor Criteria |
79 | Steel-Joist Floors R-value Criteria U-factor Criteria Wood-Framed and Other Floors R-value Criteria U-factor Criteria |
83 | Slab-on-Grade Floor Insulation (5.5.3.5 and A.6) |
84 | Opaque Doors (5.5.3.6 and A.7) |
85 | Required Procedures for Determining Alternate Assembly U-factors, C-factors, F-factors, and Heat Capacities (Section A9) |
87 | Testing Series Calculation Method Parallel Path Calculation Method |
88 | Isothermal Planes Calculation Method |
89 | Modified Zone Calculation Method Section A9.4.6 Calculation Method Two- or Three-Dimensional Finite Difference and Finite Volume Computer Models Fenestration (5.5.4) |
90 | Vertical Fenestration Classes of Construction Skylights Fenestration Area (5.5.4.2) Vertical Fenestration Area (5.5.4.2.1) |
91 | Skylight Area (5.5.4.2.2) Skylight Minimum Area (5.5.4.2.3) |
97 | Fenestration U-factor (5.5.4.3) Vertical Fenestration U-Factor |
98 | Skylight U-Factor Fenestration Solar Heat Gain Coefficient (5.5.4.4) SHGC of Vertical Fenestration (5.5.4.4.1) |
101 | Opaque Permanent Projections (Exception 1 to 5.5.4.4.1) |
104 | Partially Opaque Permanent Projections (Exception 2 to 5.5.4.4.1) |
106 | Vertical Fenestration on the Street Side of the Street-Level Story in Nonresidential Spaces (Exception 3 to 5.5.4.4.1) |
107 | Dynamic Glazing (5.5.4.4.1, Exception 4) SHGC of North-Oriented Vertical Fenestration (5.5.4.4.1, exception 5) |
108 | SHGC of Skylights (5.5.4.4.2) Fenestration Orientation (5.5.4.5) |
109 | Visible Transmittance/SHGC Ratio (5.5.4.6) |
112 | Building Envelope Trade-Off Option (5.6) |
113 | Simulation Method Daylighting Potential Limits of the Building Envelope Trade-off Compliance Path |
114 | Submittals (5.7) Permit Application Documentation (5.7.2) |
115 | Completion Requirements (5.7.3) Product Information and Installation Requirements (5.8) Insulation (5.8.1) Labeling (5.8.1.1) Manufacturers’ Installation Requirements (5.8.1.2) |
116 | Loose-Fill Insulation (5.8.1.3) Baffles (5.8.1.4) |
117 | Substantial Contact (5.8.1.5) Recessed Equipment (5.8.1.6) Insulation Protection (5.8.1.7) |
118 | Insulation above Suspended Ceilings (5.8.1.8) Extent of Insulation (5.8.1.9) Staggering Joints for Rigid Insulation (5.8.1.10) Insulation Installation Documentation (5.8.1.11) Fenestration and Doors (5.8.2) Rating and Labeling (5.8.2.1 and 5.8.2.2) |
119 | U-Factor (5.8.2.3) |
120 | Solar Heat Gain Coefficient (5.8.2.4) Visible Transmittance (5.8.2.5) |
121 | Air Leakage (5.8.3) Testing, Acceptable Materials, and Assemblies (5.8.3.1) |
122 | Fenestration and Doors (5.8.3.2) Verification, Testing, Commissioning and Inspection (5.9) Verification and Testing (5.9.1) Commissioning (5.9.2) |
123 | Inspections (5.9.3) |
124 | 6. HVAC Systems General Information (6.1) Scope (6.1.1) |
125 | Compliance Paths (6.2) Compliance Forms Simplified Approach Building Compliance Path (Section 6.3) Prescriptive Compliance Path (Section 6.5) Alternative Compliance Path (Section 6.6) |
126 | Energy Cost Budget Method (Section 11) Performance Rating Method (Appendix G) Simplified Approach Building Compliance Path (6.3) Scope (6.3.1) Criteria (6.3.2) Single Zone (6.3.2(a)) |
127 | Variable Fan Airflow (6.3.2(b)) Cooling Efficiency (6.3.2(c)) Economizers (6.3.2(d)) Heating (6.3.2(e)) Exhaust Air Energy Recovery (6.3.2(f)) |
128 | Thermostat (6.3.2(g)) Heat Pump Auxiliary Heat Control (6.3.2(h)) Reheat for Humidity Control (6.3.2(i)) Off-Hour Shutoff and Setback (6.3.2(j)) Hotel/Motel Guest Rooms (6.3.2(k)) Piping Insulation (6.3.2(l)) |
129 | Ductwork Insulation (6.3.2(m)) Air Balancing (6.3.2(n)) Outdoor Air Intake and Exhaust Systems (6.3.2(o)) Simultaneous Heating and Cooling (6.3.2(p)) Optimum Start (6.3.2(q)) Ventilation Requirements (6.3.2(r)) |
130 | Door Switches (6.3.2(s)) |
133 | Mandatory Provisions (6.4) Mechanical Equipment Efficiency (6.4.1) Minimum Equipment Efficiencies—Standard Rating and Operating Conditions (6.4.1.1) |
134 | Additional Requirements for Furnaces (footnote f to Table 6.8.1-5) Minimum Equipment Efficiencies—Nonstandard Conditions (6.4.1.2) Requirements for Water-Cooled Centrifugal Chilling Packages (6.4.1.2.1) |
135 | Requirements for Positive Displacement Chilling Packages (6.4.1.2.2) |
136 | Multiple Chillers |
137 | Ceiling Fans (6.4.1.3) Equipment Not Listed (6.4.1.4) Verification of Equipment Efficiencies (6.4.1.5) |
138 | Notes Applying to the Equipment Efficiencies Given in Tables 6.8.1-1 through 6.8.1-20 |
142 | Calculations (6.4.2) Load Calculations (6.4.2.1) |
143 | Pump Head Calculations (6.4.2.2) Controls and Diagnostics (6.4.3) Zone Thermostatic Controls (6.4.3.1) Independent Perimeter Systems (Exceptions to 6.4.3.1.1) |
145 | Deadband Controls (6.4.3.1.2) |
146 | Exceptions to 6.4.3.1.2 |
148 | Setpoint Overlap Restriction (6.4.3.2) |
149 | Off-Hour Controls (6.4.3.3) Exceptions to 6.4.3.3 Automatic Shutdown (6.4.3.3.1) |
150 | Setback Controls (6.4.3.3.2) Heating Setback Controls Exception |
151 | Optimum Start Controls (6.4.3.3.3) Zone Isolation (6.4.3.3.4) |
155 | Exceptions to 6.4.3.3.4 Automatic Control of HVAC in Hotel/Motel Guest Rooms (6.4.3.3.5) |
156 | Ventilation System Controls (6.4.3.4) Stair and Shaft Vents (6.4.3.4.1) Shutoff Damper Controls (6.4.3.4.2) |
157 | Damper Leakage (6.4.3.4.3) |
158 | Ventilation Fan Controls (6.4.3.4.4) Enclosed Parking Garage Ventilation (6.4.3.4.5) Heat Pump Auxiliary Heat (6.4.3.5) |
160 | Humidification and Dehumidification Control (6.4.3.6) |
161 | Freeze Protection and Snow/Ice-Melting Systems (6.4.3.7) |
162 | Ventilation Controls for High-Occupancy Areas (6.4.3.8) |
163 | Heated or Cooled Vestibules (6.4.3.9) Direct Digital Control Requirements (6.4.3.10) |
164 | Chilled-Water Plant Monitoring (6.4.3.11) |
165 | Economizer Fault Detection and Diagnostics (6.4.3.12) HVACR System Construction and Insulation (6.4.4) Insulation (6.4.4.1) Installation of Piping and Ductwork Insulation (6.4.4.1.1) Duct and Plenum Insulation (6.4.4.1.2) |
166 | Exceptions to 6.4.4.1.2 |
170 | Piping Insulation (6.4.4.1.3) Exceptions to 6.4.4.1.3 Sensible Heat Panel Insulation (6.4.4.1.4) Radiant Floor Heating Insulation (6.4.4.1.5) |
172 | Ductwork and Plenum Leakage (6.4.4.2) Duct Sealing (6.4.4.2.1) |
173 | Duct Leakage Tests (6.4.4.2.2) |
174 | Walk-in Coolers and Freezers (6.4.5) |
175 | Refrigerated Display Case (6.4.6) |
176 | Liquid-to-Liquid Heat Exchangers (6.4.7) Prescriptive Compliance Path (6.5) Economizers (6.5.1) Exceptions to the Economizer Requirement |
180 | Air Economizers (6.5.1.1) |
181 | Design Capacity (6.5.1.1.1). Economizer Control Signal (6.5.1.1.2) |
183 | High-Limit Shutoff (6.5.1.1.3) |
184 | Damper Leakage (6.5.1.1.4) Economizer Relief (6.5.1.1.5) |
185 | Air-Side Sensor Accuracy (6.5.1.1.6) Fluid Economizers (6.5.1.2) Design Capacity (6.5.1.2.1) |
186 | Maximum Pressure Drop (6.5.1.2.2) Economizer Integration (6.5.1.3) |
190 | Economizer Heating System Impact (6.5.1.4) |
191 | Economizer Humidification System Impact (6.5.1.5) Simultaneous Heating and Cooling Limitation (6.5.2) Zone Controls for Simultaneous Heating and Cooling (6.5.2.1) |
192 | Variable-Air-Volume Systems (Exceptions 1 and 2 to 6.5.2.1) |
196 | Example VAV Reheat Control Sequences |
200 | Laboratory Exhaust Systems (Exception 3 to 6.5.2.1) Simultaneous Heating and Cooling in Hydronic Systems (6.5.2.2) Three-Pipe System (6.5.2.2.1) Two-Pipe Changeover System (6.5.2.2.2) |
201 | Hydronic (Water Loop) Heat Pump Systems (6.5.2.2.3) |
202 | Simultaneous Heating and Cooling in Dehumidification Systems (6.5.2.3) Exceptions to 6.5.2.3 |
203 | Humidification Systems (6.5.2.4) Preheating Jackets (6.5.2.4.1) Insulated Dispersion Tubes (6.5.2.4.2) |
204 | Preheat Coils (6.5.2.5) Ventilation Air Heating Control (6.5.2.6) Air System Design and Control (6.5.3) |
212 | Fan Power and Efficiency (6.5.3.1) Option 1 Option 2 |
214 | Exceptions to 6.5.3.1.1 |
215 | Pressure Drop Adjustment Devices |
217 | Fan Motor Selection (6.5.3.1.2) Fan Efficiency (6.5.3.1.3) |
218 | Exceptions to 6.5.3.1.3 |
219 | Additional Fan Energy Index Resources |
220 | Fan Control (6.5.3.2) Supply Fan Airflow Control (6.5.3.2.1) |
222 | VAV Static Pressure Sensor Location (6.5.3.2.2) VAV Static Pressure Setpoint Reset (6.5.3.2.3) |
223 | Return and Relief Fan Control (6.5.3.2.4) |
224 | Multiple-Zone VAV System Ventilation Optimization Control (6.5.3.3) Parallel-Flow Fan-Powered VAV Air Terminal Control (6.5.3.4) Supply Air Temperature Reset Controls (6.5.3.5) |
225 | Dehumidification Control Interaction (6.5.3.5.1) |
226 | Fractional Horsepower (Kilowatt) Fan Motors (6.5.3.6) Ventilation Design (6.5.3.7) Occupied Standby Controls (6.5.3.8) |
227 | Hydronic System Design and Control (6.5.4) Boiler Turndown (6.5.4.1) |
228 | Hydronic Variable-Flow Systems (6.5.4.2) |
231 | Chiller and Boiler Isolation (6.5.4.3) |
232 | Chilled- and Hot-Water Temperature Reset Controls (6.5.4.4) |
234 | Hydronic (Water-Loop) Heat Pumps and Water-Cooled Unitary Air-Conditioning Systems (6.5.4.5) Variable Flow (6.5.4.5.1) Pump Controls (6.5.4.5.2) Pipe Sizing (6.5.4.6) Exceptions to 6.5.4.6 |
236 | Chilled-Water Coil Selection (6.5.4.7) Heat Rejection Equipment (6.5.5) General (6.5.5.1) Fan Speed Control (6.5.5.2) General Speed Control Requirements (6.5.5.2.1) Fan Speed Control Requirements for Multiple-Cell Heat Rejection Equipment (6.5.5.2.2) |
237 | Limits on Centrifugal Fan Open-Circuit Cooling Towers (6.5.5.3) Open-Circuit Cooling Tower Flow Turndown (6.5.5.4) |
238 | Energy Recovery (6.5.6) Exhaust Air Energy Recovery (6.5.6.1) |
239 | Exceptions to 6.5.6.1.2 |
240 | Heat Recovery for Service Water Heating (6.5.6.2) |
243 | Heat Recovery for Space Conditioning (6.5.6.3) |
244 | Exhaust Hoods (6.5.7) Transfer Air (6.5.7.1) Kitchen Hoods (6.5.7.2) Limitation on Makeup Air in Hoods (6.5.7.2.1) |
245 | Limitation on Hood Exhaust (6.5.7.2.2) Demand Ventilation Systems (6.5.7.2.3) Laboratory Exhaust Systems (6.5.7.3) |
247 | Radiant Heating Systems (6.5.8) Heating Unenclosed Spaces (6.5.8.1) Heating Enclosed Spaces (6.5.8.2) |
248 | Hot-Gas Bypass Limitation (6.5.9) Door Switches (6.5.10) Refrigeration Systems (6.5.11) Condensers (6.5.11.1) |
249 | Compressor Systems (6.5.11.2) Alternative Compliance Path (6.6) Computer Room Systems (6.6.1) |
250 | Submittals (6.7) Completion Requirements (6.7.3) Record Documents (6.7.3.1) O&M Manuals (6.7.3.2) |
252 | System Balancing (6.7.3.3) General (6.7.3.3.1) Air System Balancing (6.7.3.3.2) |
253 | Hydronic System Balancing (6.7.3.3.3) |
254 | Minimum Equipment Efficiency Tables (6.8) |
255 | Table 6.8.1-1—Electrically Operated Unitary Air Conditioners and Condensing Units Table 6.8.1-2—Electrically Operated Unitary and Applied Heat Pumps |
256 | Table 6.8.1-3—Water-Chilling Packages Table 6.8.1-4—Electrically Operated Packaged Terminal Air Conditioners, Packaged Terminal Heat Pumps, Single-Package Vertical Air Conditioners, Single-Package Vertical Heat Pumps, Room Air Conditioners, and Room Air-Conditioner Heat Pumps |
257 | Table 6.8.1-5—Warm-Air Furnaces and Combination Warm-Air Furnaces/Air-Conditioning Units, Warm-Air Duct Furnaces, and Unit Heaters Table 6.8.1-6—Gas- and Oil-Fired Boilers—Minimum Efficiency Requirements Table 6.8.1-7—Performance Requirements for Heat Rejection Equipment |
258 | Table 6.8.1-8—Electrically Operated Variable-Refrigerant-Flow Air Conditioners Table 6.8.1-9—Electrically Operated Variable-Refrigerant-Flow Air-to-Air and Applied Heat Pumps Table 6.8.1-10—Air Conditioners and Condensing Units Serving Computer Rooms Table 6.8.1-11—Commercial Refrigerators, Commercial Freezers, and Refrigeration |
259 | Table 6.8.1-12—Vapor Compression Based Indoor Pool Dehumidifiers Table 6.8.1-13— Electrically Operated DX-DOAS Units, Single-Package and Remote Condenser, without Energy Recovery Table 6.8.1-14— Electrically Operated DX-DOAS Units, Single-Package and Remote Condenser, with Energy Recovery Table 6.8.1-15— Electrically Operated Water-Source Heat Pumps Table 6.8.1-16— Heat-Pump and Heat Recovery Chiller Packages Table 6.8.1-17— Ceiling-Mounted Computer-Room Air Conditioners |
260 | Table 6.8.1-18— Walk-In Cooler and Freezer Display Door Table 6.8.1-19— Walk-In Cooler and Freezer Nondisplay Door Table 6.8.1-20— Walk-In Cooler and Freezer Refrigeration System Verification, Testing, and Commissioning (6.9) |
261 | 7. Service Water Heating General Information (7.1) Scope (7.1.1) Compliance Paths (7.2) |
262 | Compliance Forms Mandatory Provisions (7.4) System Sizing/Load Calculations (7.4.1) Equipment Efficiency (7.4.2) |
267 | Piping Insulation (7.4.3) |
269 | Controls (7.4.4) Temperature Controls (7.4.4.1) |
270 | Temperature Maintenance Controls (7.4.4.2) Outlet Temperature Controls (7.4.4.3) Circulating Pump Controls (7.4.4.4) |
271 | Swimming Pools (7.4.5) Pool Heaters (7.4.5.1) Pool Covers (7.4.5.2) |
272 | Time Switches (7.4.5.3) Heat Traps (7.4.6) |
274 | Prescriptive Compliance Path (7.5) Combination Space and Water Heating Systems (7.5.1) |
275 | Service Water Heating Equipment (7.5.2) |
276 | Buildings with High-Capacity Service Water Heating Systems (7.5.3) Site Solar or Site-Recovered Energy (Exception 1 to 7.5.3) |
277 | Dwelling Unit Service Water Heating (Exception 2 to 7.5.3) Individual Water Heater Input Capacity (Exception 3 to 7.5.3) |
279 | Submittals (7.7) |
280 | Product Information (7.8) Verification, Testing, and Commissioning (7.9) |
281 | 8. Power General Information (8.1) Scope (8.1.1) Compliance Paths (8.2) Mandatory Provisions (8.4) |
282 | Voltage Drop (8.4.1) |
284 | Automatic Receptacle Control (8.4.2) |
285 | Electrical Energy Monitoring (8.4.3) |
287 | Monitoring (8.4.3.1) Recording and Reporting (8.4.3.2) Example 8-G. Recording and Reporting |
288 | Low-Voltage Dry-Type Distribution Transformers (8.4.4) Example 8-H. Transformers within Welding Equipment Alternative Compliance Path (8.6) Submittals (8.7) |
289 | Record Documents (8.7.3.1) Manuals (8.7.3.2) Verification, Testing, and Commissioning (8.9) |
290 | 9. Lighting General Information (9.1) Scope (9.1.1) |
291 | Lighting Alterations (9.1.2) Installed Lighting Power (9.1.3) |
292 | Interior and Exterior Luminaire Wattage (9.1.4) Lighting Equipment Directly Connected to Line Voltage Lighting Equipment with Remote Ballasts/Drivers |
293 | Line-Voltage Track Lighting Low-Voltage Track Lighting Low-Voltage Direct Current (DC) Lighting with Remote Power Supply Other Compliance Paths (9.2) |
294 | Compliance Forms Prescriptive Requirements (9.2.3) Interior Lighting Power (9.2.3.1) Exceptions to 9.2.3.1 |
295 | Applying the Standard |
297 | Simplified Building Method Compliance Path (9.3) Simplified Building Method of Calculating Interior Lighting Power Allowance (9.3.1) |
299 | Simplified Building Method of Calculating Exterior Lighting Power Allowance (9.3.2) Mandatory Provisions (9.4) Lighting Control (9.4.1) Interior Lighting Controls. (9.4.1.1) |
316 | Parking Garage Lighting Controls (9.4.1.2) |
317 | Special Applications (9.4.1.3) |
318 | Exterior Lighting Control (9.4.1.4) Exterior Building Lighting Power (9.4.2) |
319 | Exterior Lighting Zones (Table 9.4.2-1) Determining Exterior Building Lighting Power Compliance |
324 | Dwelling Units (9.4.3) Building Area Method (9.5) |
325 | Determining Interior Lighting Power Allowance Compliance |
326 | Space-by-Space Method (9.6) |
329 | Additional Interior Lighting Power (9.6.2) Decorative Lighting (9.6.2(a)) |
331 | Retail Display Lighting (9.6.2(b)) |
335 | Additional Interior LPD Using Nonmandatory Controls (9.6.3) |
336 | Room Geometry Adjustment (9.6.4) Additional Examples |
341 | Submittals (9.7) General (9.7.1) Permit Application Documentation (Not Used) (9.7.2) Completion Requirements (9.7.3) |
342 | Product Information (9.8) Verification, Testing, and Commissioning (9.9) |
343 | Commissioning (9.9.2) |
344 | 10. Other Equipment General Information (10.1) Scope (10.1.1) Mandatory Provisions (10.4) Electric Motors (10.4.1) |
345 | Exceptions to 10.4.1 |
346 | Service Water Pressure Booster Systems (10.4.2) Elevators (10.4.3) Lighting in Elevators (10.4.3.1) |
347 | Ventilation Power (10.4.3.2) Controls for Standby Mode (10.4.3.3) Design Documents (10.4.3.4) Escalators and Moving Walks (10.4.4) Air Curtains (10.4.5) Whole Building Energy Monitoring (10.4.6) |
348 | Recording and Reporting (10.4.6.2) Pumps (10.4.7) Submittals (10.7) |
349 | 11. Energy Cost Budget Method General Information (11.1) |
350 | Scope and Limitations (11.1.1, 11.1.2, and 11.1.3) Special Cases for Partial Building Permit Special Case for Additions |
351 | Special Case for Alterations |
353 | Compliance (11.2) Intent and Limitations of the ECB Method |
354 | Simulation General Requirements (11.4) Simulation Program’s Minimum Modeling Capabilities (11.4.1) |
355 | Testing of Simulation Program (11.4.1.4) |
356 | Climatic Data (11.4.2) Renewable, Recovered, and Purchased Energy (11.4.3) On-Site Renewable Energy and Site-Recovered Energy (11.4.3.1) |
357 | Annual Energy Costs (11.4.3.2) |
358 | Compliance Calculations (11.4.4) Exceptional Calculation Methods (11.4.5) Calculating Design Energy Cost and the ECB (11.5) |
359 | Design Model (Table 11.5.1, No. 1) |
360 | Alterations and Additions (Table 11.5.1, No. 2) Space Use Classifications (Table 11.5.1, No. 3) |
361 | Schedules (Table 11.5.1, No. 4) |
362 | Building Envelope (Table 11.5.1, No. 5) Proposed Building Envelope Budget Building Envelope |
363 | Opaque Assemblies Roof Albedo Fenestration |
365 | Lighting Systems (Table 11.5.1, No. 6) Proposed Building Lighting Systems Existing Lighting Designed Lighting No Specified Lighting Lighting in Dwelling units Permanent and Portable Lighting Mandatory Lighting Controls |
366 | Additional Lighting Controls |
367 | Budget Building Lighting Systems Thermal Blocks—HVAC Zones Designed (Table 11.5.1, No. 7) |
369 | Thermal Blocks—HVAC Zones Not Designed (Table 11.5.1, No. 8) |
370 | Thermal Blocks—Multifamily Residential Buildings (Table 11.5.1, No. 9) HVAC Systems (Table 11.5.1, No. 10, and Section 11.5.2) Proposed Building HVAC Systems |
371 | Budget Building HVAC Systems |
372 | HVAC Systems Mapping (11.5.2) Mixed-Fuel Heating Systems |
374 | Limited Trade-Offs (11.5.2(a)) Minimum Efficiencies (11.5.2(b)) |
375 | Fan Energy (11.5.2(c)) |
378 | Outdoor Air Ventilation (11.5.2(d)) |
379 | Economizers (11.5.2(e)) Preheat Coils (11.5.2(f)) Design Supply Air Rates (11.5.2(g)) Fan System Efficiency (11.5.2(h)) |
380 | Equipment Sizing (11.5.2(i) and 11.5.2(j)) Kitchen Exhaust (11.5.2(k)) |
381 | Service Hot-Water Systems (Table 11.5.1, No. 11) Proposed Building Service Hot Water Systems Budget Building Service Hot Water Systems Miscellaneous Loads (Table 11.5.1, No. 12) Proposed Building Miscellaneous Loads Budget Building Miscellaneous Loads Refrigeration (Table 11.5.1, No. 13) Proposed Building Refrigeration |
382 | Budget Building Refrigeration Modeling Exceptions (Table 11.5.1, No. 14) |
383 | Application Examples |
389 | Documentation Requirements (11.7) Summary (11.7(a)) Energy-Related Features (11.7(b)) Input/Output Reports (11.7(c)) |
390 | Error Messages (11.7(d)) On-Site Renewable Energy (11.7(e)) Completion Requirements (11.7.3) Considerations for the Adopting Authority Notes for Adopting Authorities (11.4.1 Note) ECB Method Pros and Cons User Sophistication |
391 | Enforcement Sophistication Better Buildings Aging of the Standard Gamesmanship Cheating Innovation |
392 | Adoption Considerations Approve Simulation Programs Adopt a Compliance Supplement Adopt a Compliance Shell Approve Standard Compliance Forms Approve Climate Data |
393 | Approve Purchased Energy Rates |
394 | G. Performance Rating Method Scope (G1.1) |
395 | Performance Rating (G1.2) Complying with Mandatory Provisions Determining Compliance – No Renewable Energy Systems |
396 | Determining Compliance – With Renewable Energy Systems |
398 | Determining Percentage Improvement Simulation Rules |
399 | Including All Energy Components Understanding the Method’s Intent and Limitations |
400 | Documentation Requirements (G1.3) Simulation General Requirements (G2) Performance Calculations (G2.1) Simulation Program (G2.2) Minimum Modeling Capabilities (G2.2.1) |
401 | Proposed Building and Baseline Building Performance (G2.2.2) Design Load Calculations (G2.2.3) Testing (G2.2.4) |
402 | Climatic Data (G2.3) Renewable, Recovered, and Purchased Energy (G2.4) |
403 | Exceptional Calculation Methods (G2.5) Proposed and Baseline Performance (G3) Building Performance Calculations (G3.1) |
404 | Design Model (Table G3.1, No. 1) Additions and Alterations (Table G3.1, No. 2) |
405 | Space Use Classifications (Table G3.1, No. 3) Schedules (Table G3.1, No.4) |
406 | Exceptions to Table G3.1, No.4 |
408 | Building Envelope (Table G3.1, No.5) Proposed Building Envelope |
409 | Uninsulated Assemblies Minor Insulated Assemblies |
411 | Different Tilt or Azimuth Reflective Roofs Fenestration Shading Devices Dynamic Glazing |
412 | Infiltration Baseline Building Envelope Orientation |
413 | Opaque Assemblies Vertical Fenestration Areas |
414 | Vertical Fenestration Assemblies |
416 | Skylights Solar Reflectance and Thermal Emittance Lighting (Table G3.1, No. 6) Proposed Building Lighting System |
418 | Baseline Building Lighting System Baseline Building Exterior Lighting |
419 | Thermal Blocks—General Information Thermal Blocks—HVAC Zones Designed (Table G3.1, No. 7) |
420 | Thermal Blocks—HVAC Zones Not Designed (Table G3.1, No. 8) Thermal Blocks in Multifamily Residential Buildings (Table G3.1, No. 9) |
421 | HVAC Systems (Table G3.1, No. 10) Proposed Building HVAC Systems Equipment Efficiencies |
423 | Existing Systems Complete HVAC System Design Incomplete HVAC System Design, Heating-Only or Cooling-Only |
425 | Baseline Building HVAC Systems Baseline HVAC System Type and Description (G3.1.1) |
428 | Purchased Heat (G3.1.1.1) Purchased Chilled Water (G3.1.1.2) Baseline HVAC System Requirements for Systems Utilizing Purchased Chilled Water and/or Purchased Heat (G3.1.1.3) |
430 | On-Site Distribution Pumps (G3.1.1.3.4) Infiltration Methodology (G3.1.1.4) |
431 | General Baseline HVAC System Requirements (G3.1.2) Equipment Efficiencies (G3.1.2.1) |
432 | Equipment Capacities (G3.1.2.2) Unmet load hours (G3.1.2.3) |
433 | Fan System Operation (G3.1.2.4) Ventilation (G3.1.2.5) Economizers (G3.1.2.6) |
434 | Economizer High-Limit Shutoff (G3.1.2.7) |
435 | Design Airflow Rates (G3.1.2.8) All Baseline System Types Except 9 and 10 Baseline System Types 9 and 10 |
436 | System Fan Power (G3.1.2.9) |
438 | Exhaust Air Energy Recovery (G3.1.2.10) System-Specific Baseline HVAC System Requirements (G3.1.3) Heat Pumps—Systems 2 and 4 (G3.1.3.1) Type and Number of Boilers—Systems 1, 5, 7, and 12 (G3.1.3.2) Hot-Water Supply Temperature—Systems 1, 5, 7, and 12 (G3.1.3.3) Hot-Water Supply Temperature Reset—Systems 1, 5, 7, and 12 (G3.1.3.4) |
439 | Hot-Water Pumps—Systems 1, 5, 7, and 12 (G3.1.3.5) Piping Losses—Systems 1, 5, 7, 8, 11, 12, and 13 (G3.1.3.6) |
440 | Type and Number of Chillers—Systems 7, 8, 11, 12, and 13 (G3.1.3.7) Chilled Water Design Supply Temperature—Systems 7, 8, 11, 12, and 13 (G3.1.3.8) Chilled-Water Supply Temperature Reset—Systems 7, 8, 11, 12, and 13 (G3.1.3.9) Chilled Water Pumps—Systems 7, 8, 11, 12, and 13 (G3.1.3.10) |
441 | Heat Rejection—Systems 7, 8, 11, 12, and 13 (G3.1.3.11) Supply Air Temperature Reset—Systems 5 through 8 (G3.1.3.12) VAV Minimum Flow Setpoints—Systems 5 and 7 (G3.1.3.13) |
442 | Fan-Powered Boxes—Systems 6 and 8 (G3.1.3.14) VAV Fan Part-Load Performance—Systems 5 through 8 and 11 (G3.1.3.15) Computer-Room Equipment Schedules (G3.1.3.16) |
443 | System 11 Supply Air Temperature and Fan Control (G3.1.3.17) Systems 3 through 8 Dehumidification (G3.1.3.18) Systems 5 through 8 Preheat Coils (G3.1.3.19) Service Hot-Water Systems (Table G3.1, No. 11) |
444 | Proposed Building Service Hot-Water Systems Baseline Building Service Hot-Water Systems |
446 | Receptacle and Other Loads (Table G3.1, No. 12) Receptacle and Process Loads |
447 | Modeling Limitations to the Simulation Program (Table G3.1, No. 13) |
448 | Exterior Conditions (Table G3.1, No. 14) Distribution Transformers (Table G3.1, No. 15) Elevators (Table G3.1, No. 16) |
449 | Refrigeration (Table G3.1, No. 17) Example Operating and Occupancy Schedules |