ASME A112.6.3 01 R07:2001 Edition
$75.42
ASME A112.6.3 Floor And Trench Drains
Published By | Publication Date | Number of Pages |
ASME | 2001 | 18 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | FOREWORD FOREWORD |
5 | COMMITTEE ROSTER COMMITTEE ROSTER |
7 | CONTENTS CONTENTS FIGURES FIGURES TABLES TABLES |
10 | 1 GENERAL 1 GENERAL 1.1 Scope 1.1 Scope 1.2 Units of Measurement 1.2 Units of Measurement 1.3 Illustrations 1.3 Illustrations 1.4 Reference Standards 1.4 Reference Standards 1.5 Definitions 1.5 Definitions |
11 | 1 AREA DRAIN NOMENCLATURE NOMENCLATURE 1 AREA DRAIN NOMENCLATURE NOMENCLATURE 2 FLOOR DRAIN NOMENCLATURE 2 FLOOR DRAIN NOMENCLATURE 3 DRAIN FOR BUILT-UP SHOWER — NOMENCLATURE 3 DRAIN FOR BUILT-UP SHOWER — NOMENCLATURE 4 DRAIN FOR PREFABRICATED SHOWER — NOMENCLATURE 4 DRAIN FOR PREFABRICATED SHOWER — NOMENCLATURE 5 TRENCH DRAIN NOMENCLATURE 5 TRENCH DRAIN NOMENCLATURE |
12 | 2 GENERAL REQUIREMENTS 2 GENERAL REQUIREMENTS 2.1 Drain Bodies 2.1 Drain Bodies 2.2 Shower Drains 2.2 Shower Drains 2.3 Bolts and Fasteners 2.3 Bolts and Fasteners 3 OUTLETS — TYPES AND CONNECTIONS 3 OUTLETS — TYPES AND CONNECTIONS 3.1 Outlet Types 3.1 Outlet Types 3.2 Outlet Connections 3.2 Outlet Connections 6 BOTTOM OUTLET 6 BOTTOM OUTLET 7 SIDE OUTLET 7 SIDE OUTLET |
13 | 3.3 Tolerances 3.3 Tolerances 4 TOP DIMENSIONS — GRATE-FREE AREA 4 TOP DIMENSIONS — GRATE-FREE AREA 4.1 Geometry for the Drain Top 4.1 Geometry for the Drain Top 8 SIDE OUTLET INTEGRAL TRAP 8 SIDE OUTLET INTEGRAL TRAP 1 MINIMUM DIMENSIONS FOR THREADED OUTLET CONNECTIONS 1 MINIMUM DIMENSIONS FOR THREADED OUTLET CONNECTIONS 2 MINIMUM DIMENSIONS FOR INSIDE CAULK (GASKET) OUTLET CONNECTIONS 2 MINIMUM DIMENSIONS FOR INSIDE CAULK (GASKET) OUTLET CONNECTIONS 3 MINIMUM DIMENSIONS FOR HUBBED (PUSH-ON) OUTLET CONNECTIONS 3 MINIMUM DIMENSIONS FOR HUBBED (PUSH-ON) OUTLET CONNECTIONS |
14 | 4.2 Open Area Requirements for Various Classifications of Drains 4.2 Open Area Requirements for Various Classifications of Drains 4.3 Openings in Top Grates 4.3 Openings in Top Grates 5 TOP LOADING — CLASSIFICATION 5 TOP LOADING — CLASSIFICATION 5.1 Loading Classifications 5.1 Loading Classifications 5.2 Test Procedure for Grate Loading 5.2 Test Procedure for Grate Loading 6 MATERIALS AND FINISHES 6 MATERIALS AND FINISHES 6.1 Materials 6.1 Materials 4 OPEN AREA REQUIREMENTS FOR DRAINS 4 OPEN AREA REQUIREMENTS FOR DRAINS |
15 | 6.2 Finishes 6.2 Finishes 7 VARIATIONS 7 VARIATIONS 7.1 Extension 7.1 Extension 7.2 Anchor Flange 7.2 Anchor Flange 7.3 Auxiliary Inlet 7.3 Auxiliary Inlet 7.4 Backwater Valve 7.4 Backwater Valve 7.5 Clamping Device 7.5 Clamping Device 7.6 Dome Grate 7.6 Dome Grate |
16 | 7.7 Floor Cleanout 7.7 Floor Cleanout 7.8 Hinged Grate 7.8 Hinged Grate 7.9 Secondary Strainer 7.9 Secondary Strainer 7.10 Sediment Bucket 7.10 Sediment Bucket 7.11 Trap Primer Connection 7.11 Trap Primer Connection 7.12 Heel-Resistant Strainers and Grates 7.12 Heel-Resistant Strainers and Grates 8 TESTING 8 TESTING 9 MARKING 9 MARKING 9 OPTIONAL FEATURES AVAILABLE FOR USE WITH DRAINS 9 OPTIONAL FEATURES AVAILABLE FOR USE WITH DRAINS |