ASME BPVC III 1 NH 2013
$377.00
ASME BPVC – III – 1 – NH -2013 BPVC Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NH, Class 1 Components in Elevated Temperature Service
Published By | Publication Date | Number of Pages |
ASME | 2013 | 228 |
None
PDF Catalog
PDF Pages | PDF Title |
---|---|
44 | NH-3133-1 Size Restrictions on Connections |
51 | NH-3217-1 Classification of Stress Intensity in Vessels for Some Typical Cases |
53 | NH-3217-2 Classification of Stress Intensity in Piping, Typical Cases |
54 | NH-3221-1 Flow Diagram for Elevated Temperature Analysis |
56 | NH-3224-1 Use‐Fractions for Membrane Stress NH-3224-2 Use‐Fractions for Membrane Plus Bending Stress |
58 | NH-3225-1 Tensile Strength Values (Su) |
59 | NH-3225-2 Tensile and Yield Strength Reduction Factor Due to Long Time Prior Elevated Temperature Service NH-3225-3A Yield Strength Reduction Factors for 21/4Cr‐1Mo |
60 | NH-3225-3B Tensile Strength Reduction Factors for 21/4Cr‐1Mo |
61 | NH-3225-4 Tensile Strength Reduction Factors for 9Cr‐1Mo‐V |
65 | NH-3351-1 Welded Joint Locations Typical of Categories A, B, C, and D |
66 | NH-3352-1 Typical Butt Joints |
67 | NH-3354-1 Permissible Attachment Weld Location NH-3361-1 Category A and B Joints Between Sections of Unequal Thickness |
68 | NH-3410.2-1 Typical Single Volute Casing NH-3410.2-2 Typical Double Volute Casing |
69 | NH-3421.11-1 Minimum Tangential Inlet and Outlet Wall Thickness |
72 | NH-3642.1-1 Bend Radius Versus Thickness |
76 | NH-4212-1 Permissible Time/Temperature Conditions for Material Which Has Been Cold Worked > 5% and < 20% and Subjected to Short‐Time High Temperature Transients |
149 | NH-T-1432-1 Stress‐Strain Relationship |
224 | NH-U-1 Recommended Restrictions |