Shopping Cart

No products in the cart.

ASME B31.8S 2016

$98.04

ASME B31.8S Managing System Integrity of Gas Pipelines

Published By Publication Date Number of Pages
ASME 2016 78
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

ASME has been defining piping safety since 1922. ASME’s B31.8S Managing System Integrity of Gas Pipelines covers on-shore, gas pipeline systems constructed with ferrous materials, including pipe, valves, appurtenances attached to pipe, compressor units, metering stations, regulator stations, delivery stations, holders and fabricated assemblies. Its principles, processes and approaches apply to the entire system for all pipeline systems. B31.8S is specifically designed to provide the operator with the information necessary to develop and implement an effective integrity management program utilizing proven industry practices and processes. Effective system management can decrease repair and replacement costs, prevent malfunctions, and minimize system downtime. Key changes to this version include updates to the potential impact area requirements section and non-mandatory appendix A. Intended for manufacturers, users, constructors, designers, and others concerned with the design, fabrication, assembly, erection, examination, inspection, and testing of piping, plus all potential governing entities.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
6 FOREWORD
7 ASME B31 COMMITTEE ROSTER
11 ASME B31.8S-2016 SUMMARY OF CHANGES
12 1 INTRODUCTION
1.1 Scope
1.2 Purpose and Objectives
1.3 Integrity Management Principles
13 2 INTEGRITY MANAGEMENT PROGRAM OVERVIEW
2.1 General
14 2.2 Integrity Threat Classification
Figures
Figure 2.1-1 Integrity Management Program Elements
15 Figure 2.1-2 Integrity Management Plan Process Flow Diagram
16 2.3 The Integrity Management Process
17 2.4 Integrity Management Program
18 3 CONSEQUENCES
3.1 General
3.2 Potential Impact Area
19 3.3 Consequence Factors to Consider
Figure 3.2.4-1 Potential Impact Area
20 4 GATHERING, REVIEWING, AND INTEGRATING DATA
4.1 General
4.2 Data Requirements
Tables
Table 4.2.1-1 Data Elements for Prescriptive Pipeline Integrity Program
21 4.3 Data Sources
4.4 Data Collection, Review, and Analysis
4.5 Data Integration
Table 4.3-1 Typical Data Sources for Pipeline Integrity Program
22 5 RISK ASSESSMENT
5.1 Introduction
5.2 Definition
5.3 Risk Assessment Objectives
23 5.4 Developing a Risk Assessment Approach
5.5 Risk Assessment Approaches
24 5.6 Risk Analysis
5.7 Characteristics of an Effective Risk Assessment Approach
25 Table 5.6.1-1 Integrity Assessment Intervals: Time-Dependent Threats, Internal and External Corrosion, Prescriptive Integrity Management Plan
26 5.8 Risk Estimates Using Assessment Methods
5.9 Data Collection for Risk Assessment
27 5.10 Prioritization for Prescriptive-Based and Performance-Based Integrity Management Programs
5.11 Integrity Assessment and Mitigation
5.12 Validation
28 6 INTEGRITY ASSESSMENT
6.1 General
6.2 Pipeline In-Line Inspection
30 6.3 Pressure Testing
6.4 Direct Assessment
32 6.5 Other Integrity Assessment Methodologies
7 RESPONSES TO INTEGRITY ASSESSMENTS AND MITIGATION (REPAIR AND PREVENTION)
7.1 General
7.2 Responses to Pipeline In-Line Inspections
33 Table 7.1-1 Acceptable Threat Prevention and Repair Methods
36 Figure 7.2.1-1 Timing for Scheduled Responses: Time-Dependent Threats, Prescriptive Integrity Management Plan
37 7.3 Responses to Pressure Testing
7.4 Responses to Direct Assessment Inspections
38 7.5 Timing for Scheduled Responses
7.6 Repair Methods
7.7 Prevention Strategy/Methods
7.8 Prevention Options
8 INTEGRITY MANAGEMENT PLAN
8.1 General
39 8.2 Updating the Plan
8.3 Plan Framework
40 9 PERFORMANCE PLAN
9.1 Introduction
Table 8.3.4-1 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Segment Data: Line 1, Segment 3)
41 9.2 Performance Measures Characteristics
Table 8.3.4-2 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Integrity Assessment Plan: Line 1, Segment 3)
42 9.3 Performance Measurement Methodology
9.4 Performance Measurement: Intrasystem
Table 9.2.3-1 Performance Measures
43 Table 9.4-1 Performance Metrics
44 9.5 Performance Measurement: Industry Based
9.6 Performance Improvement
Table 9.4-2 Overall Performance Measures
Table 9.4-2 Overall Performance Measures
45 10 COMMUNICATIONS PLAN
10.1 General
10.2 External Communications
10.3 Internal Communications
11 MANAGEMENT OF CHANGE PLAN
46 12 QUALITY CONTROL PLAN
12.1 General
12.2 Quality Management Control
47 13 TERMS, DEFINITIONS, AND ACRONYMS
Figure 13-1 Hierarchy of Terminology for Integrity Assessment
53 14 REFERENCES AND STANDARDS
56 NONMANDATORY APPENDIX A THREAT PROCESS CHARTS AND PRESCRIPTIVE INTEGRITY MANAGEMENT PLANS
A-1 INTRODUCTION
A-2 EXTERNAL CORROSION THREAT
A-2.1 Scope
A-2.2 Gathering, Reviewing, and Integrating Data
A-2.3 Criteria and Risk Assessment
A-2.4 Integrity Assessment
57 Figure A-2.1-1 Integrity Management Plan, External Corrosion Threat (Simplified Process: Prescriptive)
A-2.5 Responses and Mitigation
Figure A-2.1-1 Integrity Management Plan, External Corrosion Threat (Simplified Process: Prescriptive)
58 A-2.6 Other Data
A-2.7 Assessment Interval
A-2.8 Performance Measures
A-3 INTERNAL CORROSION THREAT
A-3.1 Scope
A-3.2 Gathering, Reviewing, and Integrating Data
A-3.3 Criteria and Risk Assessment
59 Figure A-3.1-1 Integrity Management Plan, Internal Corrosion Threat (Simplified Process: Prescriptive)
A-3.4 Integrity Assessment
A-3.5 Responses and Mitigation
Figure A-3.1-1 Integrity Management Plan, Internal Corrosion Threat (Simplified Process: Prescriptive)
60 A-3.6 Other Data
A-3.7 Assessment Interval
A-3.8 Performance Metrics
A-4 STRESS CORROSION CRACKING THREAT
A-4.1 Scope
A-4.2 Gathering, Reviewing, and Integrating Data
61 Table A-4.4-1 SCC Crack Severity Criteria
A-4.3 Criteria and Threat Assessment
A-4.3.1 Possible Threat of Near-Neutral pH SCC.
A-4.3.2 Possible Threat of High pH SCC.
A-4.3.3 Additional Considerations.
A-4.4 Integrity Assessment
A-4.4.1 Bell Hole Examination and Evaluation Method.
Table A-4.4-1 SCC Crack Severity Criteria
62 Table A-4.4.1-1 Actions Following Discovery of SCC During Excavation
A-4.4.2 Hydrostatic Testing for SCC.
A-4.4.3 In-Line Inspection for SCC.
A-4.4.4 Stress Corrosion Cracking Direct Assessment (SCCDA).
A-4.5 Other Data
A-4.6 Performance Measures
Table A-4.4.1-1 Actions Following Discovery of SCC During Excavation
63 Figure A-5.1-1 Integrity Management Plan, Manufacturing Threat (Pipe Seam and Pipe; Simplified Process: Prescriptive)
A-5 MANUFACTURING THREAT (PIPE SEAM AND PIPE)
A-5.1 Scope
A-5.2 Gathering, Reviewing, and Integrating Data
Figure A-5.1-1 Integrity Management Plan, Manufacturing Threat (Pipe Seam and Pipe; Simplified Process: Prescriptive)
64 A-5.3 Criteria and Risk Assessment
A-5.4 Integrity Assessment
A-5.5 Responses and Mitigation
A-5.6 Other Data
A-5.7 Assessment Interval
A-5.8 Performance Measures
A-6 CONSTRUCTION THREAT (PIPE GIRTH WELD, FABRICATION WELD, WRINKLE BEND OR BUCKLE, STRIPPED THREADS/BROKEN PIPE/COUPLING)
A-6.1 Scope
A-6.2 Gathering, Reviewing, and Integrating Data
65 Figure A-6.1-1 Integrity Management Plan, Construction Threat (Pipe Girth Weld, Fabrication Weld, Wrinkle Bend or Buckle, Stripped Threads/Broken Pipe/Coupling; Simplified Process: Prescriptive)
A-6.3 Criteria and Risk Assessment
Figure A-6.1-1 Integrity Management Plan, Construction Threat (Pipe Girth Weld, Fabrication Weld, Wrinkle Bend or Buckle, Stripped Threads/Broken Pipe/Coupling; Simplified Process: Prescriptive)
66 A-6.4 Integrity Assessment
A-6.5 Responses and Mitigation
A-6.6 Other Data
A-6.7 Assessment Interval
A-6.8 Performance Measures
A-7 EQUIPMENT THREAT (GASKETS AND O-RINGS, CONTROL/RELIEF, SEAL/PUMP PACKING)
A-7.1 Scope
A-7.2 Gathering, Reviewing, and Integrating Data
67 Figure A-7.1-1 Integrity Management Plan, Equipment Threat (Gasket and O-Ring, Control/Relief, Seal/Pump Packing; Simplified Process: Prescriptive)
A-7.3 Criteria and Risk Assessment
A-7.4 Integrity Assessment
A-7.5 Responses and Mitigation
A-7.6 Other Data
Figure A-7.1-1 Integrity Management Plan, Equipment Threat (Gasket and O-Ring, Control/Relief, Seal/Pump Packing; Simplified Process: Prescriptive)
68 Figure A-8.1-1 Integrity Management Plan, Third-Party Damage Threat [Third-Party Inflicted Damage (Immediate), Vandalism, Previously Damaged Pipe; Simplified Process: Prescriptive]
A-7.7 Assessment Interval
A-7.8 Performance Measures
A-8 THIRD-PARTY DAMAGE THREAT [THIRD-PARTY INFLICTED DAMAGE (IMMEDIATE), VANDALISM, PREVIOUSLY DAMAGED PIPE]
A-8.1 Scope
Figure A-8.1-1 Integrity Management Plan, Third-Party Damage Threat [Third-Party Inflicted Damage (Immediate), Vandalism, Previously Damaged Pipe; Simplified Process: Prescriptive]
69 A-8.2 Gathering, Reviewing, and Integrating Data
A-8.3 Criteria and Risk Assessment
A-8.4 Integrity Assessment
A-8.5 Responses and Mitigation
A-8.6 Other Data
A-8.7 Assessment Interval
A-8.8 Performance Measures
A-9 INCORRECT OPERATIONS THREAT
A-9.1 Scope
A-9.2 Gathering, Reviewing, and Integrating Data
70 Figure A-9.1-1 Integrity Management Plan, Incorrect Operations Threat (Simplified Process: Prescriptive)
A-9.3 Criteria and Risk Assessment
A-9.4 Integrity Assessment
A-9.5 Responses and Mitigation
Figure A-9.1-1 Integrity Management Plan, Incorrect Operations Threat (Simplified Process: Prescriptive)
71 A-9.6 Other Data
A-9.7 Assessment Interval
A-9.8 Performance Measures
A-10 WEATHER-RELATED AND OUTSIDE FORCE THREAT (EARTH MOVEMENT, HEAVY RAINS OR FLOODS, COLD WEATHER, LIGHTNING)
A-10.1 Scope
A-10.2 Gathering, Reviewing, and Integrating Data
A-10.3 Criteria and Risk Assessment
A-10.4 Integrity Assessment
72 FigureA-10.1-1 Integrity Management Plan, Weather-Related and Outside Force Threat (Earth Movement, Heavy Rains or Floods, Cold Weather, Lightning; Simplified Process: Prescriptive)
A-10.5 Responses and Mitigation
A-10.6 Other Data
A-10.7 Assessment Interval
Figure A-10.1-1 Integrity Management Plan, Weather-Related and Outside Force Threat (Earth Movement, Heavy Rains or Floods, Cold Weather, Lightning; Simplified Process: Prescriptive)
73 A-10.8 Performance Measures
74 NONMANDATORY APPENDIX B DIRECT ASSESSMENT PROCESS
B-1 GENERAL
B-2 EXTERNAL CORROSION DIRECT ASSESSMENT
B-3 INTERNAL CORROSION DIRECT ASSESSMENT
75 NONMANDATORY APPENDIX C PREPARATION OF TECHNICAL INQUIRIES
C-1 INTRODUCTION
C-2 REQUIREMENTS
C-3 SUBMITTAL
ASME B31.8S 2016
$98.04