ASME B31.8S 2016
$98.04
ASME B31.8S Managing System Integrity of Gas Pipelines
Published By | Publication Date | Number of Pages |
ASME | 2016 | 78 |
ASME has been defining piping safety since 1922. ASME’s B31.8S Managing System Integrity of Gas Pipelines covers on-shore, gas pipeline systems constructed with ferrous materials, including pipe, valves, appurtenances attached to pipe, compressor units, metering stations, regulator stations, delivery stations, holders and fabricated assemblies. Its principles, processes and approaches apply to the entire system for all pipeline systems. B31.8S is specifically designed to provide the operator with the information necessary to develop and implement an effective integrity management program utilizing proven industry practices and processes. Effective system management can decrease repair and replacement costs, prevent malfunctions, and minimize system downtime. Key changes to this version include updates to the potential impact area requirements section and non-mandatory appendix A. Intended for manufacturers, users, constructors, designers, and others concerned with the design, fabrication, assembly, erection, examination, inspection, and testing of piping, plus all potential governing entities.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | CONTENTS |
6 | FOREWORD |
7 | ASME B31 COMMITTEE ROSTER |
11 | ASME B31.8S-2016 SUMMARY OF CHANGES |
12 | 1 INTRODUCTION 1.1 Scope 1.2 Purpose and Objectives 1.3 Integrity Management Principles |
13 | 2 INTEGRITY MANAGEMENT PROGRAM OVERVIEW 2.1 General |
14 | 2.2 Integrity Threat Classification Figures Figure 2.1-1 Integrity Management Program Elements |
15 | Figure 2.1-2 Integrity Management Plan Process Flow Diagram |
16 | 2.3 The Integrity Management Process |
17 | 2.4 Integrity Management Program |
18 | 3 CONSEQUENCES 3.1 General 3.2 Potential Impact Area |
19 | 3.3 Consequence Factors to Consider Figure 3.2.4-1 Potential Impact Area |
20 | 4 GATHERING, REVIEWING, AND INTEGRATING DATA 4.1 General 4.2 Data Requirements Tables Table 4.2.1-1 Data Elements for Prescriptive Pipeline Integrity Program |
21 | 4.3 Data Sources 4.4 Data Collection, Review, and Analysis 4.5 Data Integration Table 4.3-1 Typical Data Sources for Pipeline Integrity Program |
22 | 5 RISK ASSESSMENT 5.1 Introduction 5.2 Definition 5.3 Risk Assessment Objectives |
23 | 5.4 Developing a Risk Assessment Approach 5.5 Risk Assessment Approaches |
24 | 5.6 Risk Analysis 5.7 Characteristics of an Effective Risk Assessment Approach |
25 | Table 5.6.1-1 Integrity Assessment Intervals: Time-Dependent Threats, Internal and External Corrosion, Prescriptive Integrity Management Plan |
26 | 5.8 Risk Estimates Using Assessment Methods 5.9 Data Collection for Risk Assessment |
27 | 5.10 Prioritization for Prescriptive-Based and Performance-Based Integrity Management Programs 5.11 Integrity Assessment and Mitigation 5.12 Validation |
28 | 6 INTEGRITY ASSESSMENT 6.1 General 6.2 Pipeline In-Line Inspection |
30 | 6.3 Pressure Testing 6.4 Direct Assessment |
32 | 6.5 Other Integrity Assessment Methodologies 7 RESPONSES TO INTEGRITY ASSESSMENTS AND MITIGATION (REPAIR AND PREVENTION) 7.1 General 7.2 Responses to Pipeline In-Line Inspections |
33 | Table 7.1-1 Acceptable Threat Prevention and Repair Methods |
36 | Figure 7.2.1-1 Timing for Scheduled Responses: Time-Dependent Threats, Prescriptive Integrity Management Plan |
37 | 7.3 Responses to Pressure Testing 7.4 Responses to Direct Assessment Inspections |
38 | 7.5 Timing for Scheduled Responses 7.6 Repair Methods 7.7 Prevention Strategy/Methods 7.8 Prevention Options 8 INTEGRITY MANAGEMENT PLAN 8.1 General |
39 | 8.2 Updating the Plan 8.3 Plan Framework |
40 | 9 PERFORMANCE PLAN 9.1 Introduction Table 8.3.4-1 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Segment Data: Line 1, Segment 3) |
41 | 9.2 Performance Measures Characteristics Table 8.3.4-2 Example of Integrity Management Plan for Hypothetical Pipeline Segment (Integrity Assessment Plan: Line 1, Segment 3) |
42 | 9.3 Performance Measurement Methodology 9.4 Performance Measurement: Intrasystem Table 9.2.3-1 Performance Measures |
43 | Table 9.4-1 Performance Metrics |
44 | 9.5 Performance Measurement: Industry Based 9.6 Performance Improvement Table 9.4-2 Overall Performance Measures Table 9.4-2 Overall Performance Measures |
45 | 10 COMMUNICATIONS PLAN 10.1 General 10.2 External Communications 10.3 Internal Communications 11 MANAGEMENT OF CHANGE PLAN |
46 | 12 QUALITY CONTROL PLAN 12.1 General 12.2 Quality Management Control |
47 | 13 TERMS, DEFINITIONS, AND ACRONYMS Figure 13-1 Hierarchy of Terminology for Integrity Assessment |
53 | 14 REFERENCES AND STANDARDS |
56 | NONMANDATORY APPENDIX A THREAT PROCESS CHARTS AND PRESCRIPTIVE INTEGRITY MANAGEMENT PLANS A-1 INTRODUCTION A-2 EXTERNAL CORROSION THREAT A-2.1 Scope A-2.2 Gathering, Reviewing, and Integrating Data A-2.3 Criteria and Risk Assessment A-2.4 Integrity Assessment |
57 | Figure A-2.1-1 Integrity Management Plan, External Corrosion Threat (Simplified Process: Prescriptive) A-2.5 Responses and Mitigation Figure A-2.1-1 Integrity Management Plan, External Corrosion Threat (Simplified Process: Prescriptive) |
58 | A-2.6 Other Data A-2.7 Assessment Interval A-2.8 Performance Measures A-3 INTERNAL CORROSION THREAT A-3.1 Scope A-3.2 Gathering, Reviewing, and Integrating Data A-3.3 Criteria and Risk Assessment |
59 | Figure A-3.1-1 Integrity Management Plan, Internal Corrosion Threat (Simplified Process: Prescriptive) A-3.4 Integrity Assessment A-3.5 Responses and Mitigation Figure A-3.1-1 Integrity Management Plan, Internal Corrosion Threat (Simplified Process: Prescriptive) |
60 | A-3.6 Other Data A-3.7 Assessment Interval A-3.8 Performance Metrics A-4 STRESS CORROSION CRACKING THREAT A-4.1 Scope A-4.2 Gathering, Reviewing, and Integrating Data |
61 | Table A-4.4-1 SCC Crack Severity Criteria A-4.3 Criteria and Threat Assessment A-4.3.1 Possible Threat of Near-Neutral pH SCC. A-4.3.2 Possible Threat of High pH SCC. A-4.3.3 Additional Considerations. A-4.4 Integrity Assessment A-4.4.1 Bell Hole Examination and Evaluation Method. Table A-4.4-1 SCC Crack Severity Criteria |
62 | Table A-4.4.1-1 Actions Following Discovery of SCC During Excavation A-4.4.2 Hydrostatic Testing for SCC. A-4.4.3 In-Line Inspection for SCC. A-4.4.4 Stress Corrosion Cracking Direct Assessment (SCCDA). A-4.5 Other Data A-4.6 Performance Measures Table A-4.4.1-1 Actions Following Discovery of SCC During Excavation |
63 | Figure A-5.1-1 Integrity Management Plan, Manufacturing Threat (Pipe Seam and Pipe; Simplified Process: Prescriptive) A-5 MANUFACTURING THREAT (PIPE SEAM AND PIPE) A-5.1 Scope A-5.2 Gathering, Reviewing, and Integrating Data Figure A-5.1-1 Integrity Management Plan, Manufacturing Threat (Pipe Seam and Pipe; Simplified Process: Prescriptive) |
64 | A-5.3 Criteria and Risk Assessment A-5.4 Integrity Assessment A-5.5 Responses and Mitigation A-5.6 Other Data A-5.7 Assessment Interval A-5.8 Performance Measures A-6 CONSTRUCTION THREAT (PIPE GIRTH WELD, FABRICATION WELD, WRINKLE BEND OR BUCKLE, STRIPPED THREADS/BROKEN PIPE/COUPLING) A-6.1 Scope A-6.2 Gathering, Reviewing, and Integrating Data |
65 | Figure A-6.1-1 Integrity Management Plan, Construction Threat (Pipe Girth Weld, Fabrication Weld, Wrinkle Bend or Buckle, Stripped Threads/Broken Pipe/Coupling; Simplified Process: Prescriptive) A-6.3 Criteria and Risk Assessment Figure A-6.1-1 Integrity Management Plan, Construction Threat (Pipe Girth Weld, Fabrication Weld, Wrinkle Bend or Buckle, Stripped Threads/Broken Pipe/Coupling; Simplified Process: Prescriptive) |
66 | A-6.4 Integrity Assessment A-6.5 Responses and Mitigation A-6.6 Other Data A-6.7 Assessment Interval A-6.8 Performance Measures A-7 EQUIPMENT THREAT (GASKETS AND O-RINGS, CONTROL/RELIEF, SEAL/PUMP PACKING) A-7.1 Scope A-7.2 Gathering, Reviewing, and Integrating Data |
67 | Figure A-7.1-1 Integrity Management Plan, Equipment Threat (Gasket and O-Ring, Control/Relief, Seal/Pump Packing; Simplified Process: Prescriptive) A-7.3 Criteria and Risk Assessment A-7.4 Integrity Assessment A-7.5 Responses and Mitigation A-7.6 Other Data Figure A-7.1-1 Integrity Management Plan, Equipment Threat (Gasket and O-Ring, Control/Relief, Seal/Pump Packing; Simplified Process: Prescriptive) |
68 | Figure A-8.1-1 Integrity Management Plan, Third-Party Damage Threat [Third-Party Inflicted Damage (Immediate), Vandalism, Previously Damaged Pipe; Simplified Process: Prescriptive] A-7.7 Assessment Interval A-7.8 Performance Measures A-8 THIRD-PARTY DAMAGE THREAT [THIRD-PARTY INFLICTED DAMAGE (IMMEDIATE), VANDALISM, PREVIOUSLY DAMAGED PIPE] A-8.1 Scope Figure A-8.1-1 Integrity Management Plan, Third-Party Damage Threat [Third-Party Inflicted Damage (Immediate), Vandalism, Previously Damaged Pipe; Simplified Process: Prescriptive] |
69 | A-8.2 Gathering, Reviewing, and Integrating Data A-8.3 Criteria and Risk Assessment A-8.4 Integrity Assessment A-8.5 Responses and Mitigation A-8.6 Other Data A-8.7 Assessment Interval A-8.8 Performance Measures A-9 INCORRECT OPERATIONS THREAT A-9.1 Scope A-9.2 Gathering, Reviewing, and Integrating Data |
70 | Figure A-9.1-1 Integrity Management Plan, Incorrect Operations Threat (Simplified Process: Prescriptive) A-9.3 Criteria and Risk Assessment A-9.4 Integrity Assessment A-9.5 Responses and Mitigation Figure A-9.1-1 Integrity Management Plan, Incorrect Operations Threat (Simplified Process: Prescriptive) |
71 | A-9.6 Other Data A-9.7 Assessment Interval A-9.8 Performance Measures A-10 WEATHER-RELATED AND OUTSIDE FORCE THREAT (EARTH MOVEMENT, HEAVY RAINS OR FLOODS, COLD WEATHER, LIGHTNING) A-10.1 Scope A-10.2 Gathering, Reviewing, and Integrating Data A-10.3 Criteria and Risk Assessment A-10.4 Integrity Assessment |
72 | FigureA-10.1-1 Integrity Management Plan, Weather-Related and Outside Force Threat (Earth Movement, Heavy Rains or Floods, Cold Weather, Lightning; Simplified Process: Prescriptive) A-10.5 Responses and Mitigation A-10.6 Other Data A-10.7 Assessment Interval Figure A-10.1-1 Integrity Management Plan, Weather-Related and Outside Force Threat (Earth Movement, Heavy Rains or Floods, Cold Weather, Lightning; Simplified Process: Prescriptive) |
73 | A-10.8 Performance Measures |
74 | NONMANDATORY APPENDIX B DIRECT ASSESSMENT PROCESS B-1 GENERAL B-2 EXTERNAL CORROSION DIRECT ASSESSMENT B-3 INTERNAL CORROSION DIRECT ASSESSMENT |
75 | NONMANDATORY APPENDIX C PREPARATION OF TECHNICAL INQUIRIES C-1 INTRODUCTION C-2 REQUIREMENTS C-3 SUBMITTAL |