Shopping Cart

No products in the cart.

ASME B30.2 2022

$98.04

ASME B30.2 – 2022 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist

Published By Publication Date Number of Pages
ASME 2022 46
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

Volume B30.2 includes provisions that apply to the construction, installation, operation, inspection, and maintenance of hand-operated and power-driven overhead and gantry cranes that have a top-running single girder or multiple girder bridge, with one or more top-running trolley hoists used for vertical lifting and lowering of freely suspended, unguided loads consisting of equipment and materials.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
6 FOREWORD
7 ASME B30 COMMITTEE ROSTER
9 B30 STANDARD INTRODUCTION
12 ASME B30.2-2022 SUMMARY OF CHANGES
14 Chapter 2-0 Scope, Definitions, References, and Personnel Competence
SECTION 2-0.1: SCOPE OF B30.2
SECTION 2-0.2: DEFINITIONS
16 Figures
Figure 2-0.2-5 Wall Crane
Figure 2-0.2-1 Cantilever Gantry Crane
Figure 2-0.2-2 Gantry Crane
Figure 2-0.2-3 Overhead Crane
Figure 2-0.2-4 Semigantry Crane
18 SECTION 2-0.3: REFERENCES
19 SECTION 2-0.4: PERSONNEL COMPETENCE
20 Chapter 2-1 General Construction and Installation
SECTION 2-1.1: MARKINGS
2-1.1.1 Rated Load Markings ā€” Crane
2-1.1.2 Rated Load Markings ā€” Hoists
2-1.1.3 Manufacturerā€™s Identification Markings
2-1.1.4 Multiple Hoist Identification Markings
2-1.1.5 Warnings
2-1.1.6 Controls
21 SECTION 2-1.2: CLEARANCES
2-1.2.1 Clearance From Obstruction
2-1.2.2 Clearance Between Parallel Cranes
SECTION 2-1.3: GENERAL CONSTRUCTION ā€” RUNWAYS AND SUPPORTING STRUCTURE
2-1.3.1 Foundations and Anchorages
2-1.3.2 Crane Runways
SECTION 2-1.4: CRANE CONSTRUCTION
2-1.4.1 Welded Construction
2-1.4.2 Structural Components
22 2-1.4.3 Modifications
SECTION 2-1.5: CABS ā€” NORMAL OR SKELETON (IF PROVIDED)
2-1.5.1 Cab Location
2-1.5.2 Cab Construction
2-1.5.3 Access to Crane
2-1.5.4 Toolbox
2-1.5.5 Fire Extinguisher
2-1.5.6 Lighting
SECTION 2-1.6: LUBRICATION
SECTION 2-1.7: SERVICE PLATFORMS (FOOTWALKS)
2-1.7.1 Construction of Service Platforms
23 2-1.7.2 Ladders and Stairways
2-1.7.3 Egress
SECTION 2-1.8: STOPS AND BUMPERS
2-1.8.1 Trolley Stops
2-1.8.2 Bridge and Gantry Bumpers
2-1.8.3 Trolley Bumpers
24 SECTION 2-1.9: RAIL SWEEPS
2-1.9.1 Bridge Rail Sweeps
2-1.9.2 Trolley Rail Sweeps
2-1.9.3 Gantry Rail Sweeps
SECTION 2-1.10: GUARDS FOR MOVING PARTS
SECTION 2-1.11: TRUCK FRAME DROP
SECTION 2-1.12: BRAKES AND BRAKING MEANS
2-1.12.1 Hoist Holding Brakes
25 2-1.12.2 Hoist Control Braking Means
2-1.12.3 Trolley Brakes and Braking Means
2-1.12.4 Bridge Brakes and Braking Means
2-1.12.5 Trolley and Bridge Brake Provisions
SECTION 2-1.13: ELECTRICAL EQUIPMENT
2-1.13.1 General
26 2-1.13.2 Equipment
2-1.13.3 Controllers
2-1.13.4 Resistors
27 Figure 2-1.13.3-1 Recommended Arrangement of Controllers or Master Switches (Three-Motion Crane)
Figure 2-1.13.3-2 Recommended Arrangement of Controllers or Master Switches (Four-Motion Crane)
28 Figure 2-1.13.3-3 Recommended Arrangement of Controllers (Pendant Push-Button Station Arrangement)
Figure 2-1.13.3-4 Recommended Arrangement of Controllers (Radio Crane Control Transmitter Lever Arrangement)
29 2-1.13.5 Disconnecting Means
2-1.13.6 Hoist Limit Switches
2-1.13.7 Runway and Bridge Conductor Systems
2-1.13.8 Crane Powered Lifting Devices
2-1.13.9 Service Receptacle
SECTION 2-1.14: HOISTING EQUIPMENT
2-1.14.1 Sheaves
2-1.14.2 Drums
30 2-1.14.3 Ropes
2-1.14.4 Equalizers
2-1.14.5 Hooks
2-1.14.6 Guards for Hoisting Ropes
SECTION 2-1.15: WARNING DEVICES OR MEANS FOR A CRANE WITH A POWER-TRAVELING MECHANISM
2-1.15.1 Cab- and Remote-Operated Cranes
2-1.15.2 Floor-Operated Cranes
2-1.15.3 Types of Devices
31 SECTION 2-1.16: MANUAL
2-1.16.1 General Information
2-1.16.2 Safety Personnel
SECTION 2-1.17: TRANSLATION OF SAFETY-RELATED INFORMATION AND CONTROL DESIGNATIONS
32 Chapter 2-2 Inspection and Testing
SECTION 2-2.1: INSPECTION
2-2.1.1 General
2-2.1.2 Initial Inspection
2-2.1.3 Functional Test Inspection
2-2.1.4 Frequent Inspection
33 2-2.1.5 Periodic Inspection
2-2.1.6 Inspection of Cranes Not in Regular Use
SECTION 2-2.2: ROPE INSPECTION
2-2.2.1 General
2-2.2.2 Frequent Rope Inspection
2-2.2.3 Periodic Rope Inspection
34 SECTION 2-2.3: TESTING
2-2.3.1 Operational Tests
2-2.3.2 Load Test
35 Chapter 2-3 Operator Training and Operation
SECTION 2-3.1: CRANE OPERATOR TRAINING
2-3.1.1 Purpose of Crane Operator Training
2-3.1.2 Crane Operator Training: General
2-3.1.3 Sources of Training Material
SECTION 2-3.2: TRAINING FOR PERSONS OTHER THAN CRANE OPERATORS
2-3.2.1 Scope
SECTION 2-3.3: OPERATION
2-3.3.1 Scope of Crane Operation
2-3.3.2 General Requirements
36 2-3.3.3 Responsibilities of Management (Owners/Users)
2-3.3.4 Responsibilities of Crane Operators
38 2-3.3.5 Responsibilities of Riggers
2-3.3.6 Responsibilities of Signalpersons
39 SECTION 2-3.4: PLANNING FOR LOAD HANDLING ACTIVITIES
2-3.4.1 Lift Planning
2-3.4.2 Planned Engineered Lifts
SECTION 2-3.5: HOIST LIMIT DEVICES (SWITCHES)
SECTION 2-3.6: SIGNALS
2-3.6.1 Standard Signals
40 2-3.6.2 Special Signals
SECTION 2-3.7: MISCELLANEOUS
2-3.7.1 Ladders
2-3.7.2 Cabs
2-3.7.3 Fire Extinguishers
SECTION 2-3.8: CRANE LOCKOUT/TAGOUT
2-3.8.1 General
41 Figure 2-3.6.1-1 Standard Hand Signals for Controlling Overhead and Gantry Cranes
42 Chapter 2-4 Maintenance Training and Maintenance
SECTION 2-4.1: MAINTENANCE TRAINING
2-4.1.1 Purpose of Maintenance Training
2-4.1.2 Crane Maintenance Training: General
2-4.1.3 Sources of Training
2-4.1.4 Responsibilities of Crane Maintenance Personnel
SECTION 2-4.2: CRANE MAINTENANCE
2-4.2.1 General Maintenance
43 2-4.2.2 Preventive Maintenance
2-4.2.3 Maintenance Procedure
2-4.2.4 Adjustments, Repairs, and Replacements
2-4.2.5 Lubrication
SECTION 2-4.3: ROPE REPLACEMENT AND MAINTENANCE
2-4.3.1 Rope Replacement
44 2-4.3.2 Rope Maintenance
SECTION 2-4.4 MAINTENANCE RECORDS
ASME B30.2 2022
$98.04