Shopping Cart

No products in the cart.

ASME BPVC CC NC Supp 2 2013

$377.00

ASME BPVC CODE CASES: Nuclear Components- Supplement 02-2013

Published By Publication Date Number of Pages
ASME 2013 116
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

None

PDF Catalog

PDF Pages PDF Title
34 -1713.1-1 Interaction Curves for Elastic Buckling of Cylinders Under Combined Loads
64 -4310-1 Thermal Fusion Butt Joint
-4421.3-1 Tapered Transition Joint
65 -4421.3-1 Tapered Transition Joint (Cont’d)
66 -4520-1 Transition Flange Arrangement
5321-1 Polyethylene Pipe Butt Fusion Joint O.D. Bead (Cross Section View)
67 -3131-1(a) Long-Term Allowable Stress, S, for Polyethylene (psi)
-3131-1(b) Long-term Allowable Stress, S, for Polyethylene (MPa)
-3131-1(c) Elevated Temperature Allowable Stress, S, for Polyethylene (psi)
68 -3131-1(d) Elevated Temperature Allowable Stress, S, for Polyethylene (MPa)
-3210-1 Maximum Allowable Ring Deflection, Ωmax
-3210-2(a) Soil Support Factor, FS (in.)
-3210-2(b) Soil Support Factor, FS (mm)
69 -3210-3(a) Modulus of Elasticity of Polyethylene Pipe, Epipe (psi)
-3210-3(b) Modulus of Elasticity of Polyethylene Pipe, Epipe (MPa)
-3220(a) Allowable Side Wall Compression Stress, Scomp (psi)
-3220(b) Allowable Side Wall Compression Stress, Scomp (MPa)
70 -3221.2-1 Ovality Correction Factor, fo
-3223-1 Stress Indices, B1 and B2
-3223-2 Design and Service Level Longitudinal Stress Factors, K
-3223-3 Short Duration (< 5 min) Allowable Longitudinal Tensile Stress Values
-3311.2-1 Stress Intensification Factor, i
77 I-105 Horizontal Axis Position
78 I-121-1 Polyethylene Pipe Butt Fusion Joint 0.D. Bead (Cross-Section View)
79 I-131.2 Tensile Full Thickness Impact Test Coupon Configuration
80 I-131.7 Tensile Test Sample Evaluation Sample
I-133.1 Bend Specimen
I-221(b)-1 Minimum Melt Bead Size
81 I-131.4 Testing Speed
I-221(b)-1 Minimum Melt
I-221(b)-2 Maximum Heater Plate Removal Time for Pipe-to-Pipe Fusing
86 III-1 PE Standards and Specifications Referenced in Text
90 IV-121 Certification Requirements for Polyethylene Compound
91 IV-141.1 Minimum Quality Testing Requirements for Polyethylene Compound Lots
IV-141.2 Minimum Quality Testing Requirements for Natural Compound Lots
92 IV-141.3 Minimum Quality Testing Requirements for Pigment Concentrate Compound Lots
IV-142.1 Minimum Quality Testing Requirements for Polyethylene Source Material
93 IV-142(b) Minimum Quality Testing Requirements for Polyethylene Material — Pipe
95 A-110-1 Fusion Standards and Specifications Referenced in Text
98 B-1 Typical Time/Pressure Diagram of a Butt Fusion Joint
99 B-2 Correct Procedure
100 B-3 Incorrect Procedures
102 C-1 Fusion Bead Configuration
103 D-1 Standards and Specifications Referenced in Text
D-2 Seismic Strain Limits
104 E-1 Polyethylene Material Organization Responsibilities per NCA-3970
ASME BPVC CC NC Supp 2 2013
$377.00