ASME B30.12 2011 R2021
$98.04
ASME B30.12 – 2011(R2021) Handling Loads Suspended from Rotorcraft
Published By | Publication Date | Number of Pages |
ASME | 2011 | 36 |
Addresses the handling of loads suspended from rotorcraft using cargo sling or powered hoist, or other attaching means, to lift, carry , pull, tow a jettisonable load outside of the rotorcraft airframe.
PDF Catalog
PDF Pages | PDF Title |
---|---|
7 | FOREWORD |
8 | COMMITTEE ROSTER |
10 | B30 STANDARD INTRODUCTION |
13 | SUMMARY OF CHANGES |
15 | Chapter 12-0 Scope, Definitions, and References SECTION 12-0.1: SCOPE OF B30.12 SECTION 12-0.2: DEFINITIONS |
16 | Figures Fig. 12-0.2.2-1 Hook With Closed-Throat Load Beam |
17 | Fig. 12-0.2.2-2 Hook With Open-Throat Load Beam |
18 | SECTION 12-0.3: REFERENCES |
19 | Chapter 12-1 External Load Ratings and Characteristics SECTION 12-1.1: LOAD RATINGS SECTION 12-1.2: LOAD CHARACTERISTICS |
20 | Chapter 12-2 Lifting Components SECTION 12-2.1: PRIMARY CARGO HOOK(S) SECTION 12-2.2: HOIST/WINCH |
21 | SECTION 12-2.3: ROTORCRAFT SECTION 12-2.4: SLINGS SECTION 12-2.5: LONGLINES |
22 | Fig. 12-2.4.1-1 Vertical Hitch Fig. 12-2.4.1-2 Two-Leg Sling Fig. 12-2.4.1-3 Three-Leg Sling Fig. 12-2.4.1-4 Four-Leg Sling |
23 | Fig. 12-2.4.1-5 Two-Leg Spreader Sling Fig. 12-2.4.1-6 Four-Leg Spreader Sling Table Table 12-2.4.3-1 Determining Sling Strength |
24 | Chapter 12-3 Inspection and Maintenance SECTION 12-3.1: ROTORCRAFT INSPECTION AND MAINTENANCE SECTION 12-3.2: PRIMARY HOOK(S) ANDATTACHING MEANS INSPECTION AND MAINTENANCE SECTION 12-3.3: HOIST AND HOIST ROPE INSPECTION AND MAINTENANCE SECTION 12-3.4: SLING INSPECTION, REPLACEMENT, AND MAINTENANCE |
25 | Chapter 12-4 Operations SECTION 12-4.1: PILOTS AND CREW SECTION 12-4.2: PILOT QUALIFICATIONS SECTION 12-4.3: SIGNALPERSON QUALIFICATIONS AND RESPONSIBILITIES |
26 | Fig. 12-4.3.4-1 Helicopter Hand Signals |
27 | SECTION 12-4.4: OPERATING PRACTICES |
29 | Fig. 12-4.4.16-1 Personnel Approach/Departure Path (Level Ground) Fig. 12-4.4.16-2 Personnel Approach/Departure Path (Sloping Ground) Fig. 12-4.4.16-3 Personnel Approach/Departure With Tools |
31 | Chapter 12-5 Handling the Load SECTION 12-5.1: HOOKING AND UNHOOKING LOADS SECTION 12-5.2: TAGLINES SECTION 12-5.3: ATTACHMENT METHODS Fig. 12-5.1-1 Helicopter Station |
32 | Chapter 12-6 Signals and Communication SECTION 12-6.1: SIGNAL SYSTEMS SECTION 12-6.2: PERSONNEL SECTION 12-6.3: HUMAN EXTERNAL CARGO COMMUNICATIONS |
33 | Chapter 12-7 Fueling and Ground-Based Facilities at the Work Area SECTION 12-7.1: FUELING OPERATIONS SECTION 12-7.2: PERSONNEL TRAINING SECTION 12-7.3: GROUND-BASED FACILITIES ARRANGEMENT |