ASME BPVC III 1 NE 2017
$377.00
ASME BPVC – III – 1 – NE -2017 BPVC Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NE, Class MC Components
Published By | Publication Date | Number of Pages |
ASME | 2017 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
46 | NE-1110-1 Typical Containment Penetrations |
47 | NE-1131-1 Some Typical Jurisdictional Boundaries for Welded Connections Class MC Containment Vessels |
49 | NE-1132.2-1 Attachments in the Containment Vessel Support Load Path That Do Not Perform a Pressure-Retaining Function |
50 | NE-1132.2-2 Attachments That Do Not Perform a Pressure-Retaining Function and Are Not in the Containment Vessel Support Load Path (Nonstructural Attachments) |
51 | NE-1132.2-3 Attachments That Perform a Pressure-Retaining Function |
53 | NE-2121(a)-1 Material Specifications and Grades Permitted for Class MC Construction |
55 | NE-2121(a)-2 Permitted Bolting Material Specifications |
60 | NE-2311(a)-1 Exemptions From Impact Testing Under NE-2311(a)(8) |
61 | NE-2332.1-1 Required Cv Lateral Expansion Values for Pressure-Retaining Material Other Than Bolting |
62 | NE-2332.1-2 Required Cv Energy Values for Pressure-Retaining Material Other Than Bolting NE-2332.3(a)-1 Required Cv Values for Bolting Material Tested in Accordance With NE-2332.3(a) NE-2332.3(b)-1 Required Cv Values for Bolting Material Tested in Accordance With NE-2332.3(b) and NE-2333.2 |
63 | NE-2333.1-1 Required Cv Energy Values for Pressure-Retaining Material Other Than Bolting for the Overpressure Test |
65 | NE-2432.1-1 Sampling of Welding Materials for Chemical Analysis |
66 | NE-2432.2-1 Welding Material Chemical Analysis |
67 | NE-2433.1-1 Weld Metal Delta Ferrite Content |
72 | NE-2571-1 Required Examinations |
74 | NE-2575.2-1 Typical Pressure-Retaining Parts of Vessels |
86 | NE-3217-1 Classification of Stress Intensity in Vessels for Some Typical Cases |
88 | NE-3221-1 Summary of Stress Intensity Limits |
89 | NE-3221-1 Stress Categories and Limits of Stress Intensity for Design Conditions |
90 | NE-3221-2 Stress Categories and Limits of Stress Intensity for Level A and B Service Limits; and for Level C Service Limits Where the Structure Is Not Integral and Continuous |
91 | NE-3221-3 Stress Categories and Limits of Stress Intensity for Level C Service Limits Where the Structure Is Integral and Continuous; and for Level D Service Limits Where the Structure Is Not Integral and Continuous, and at Partial Penetration Welds |
92 | NE-3221-4 Stress Categories and Limits of Stress Intensity for Level D Service Limits Where the Structure Is Integral and Continuous |
99 | NE-3228.3(b)-1 Values of m, n, and Tmax for Various Classes of Permitted Materials |
101 | NE-3324.2-1 Principal Dimensions of Typical Heads NE-3324.2-1 Values of Factor K |
104 | NE-3324.8(b)-1 Values of Factor M |
105 | NE-3324.11(a)(6)-1 Large Head Openings: Reverse Curve and Conical Shell Reducer Sections |
106 | NE-3324.11(b)(2)-1 Values of Δ for Junctions at the Large Cylinder for α ≤ 30 deg NE-3324.11(b)(3)-1 Values of Δ for Junctions at the Small Cylinder for α ≤ 30 deg |
107 | NE-3325-1 Some Acceptable Types of Unstayed Flat Heads and Covers |
110 | NE-3326.1-1 Spherically Dished Covers With Bolting Flanges |
113 | NE-3332.2-1 Chart for Determining Values of F NE-3332.2-1 Values of Spherical Radius Factor K1 |
114 | NE-3334.2-1 Nozzle Dimensions |
116 | NE-3335.1-1 Arrangement of Multiple Openings |
117 | NE-3338.2-1 Direction of Stress Components NE-3338.2(c)-1 Stress Indices for Nozzles |
119 | NE-3351-1 Welded Joint Locations Typical of Categories A, B, C, and D NE-3352-1 Typical Butt Joints |
123 | NE-3358.1(a)-1 Heads Attached to Shells |
125 | NE-3361-1 Category A and B Joints Between Sections of Unequal Thickness |
131 | NE-4221.1-1 Maximum Difference in Cross‐Sectional Diameters NE-4221.2-1 Maximum Permissible Deviation e From a True Circular Form |
132 | NE-4221.2-2 Maximum Arc Length for Determining Plus or Minus Deviation |
133 | NE-4232-1 Maximum Allowable Offset in Final Welded Joints |
134 | NE-4243-1 Attachment of Pressure Parts to Plates to Form a Corner Joint |
135 | NE-4243-2 Acceptable Types of Full Penetration Weld Details for Category C Joints |
136 | NE-4243.1-1 Typical Flat Heads |
137 | NE-4244(a)-1 Nozzles Attached by Full Penetration Butt Welds |
138 | NE-4244(b)-1 Nozzles Attached by Full Penetration Corner Welds |
139 | NE-4244(c)-1 Deposited Weld Metal for Openings and Nozzles |
140 | NE-4244(d)-1 Acceptable Types of Welded Nozzles Using Partial Penetration Welds |
141 | NE-4244(d)-2 Partial Penetration Weld Connections |
142 | NE-4244(d)-3 Partial Penetration Weld Connections for Coaxial Cylinders NE-4244(e)-1 Acceptable Types of Fittings With Internal Threads |
143 | NE-4244(e)-2 Acceptable Types of Small Fittings |
144 | NE-4244(f)-1 Tube Connections |
150 | NE-4427-1 Fillet and Socket Weld Details and Dimensions |
151 | NE-4437(b)-1 Attachment of Stiffening Rings to Shell |
153 | NE-4622.1-1 Mandatory Requirements for Postweld Heat Treatment (PWHT) of Welds |
154 | NE-4622.4(c)-1 Alternative Holding Temperatures and Times |
155 | NE-4622.7(b)-1 Exemptions to Mandatory PWHT |
156 | NE-4730-1 Penetration Assembly |
158 | NE-4810(c)-1 Bellows Attachment Welds |
174 | NE-7734.2(a)-1 Values of F for Nonchoking Flow |