Volume B30.9 includes provisions that apply to the fabrication, attachment, use, inspection, testing, and maintenance of slings used for load handling purposes, used in conjunction with equipment described in other volumes of the B30 Standard, except as restricted in ASME B30.12 and ASME B30.23. Slings fabricated from alloy steel chain, wire rope, metal mesh, synthetic fiber rope, synthetic webbing, and polyester fiber yarns in a protective cover(s) are addressed.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | CONTENTS |
8 | FOREWORD |
9 | ASME B30 COMMITTEE ROSTER |
12 | B30 STANDARD INTRODUCTION |
15 | ASME B30.9-2018 SUMMARY OF CHANGES |
18 | Chapter 9-0 Scope, Definitions, Personnel Competence, Rigger Responsibilities, Translations, and References SECTION 9-0.1: SCOPE OF ASME B30.9 SECTION 9-0.2: DEFINITIONS |
20 | SECTION 9-0.3: PERSONNEL COMPETENCE SECTION 9-0.4: RIGGER RESPONSIBILITIES SECTION 9-0.5: ORIGINAL AND TRANSLATED TECHNICAL AND SAFETY-RELATED INFORMATION SECTION 9-0.6: REFERENCES |
22 | Chapter 9-1 Alloy Steel Chain Slings: Selection, Use, and Maintenance SECTION 9-1.0: SCOPE SECTION 9-1.1: TRAINING SECTION 9-1.2: COMPONENTS 9-1.2.1 Alloy Chain 9-1.2.2 Fittings 9-1.2.3 Other Components SECTION 9-1.3: FABRICATION AND CONFIGURATIONS 9-1.3.1 Fabrication 9-1.3.2 Configurations SECTION 9-1.4: DESIGN FACTOR SECTION 9-1.5: RATED LOAD |
23 | Figures Figure 9-1.0-1 Alloy Steel Chain Slings: Configurations, Components, and Hitches |
24 | SECTION 9-1.6: PROOF TEST REQUIREMENTS 9-1.6.1 General 9-1.6.2 Proof Load Requirements SECTION 9-1.7: SLING IDENTIFICATION 9-1.7.1 Identification Requirements 9-1.7.2 Initial Sling Identification 9-1.7.3 Maintenance of Sling Identification 9-1.7.4 Replacement of Sling Identification SECTION 9-1.8: EFFECTS OF ENVIRONMENT 9-1.8.1 Temperature 9-1.8.2 Chemically Active Environments SECTION 9-1.9: INSPECTION, REMOVAL, AND REPAIR 9-1.9.1 General 9-1.9.2 Initial Inspection Figure 9-1.5-1 Angle of Loading |
25 | 9-1.9.3 Frequent Inspection 9-1.9.4 Periodic Inspection 9-1.9.5 Removal Criteria 9-1.9.6 Repair Tables Table 9-1.8.1-1 Effect of Elevated Temperature on Rated Load of Alloy Steel Chain |
26 | SECTION 9-1.10: OPERATING PRACTICES 9-1.10.1 Sling Selection 9-1.10.2 Cautions to Personnel 9-1.10.3 Effects of Environment 9-1.10.4 Rigging Practices Table 9-1.9.5-1 Minimum Allowable Thickness at Any Point on a Link |
27 | Table 9-1.10.1-1 Basket Sling Hitch-Rated Capacity Affected by D/d |
28 | Chapter 9-2 Wire Rope Slings: Selection, Use, and Maintenance SECTION 9-2.0: SCOPE SECTION 9-2.1: TRAINING SECTION 9-2.2: COMPONENTS 9-2.2.1 Wire Rope 9-2.2.2 Fittings 9-2.2.3 Other Components SECTION 9-2.3: FABRICATION AND CONFIGURATIONS 9-2.3.1 Fabrication Figure 9-2.0-1 Wire Rope Sling |
29 | 9-2.3.2 Configurations SECTION 9-2.4: DESIGN FACTOR SECTION 9-2.5: RATED LOAD SECTION 9-2.6: PROOF TEST REQUIREMENTS 9-2.6.1 General 9-2.6.2 Proof Load Requirements Figure 9-2.0-2 Wire Rope |
30 | SECTION 9-2.7: SLING IDENTIFICATION 9-2.7.1 Identification Requirements 9-2.7.2 Initial Sling Identification 9-2.7.3 Maintenance of Sling Identification 9-2.7.4 Replacement of Sling Identification SECTION 9-2.8: EFFECTS OF ENVIRONMENT 9-2.8.1 Temperature 9-2.8.2 Chemically Active Environments Figure 9-2.3.2-1 Minimum Sling Length Figure 9-2.3.2-2 Minimum Braided Sling Length Figure 9-2.5-1 Angle of Loading |
31 | SECTION 9-2.9: INSPECTION, REMOVAL, AND REPAIR 9-2.9.1 General 9-2.9.2 Initial Inspection 9-2.9.3 Frequent Inspection 9-2.9.4 Periodic Inspection 9-2.9.5 Removal Criteria 9-2.9.6 Repair |
32 | SECTION 9-2.10: OPERATING PRACTICES 9-2.10.1 Sling Selection 9-2.10.2 Cautions to Personnel 9-2.10.3 Effects of Environment Figure 9-2.9.5-1 Cable-Laid Wire Rope Sling |
33 | 9-2.10.4 Rigging Practices Figure 9-2.10.1-1 D/d Ratio: Wire Rope Slings Table 9-2.10.1-1 Angle of Choke: Wire Rope Slings |
35 | Chapter 9-3 Metal Mesh Slings: Selection, Use, and Maintenance SECTION 9-3.0: SCOPE SECTION 9-3.1: TRAINING SECTION 9-3.2: COMPONENTS 9-3.2.1 Metal Mesh 9-3.2.2 Fittings 9-3.2.3 Other Components SECTION 9-3.3: FABRICATION AND CONFIGURATIONS 9-3.3.1 Fabrication 9-3.3.2 Coatings 9-3.3.3 Configurations SECTION 9-3.4: DESIGN FACTOR SECTION 9-3.5: RATED LOAD SECTION 9-3.6: PROOF TEST REQUIREMENTS 9-3.6.1 General 9-3.6.2 Proof Load Requirements SECTION 9-3.7: SLING IDENTIFICATION 9-3.7.1 Identification Requirements |
36 | 9-3.7.2 Initial Sling Identification 9-3.7.3 Maintenance of Sling Identification 9-3.7.4 Replacement of Sling Identification SECTION 9-3.8: EFFECTS OF ENVIRONMENT 9-3.8.1 Temperature Figure 9-3.0-1 Metal Mesh Sling Table 9-3.2.1-1 Fabric Construction: Metal Mesh Slings |
37 | 9-3.8.2 Chemically Active Environments SECTION 9-3.9: INSPECTION, REMOVAL, AND REPAIR 9-3.9.1 General 9-3.9.2 Initial Inspection 9-3.9.3 Frequent Inspection 9-3.9.4 Periodic Inspection 9-3.9.5 Removal Criteria Figure 9-3.5-1 Angle of Loading |
38 | 9-3.9.6 Repair SECTION 9-3.10: OPERATING PRACTICES 9-3.10.1 Sling Selection 9-3.10.2 Cautions to Personnel 9-3.10.3 Effects of Environment 9-3.10.4 Rigging Practices Figure 9-3.10.1-1 Angle of Choke: Metal Mesh Slings |
40 | Chapter 9-4 Synthetic Rope Slings: Selection, Use, and Maintenance SECTION 9-4.0: SCOPE SECTION 9-4.1: TRAINING SECTION 9-4.2: COMPONENTS 9-4.2.1 Synthetic Ropes 9-4.2.2 Fittings 9-4.2.3 Other Components SECTION 9-4.3: FABRICATION AND CONFIGURATIONS 9-4.3.1 Fabrication |
41 | 9-4.3.2 Coatings 9-4.3.3 Configurations SECTION 9-4.4: DESIGN FACTOR SECTION 9-4.5: RATED LOAD SECTION 9-4.6: PROOF TEST REQUIREMENTS 9-4.6.1 General 9-4.6.2 Proof Load Requirements Figure 9-4.0-1 Synthetic Fiber Rope Slings |
42 | Figure 9-4.5-1 Hitch Types for Synthetic Rope Slings |
43 | SECTION 9-4.7: SLING IDENTIFICATION 9-4.7.1 Identification Requirements 9-4.7.2 Initial Sling Identification 9-4.7.3 Maintenance of Sling Identification 9-4.7.4 Replacement of Sling Identification SECTION 9-4.8: EFFECTS OF ENVIRONMENT 9-4.8.1 Temperature 9-4.8.2 Chemically Active Environments 9-4.8.3 Sunlight and Ultraviolet Light SECTION 9-4.9: INSPECTION, REMOVAL, AND REPAIR 9-4.9.1 General 9-4.9.2 Initial Inspection 9-4.9.3 Frequent Inspection 9-4.9.4 Periodic Inspection Figure 9-4.5-2 Angle of Loading |
44 | 9-4.9.5 Removal Criteria 9-4.9.6 Repair SECTION 9-4.10: OPERATING PRACTICES 9-4.10.1 Sling Selection |
45 | 9-4.10.2 Cautions to Personnel 9-4.10.3 Effects of Environment Figure 9-4.10.1-1 D/d Ratio: Synthetic Rope Slings Table 9-4.10.1-1 Angle of Choke: Synthetic Rope Slings |
46 | 9-4.10.4 Rigging Practices |
47 | Chapter 9-5 Synthetic Webbing Slings: Selection, Use, and Maintenance SECTION 9-5.0: SCOPE SECTION 9-5.1: TRAINING SECTION 9-5.2: COMPONENTS 9-5.2.1 Webbing 9-5.2.2 Thread 9-5.2.3 Fittings 9-5.2.4 Other Components SECTION 9-5.3: FABRICATION AND CONFIGURATIONS 9-5.3.1 Fabrication 9-5.3.2 Coatings 9-5.3.3 Configurations SECTION 9-5.4: DESIGN FACTOR SECTION 9-5.5: RATED LOAD |
48 | Figure 9-5.0-1 Synthetic Webbing Slings Figure 9-5.0-2 Synthetic Webbing Sling Nomenclature Figure 9-5.5-1 Angle of Loading |
49 | SECTION 9-5.6: PROOF TEST REQUIREMENTS 9-5.6.1 General 9-5.6.2 Proof Load Requirements SECTION 9-5.7: SLING IDENTIFICATION 9-5.7.1 Identification Requirements 9-5.7.2 Initial Sling Identification 9-5.7.3 Maintenance of Sling Identification 9-5.7.4 Replacement of Sling Identification SECTION 9-5.8: EFFECTS OF ENVIRONMENT 9-5.8.1 Temperature 9-5.8.2 Chemically Active Environments 9-5.8.3 Sunlight and Ultraviolet Light SECTION 9-5.9: INSPECTION, REMOVAL, AND REPAIR 9-5.9.1 General 9-5.9.2 Initial Inspection 9-5.9.3 Frequent Inspection 9-5.9.4 Periodic Inspection |
50 | 9-5.9.5 Removal Criteria 9-5.9.6 Repair SECTION 9-5.10: OPERATING PRACTICES 9-5.10.1 Sling Selection |
51 | 9-5.10.2 Cautions to Personnel 9-5.10.3 Effects of Environment 9-5.10.4 Rigging Practices Table 9-5.10.1-1 Angle of Choke: Synthetic Webbing Slings |
52 | Chapter 9-6 Polyester Roundslings: Selection, Use, and Maintenance SECTION 9-6.0: SCOPE SECTION 9-6.1: TRAINING SECTION 9-6.2: COMPONENTS 9-6.2.1 Core 9-6.2.2 Fittings 9-6.2.3 Other Components SECTION 9-6.3: FABRICATION AND CONFIGURATIONS 9-6.3.1 Fabrication 9-6.3.2 Thread Figure 9-6.0-1 Polyester Roundsling Types |
53 | 9-6.3.3 Coatings 9-6.3.4 Configurations SECTION 9-6.4: DESIGN FACTOR SECTION 9-6.5: RATED LOAD SECTION 9-6.6: PROOF TEST REQUIREMENTS 9-6.6.1 General 9-6.6.2 Proof Load Requirements SECTION 9-6.7: SLING IDENTIFICATION 9-6.7.1 Identification Requirements 9-6.7.2 Initial Sling Identification 9-6.7.3 Maintenance of Sling Identification 9-6.7.4 Replacement of Sling Identification Figure 9-6.5-1 Angle of Loading |
54 | SECTION 9-6.8: EFFECTS OF ENVIRONMENT 9-6.8.1 Temperature 9-6.8.2 Chemically Active Environments SECTION 9-6.9: INSPECTION, REMOVAL, AND REPAIR 9-6.9.1 General 9-6.9.2 Initial Inspection 9-6.9.3 Frequent Inspection 9-6.9.4 Periodic Inspection 9-6.9.5 Removal Criteria 9-6.9.6 Repair |
55 | SECTION 9-6.10: OPERATING PRACTICES 9-6.10.1 Sling Selection 9-6.10.2 Cautions to Personnel 9-6.10.3 Effects of Environment Table 9-6.10.1-1 Angle of Choke: High Performance Roundslings |
56 | 9-6.10.4 Rigging Practices |
57 | Chapter 9-7 High Performance Roundslings: Selection, Use, and Maintenance SECTION 9-7.0: SCOPE SECTION 9-7.1: TRAINING SECTION 9-7.2: COMPONENTS 9-7.2.1 Core 9-7.2.2 Fittings 9-7.2.3 Other Components SECTION 9-7.3: FABRICATION AND CONFIGURATIONS 9-7.3.1 Fabrication 9-7.3.2 Thread 9-7.3.3 Coatings Figure 9-7.0-1 High Performance Roundsling Types |
58 | 9-7.3.4 Configurations SECTION 9-7.4: DESIGN FACTOR SECTION 9-7.5: RATED LOAD SECTION 9-7.6: PROOF TEST REQUIREMENTS 9-7.6.1 General 9-7.6.2 Proof Load Requirements SECTION 9-7.7: SLING IDENTIFICATION 9-7.7.1 Identification Requirements 9-7.7.2 Initial Sling Identification 9-7.7.3 Maintenance of Sling Identification 9-7.7.4 Replacement of Sling Identification Figure 9-7.5-1 Angle of Loading |
59 | SECTION 9-7.8: EFFECTS OF ENVIRONMENT 9-7.8.1 Temperature 9-7.8.2 Chemically Active Environments SECTION 9-7.9: INSPECTION, REMOVAL, AND REPAIR 9-7.9.1 General 9-7.9.2 Initial Inspection 9-7.9.3 Frequent Inspection 9-7.9.4 Periodic Inspection 9-7.9.5 Removal Criteria 9-7.9.6 Repair |
60 | SECTION 9-7.10: OPERATING PRACTICES 9-7.10.1 Sling Selection 9-7.10.2 Cautions to Personnel 9-7.10.3 Effects of Environment Table 9-7.10.1-1 Angle of Choke: High Performance Roundslings |
61 | 9-7.10.4 Rigging Practices |