Shopping Cart

No products in the cart.

ASME B30.1 2020

$98.04

ASME B30.1-2020 Jacks, Industrial Rollers, Air Casters, and Hydraulic Gantries

Published By Publication Date Number of Pages
ASME 2020
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

B30.1 includes provisions that apply to the construction, operation, inspection, testing, and maintenance of mechanical ratchet jacks, hand- or power-operated mechanical screw jacks, hand- or power-operated hydraulic jacks, air lifting bags, industrial rollers, air casters, telescopic hydraulic gantry systems, and strand jacks Not included in this Volume are jacks designed for automotive service, trip-lowered jacks, jacks designed for static support rather than load handling, and jacks, industrial rollers, air lifting bags or air casters that are an integral part of other equipment.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
7 FOREWORD
9 ASME B30 COMMITTEE ROSTER
11 B30 STANDARD INTRODUCTION
14 ASME B30.1-2020 SUMMARY OF CHANGES
16 Chapter 1-0 Scope, Translations, Definitions, Personnel Competence, Responsibilities, and References
SECTION 1-0.1: SCOPE OF B30.1
1-0.1.1 Illustrations
1-0.1.2 Translations
SECTION 1-0.2: DEFINITIONS
17 SECTION 1-0.3: PERSONNEL COMPETENCE
18 SECTION 1-0.4: RESPONSIBILITIES
1-0.4.1 Responsibilities of the LHE Owner and LHE User
1-0.4.2 Responsibilities of Site Supervisor and LHE Director
19 1-0.4.3 Responsibilities of LHE Operators
20 1-0.4.4 Responsibilities of Riggers
1-0.4.5 Standard Hand Signals
SECTION 1-0.5: REFERENCE
21 Figures
Figure 1-0.4.5-1 Standard Hand Signals When Using Jacks, Industrial Rollers, Air Casters, and Telescopic Hydraulic Gantry Systems
22 Chapter 1-1 Mechanical Jacks
SECTION 1-1.0: SCOPE
SECTION 1-1.1: TYPES AND DESIGN
1-1.1.1 Types
1-1.1.2 Design
SECTION 1-1.2: DESIGN FACTOR
SECTION 1-1.3: RATED LOADS
SECTION 1-1.4: PROOF TEST AND PROOF LOAD
1-1.4.1 Proof Test Requirements
1-1.4.2 Proof Load Requirements
SECTION 1-1.5: IDENTIFICATION
1-1.5.1 Marking
23 Figure 1-1.1.1-1 Ratchet Jack
Figure 1-1.1.1-2 Screw Jack
Figure 1-1.1.1-3 Power-Driven Screw Jack
Figure 1-1.1.1-4 Screw Jack With Ratchet
24 1-1.5.2 Maintenance of Identification
SECTION 1-1.6: EFFECTS OF ENVIRONMENT
1-1.6.1 Temperature
1-1.6.2 Chemically Active Environments
1-1.6.3 Other Environments
SECTION 1-1.7: INSTRUCTIONS AND TRAINING
1-1.7.1 Instructions
1-1.7.2 Training
SECTION 1-1.8: INSPECTION, REPAIR, AND REMOVAL
1-1.8.1 Initial Inspection
1-1.8.2 Frequent Inspection
1-1.8.3 Periodic Inspection
1-1.8.4 Removal Criteria
25 1-1.8.5 Repairs and Modifications
SECTION 1-1.9: OPERATING PRACTICES
1-1.9.1 Mechanical Jack Selection
1-1.9.2 Maintenance
1-1.9.3 Storage
1-1.9.4 Cautions to Personnel
1-1.9.5 Jacking Practices
28 Chapter 1-2 Hydraulic Jacks
SECTION 1-2.0: SCOPE
SECTION 1-2.1: TYPES AND DESIGN
1-2.1.1 Types
1-2.1.2 Design
SECTION 1-2.2: DESIGN FACTOR
SECTION 1-2.3: RATED LOADS
SECTION 1-2.4: PROOF TEST AND PROOF LOAD
1-2.4.1 Proof Test Requirements
1-2.4.2 Proof Load Requirements
29 Figure 1-2.1.1-1 Single-Acting Hydraulic Jack
Figure 1-2.1.1-2 Double-Acting Hydraulic Jack
Figure 1-2.1.1-3 Self-Contained Hydraulic Jack
30 SECTION 1-2.5: IDENTIFICATION
1-2.5.1 Marking
1-2.5.2 Maintenance of Identification
SECTION 1-2.6: EFFECTS OF ENVIRONMENT
1-2.6.1 Temperature
1-2.6.2 Chemically Active Environments
1-2.6.3 Other Environments
SECTION 1-2.7: INSTRUCTIONS AND TRAINING
1-2.7.1 Instructions
1-2.7.2 Training
SECTION 1-2.8: INSPECTION, REPAIR, AND REMOVAL
1-2.8.1 Initial Inspection
1-2.8.2 Frequent Inspection
1-2.8.3 Periodic Inspection
31 1-2.8.4 Removal Criteria
1-2.8.5 Repairs and Modifications
SECTION 1-2.9: OPERATING PRACTICES
1-2.9.1 Hydraulic Jack Selection
1-2.9.2 Maintenance
1-2.9.3 Storage
1-2.9.4 Cautions to Personnel
1-2.9.5 Jacking Practices
34 Chapter 1-3 Air-Lifting Bags
SECTION 1-3.0: SCOPE
SECTION 1-3.1: TYPES AND DESIGN
1-3.1.1 Types
1-3.1.2 Design
SECTION 1-3.2: DESIGN FACTOR
SECTION 1-3.3: RATED LOADS
SECTION 1-3.4: PROOF TEST
1-3.4.1 Proof Test Requirements
1-3.4.2 Proof Load Requirements
SECTION 1-3.5: IDENTIFICATION
1-3.5.1 Marking
1-3.5.2 Maintenance of Identification
35 SECTION 1-3.6: EFFECTS OF ENVIRONMENT
1-3.6.1 Temperature
1-3.6.2 Chemically Active Environments
1-3.6.3 Other Environments
SECTION 1-3.7: INSTRUCTIONS AND TRAINING
1-3.7.1 Instructions
1-3.7.2 Training
SECTION 1-3.8: INSPECTION, REPAIR, AND REMOVAL FROM SERVICE
1-3.8.1 Initial Inspection
1-3.8.2 Frequent Inspection
1-3.8.3 Periodic Inspection
Figure 1-3.1.1-1 Air-Lifting Bags
36 1-3.8.4 Removal Criteria
1-3.8.5 Repairs and Modifications
SECTION 1-3.9: OPERATING PRACTICES
1-3.9.1 Air-Lifting Bag Selection
1-3.9.2 Maintenance
1-3.9.3 Storage
1-3.9.4 Cautions to Personnel
37 1-3.9.5 Load Handling Practices
39 Chapter 1-4 Industrial Rollers
SECTION 1-4.0: SCOPE
SECTION 1-4.1: TYPES AND DESIGN
1-4.1.1 Types
1-4.1.2 Design
SECTION 1-4.2: DESIGN FACTOR
SECTION 1-4.3: RATED LOADS
SECTION 1-4.4: PROOF TEST AND PROOF LOAD
1-4.4.1 Proof Test Requirements
1-4.4.2 Proof Load Requirements
SECTION 1-4.5: IDENTIFICATION
1-4.5.1 Marking
SECTION 1-4.6: EFFECTS OF ENVIRONMENT
1-4.6.1 Temperature
1-4.6.2 Chemically Active Environments
40 Figure 1-4.1.1-1 Conventional Industrial Roller: Roller Type
Figure 1-4.1.1-2 Three-Point Rolling System: Wheel Type
41 1-4.6.3 Other Environments
SECTION 1-4.7: INSTRUCTIONS AND TRAINING
1-4.7.1 Instructions
1-4.7.2 Training
SECTION 1-4.8: INSPECTION, REPAIR, AND REMOVAL
1-4.8.1 Initial Inspection
1-4.8.2 Frequent Inspection
1-4.8.3 Periodic Inspection
1-4.8.4 Removal Criteria
42 1-4.8.5 Repairs and Modifications
SECTION 1-4.9: OPERATING PRACTICES
1-4.9.1 Industrial Roller Selection
1-4.9.2 Maintenance
1-4.9.3 Storage
1-4.9.4 Cautions to Personnel
1-4.9.5 Rolling Practices
44 Chapter 1-5 Air Casters
SECTION 1-5.0: SCOPE
SECTION 1-5.1: TYPES, MATERIALS, AND DESIGN
1-5.1.1 Types
1-5.1.2 Materials
1-5.1.3 Design
SECTION 1-5.2: DESIGN FACTOR
SECTION 1-5.3: RATED LOADS
SECTION 1-5.4: PROOF TEST
1-5.4.1 Proof Test Requirements
1-5.4.2 Proof Load Requirements
SECTION 1-5.5: IDENTIFICATION
1-5.5.1 Marking
1-5.5.2 Maintenance of Identification
SECTION 1-5.6: EFFECTS OF ENVIRONMENT
1-5.6.1 Temperature
45 Figure 1-5.1.1-1 Air Casters
Figure 1-5.1.1-2 Four-Unit Air Caster System
46 1-5.6.2 Chemically Active Environments
1-5.6.3 Other Environments
SECTION 1-5.7: INSTRUCTIONS AND TRAINING
1-5.7.1 Instructions
1-5.7.2 Training
SECTION 1-5.8: INSPECTION, REPAIR, AND REMOVAL
1-5.8.1 Initial Inspection
1-5.8.2 Frequent Inspection
1-5.8.3 Periodic Inspection
1-5.8.4 Removal Criteria
47 1-5.8.5 Repairs and Modifications
SECTION 1-5.9: OPERATING PRACTICES
1-5.9.1 Air Caster Selection
1-5.9.2 Maintenance
1-5.9.3 Storage
1-5.9.4 Cautions to Personnel
1-5.9.5 Load Handling Practices
49 Chapter 1-6 Telescopic Hydraulic Gantry Systems
SECTION 1-6.0: SCOPE
SECTION 1-6.1: TYPES AND DESIGN
1-6.1.1 Types
1-6.1.2 Design
SECTION 1-6.2: DESIGN FACTORS
SECTION 1-6.3: RATED LOADS
SECTION 1-6.4: PROOF TEST AND PROOF LOAD
1-6.4.1 Proof Test Requirements
1-6.4.2 Proof Load Requirements
50 Figure 1-6.1.1-1 Gantry Leg Types
Figure 1-6.1.1-2 Basic Gantry System
51 SECTION 1-6.5: IDENTIFICATION
1-6.5.1 Marking
1-6.5.2 Maintenance of Identification
SECTION 1-6.6: EFFECTS OF ENVIRONMENT
1-6.6.1 Temperature
1-6.6.2 Chemically Active Environments
1-6.6.3 Wind
1-6.6.4 Other Environments
SECTION 1-6.7: INSTRUCTIONS AND TRAINING
1-6.7.1 Instructions
1-6.7.2 Training
SECTION 1-6.8: INSPECTION, REPAIR, AND REMOVAL
52 1-6.8.1 Initial Inspection
1-6.8.2 Frequent Inspection
1-6.8.3 Periodic Inspection
1-6.8.4 Removal Criteria
1-6.8.5 Repairs and Modifications
1-6.8.6 Inspection of Load Rigging
SECTION 1-6.9: OPERATING PRACTICES
1-6.9.1 Telescopic Hydraulic Gantry System Selection
53 1-6.9.2 Maintenance
1-6.9.3 Storage
1-6.9.4 Cautions to Personnel
1-6.9.5 Load Handling Practices
55 Chapter 1-7 Strand Jack Systems
SECTION 1-7.0: SCOPE
SECTION 1-7.1: TYPES AND DESIGN
1-7.1.1 Types
1-7.1.2 Design
SECTION 1-7.2: DESIGN FACTORS
SECTION 1-7.3: RATED LOADS
SECTION 1-7.4: PROOF TEST AND PROOF LOAD
1-7.4.1 Proof Test Requirements
56 1-7.4.2 Proof Load Requirements
SECTION 1-7.5: IDENTIFICATION
1-7.5.1 Marking
1-7.5.2 Maintenance of Identification
Figure 1-7.1.1-1 Basic Stand Jack System
57 SECTION 1-7.6: EFFECTS OF ENVIRONMENT
1-7.6.1 Temperature
1-7.6.2 Chemically Active Environments
1-7.6.3 Other Environments
SECTION 1-7.7: INSTRUCTIONS AND TRAINING
1-7.7.1 Instructions
1-7.7.2 Training
SECTION 1-7.8: INSPECTION, REPAIR, AND REMOVAL
1-7.8.1 Initial Inspection
1-7.8.2 Frequent Inspection
1-7.8.3 Periodic Inspection
58 1-7.8.4 Removal Criteria
1-7.8.5 Repairs and Modifications
1-7.8.6 Inspection of Load Rigging
SECTION 1-7.9: OPERATING PRACTICES
1-7.9.1 Strand Jack System Selection
59 1-7.9.2 Maintenance
1-7.9.3 Storage
1-7.9.4 Cautions to Personnel
1-7.9.5 Load Handling Practices
ASME B30.1 2020
$98.04