ASME BPVC CC NC Supp 2 2013
$377.00
ASME BPVC CODE CASES: Nuclear Components- Supplement 02-2013
Published By | Publication Date | Number of Pages |
ASME | 2013 | 116 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
34 | -1713.1-1 Interaction Curves for Elastic Buckling of Cylinders Under Combined Loads |
64 | -4310-1 Thermal Fusion Butt Joint -4421.3-1 Tapered Transition Joint |
65 | -4421.3-1 Tapered Transition Joint (Cont’d) |
66 | -4520-1 Transition Flange Arrangement 5321-1 Polyethylene Pipe Butt Fusion Joint O.D. Bead (Cross Section View) |
67 | -3131-1(a) Long-Term Allowable Stress, S, for Polyethylene (psi) -3131-1(b) Long-term Allowable Stress, S, for Polyethylene (MPa) -3131-1(c) Elevated Temperature Allowable Stress, S, for Polyethylene (psi) |
68 | -3131-1(d) Elevated Temperature Allowable Stress, S, for Polyethylene (MPa) -3210-1 Maximum Allowable Ring Deflection, Ωmax -3210-2(a) Soil Support Factor, FS (in.) -3210-2(b) Soil Support Factor, FS (mm) |
69 | -3210-3(a) Modulus of Elasticity of Polyethylene Pipe, Epipe (psi) -3210-3(b) Modulus of Elasticity of Polyethylene Pipe, Epipe (MPa) -3220(a) Allowable Side Wall Compression Stress, Scomp (psi) -3220(b) Allowable Side Wall Compression Stress, Scomp (MPa) |
70 | -3221.2-1 Ovality Correction Factor, fo -3223-1 Stress Indices, B1 and B2 -3223-2 Design and Service Level Longitudinal Stress Factors, K -3223-3 Short Duration (< 5 min) Allowable Longitudinal Tensile Stress Values -3311.2-1 Stress Intensification Factor, i |
77 | I-105 Horizontal Axis Position |
78 | I-121-1 Polyethylene Pipe Butt Fusion Joint 0.D. Bead (Cross-Section View) |
79 | I-131.2 Tensile Full Thickness Impact Test Coupon Configuration |
80 | I-131.7 Tensile Test Sample Evaluation Sample I-133.1 Bend Specimen I-221(b)-1 Minimum Melt Bead Size |
81 | I-131.4 Testing Speed I-221(b)-1 Minimum Melt I-221(b)-2 Maximum Heater Plate Removal Time for Pipe-to-Pipe Fusing |
86 | III-1 PE Standards and Specifications Referenced in Text |
90 | IV-121 Certification Requirements for Polyethylene Compound |
91 | IV-141.1 Minimum Quality Testing Requirements for Polyethylene Compound Lots IV-141.2 Minimum Quality Testing Requirements for Natural Compound Lots |
92 | IV-141.3 Minimum Quality Testing Requirements for Pigment Concentrate Compound Lots IV-142.1 Minimum Quality Testing Requirements for Polyethylene Source Material |
93 | IV-142(b) Minimum Quality Testing Requirements for Polyethylene Material — Pipe |
95 | A-110-1 Fusion Standards and Specifications Referenced in Text |
98 | B-1 Typical Time/Pressure Diagram of a Butt Fusion Joint |
99 | B-2 Correct Procedure |
100 | B-3 Incorrect Procedures |
102 | C-1 Fusion Bead Configuration |
103 | D-1 Standards and Specifications Referenced in Text D-2 Seismic Strain Limits |
104 | E-1 Polyethylene Material Organization Responsibilities per NCA-3970 |