ASME P30.1 2019
$98.04
ASME P30.1-2019 Planning for Load Handling Activities
Published By | Publication Date | Number of Pages |
ASME | 2019 | 45 |
This standard establishes planning considerations and practices that apply to Load Handling Equipment (LHE), other associated equipment and activities when moving loads vertically or horizontally. The planning guidance contained in this standard is divided into two categories dependent upon the nature of the load handling activity and the degree of exposure to the issues that impact safety. The categories are designated as Standard Lift Plan and Critical Lift Plan. This standard does not preclude the user of this standard from creating subcategories based on their specific load handling activity considerations.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | CONTENTS |
6 | FOREWORD |
7 | ASME P30 COMMITTEE ROSTER |
8 | P30 STANDARD INTRODUCTION |
9 | ASME P30.1-2019 SUMMARY OF CHANGES |
10 | Chapter 1 Scope and Definitions 1-1 SCOPE 1-2 DEFINITIONS |
11 | Chapter 2 Load Handling Activity Considerations and Plan Categories 2-1 LOAD HANDLING ACTIVITY CONSIDERATIONS |
12 | Figures Figure 2-1-1 Load Handling Activity Categorization |
13 | 2-2 PLAN CATEGORIES 2-2.1 Standard Lift Plan 2-2.2 Critical Lift Plan |
14 | Chapter 3 Personnel and Responsibilities 3-1 PERSONNEL QUALIFICATION/COMPETENCE 3-2 ROLES AND RESPONSIBILITIES |
15 | Chapter 4 Standard Lift Plan 4-1 INTRODUCTION 4-2 STANDARD LIFT PLAN DEVELOPMENT 4-3 PRE-LIFT REVIEW 4-4 EXECUTING THE STANDARD LIFT PLAN 4-5 POST-LIFT REVIEW |
16 | Chapter 5 Critical Lift Plan 5-1 INTRODUCTION 5-2 CRITICAL LIFT PLAN DEVELOPMENT 5-2.1 The Load 5-2.2 Load Handling Equipment 5-2.3 Rigging Plan |
17 | 5-2.4 LHE and Load Travel Path 5-2.5 Personnel 5-2.6 Site, Services, and Ancillary Equipment 5-2.7 Communication System 5-2.8 Site Control 5-2.9 Contingency Considerations |
18 | 5-2.10 Emergency Action Plan 5-3 PRE-LIFT MEETING 5-4 EXECUTING THE CRITICAL LIFT PLAN 5-4.1 Preparation for the Load Handling Activity 5-4.2 Initiating the Load Handling Activity 5-4.3 During the Load Handling Activity 5-5 POST-LIFT REVIEW |
19 | NONMANDATORY APPENDIX A LIFT DATA SHEET (LDS) A-1 INTRODUCTION A-2 LIFT DATA SHEET INSTRUCTIONS AND COMMENTARY (FIGURE A-1-1) |
21 | A-3 CRANE LAYOUT (SCHEMATIC) (FIGURE A-3-1) A-4 RIGGING DIAGRAM (FIGURE A-4-1) A-5 PRE-LIFT SAFETY CHECKLIST |
23 | Figure A-1-1 Lift Data Sheet |
25 | Figure A-3-1 Crane Layout (Schematic) |
26 | Figure A-4-1 Rigging Arrangement (Schematic) |
27 | NONMANDATORY APPENDIX B RIGGING DATA SHEET (RDS) B-1 RIGGING DIAGRAM B-2 RIGGING DATA SHEET INSTRUCTIONS AND COMMENTARY |
29 | Figure B-1-1 Rigging Arrangement (Schematic) |
30 | Figure B-2.2-1 Rigging Data Sheet |
31 | NONMANDATORY APPENDIX C ESTABLISHING A LIMITING WIND SPEED C-1 INTRODUCTION C-2 RESPONSIBILITIES C-3 GUIDANCE FOR LIFT PLANNERS C-4 EFFECTS OF WIND FORCES ON THE LHE |
32 | C-5 EFFECTS OF WIND ON A LOAD C-6 EFFECTS THAT WIND FORCES ON HANDLED LOADS HAVE ON LHE C-7 CALCULATING WIND FORCES ON A LOAD TO BE HANDLED |
33 | C-8 LOAD CONTROL C-9 ESTABLISHING A LWS FOR A LHA |
34 | C-10 WIND VELOCITY — PLANNED AND MEASURED |
35 | C-11 LHE OUT‐OF‐SERVICE DISPOSITION C-12 ASSESSING WIND FORCES ON LHE — SEMIPERMANENT INSTALLATIONS |
36 | C-13 SECURING THE LOAD AFTER LANDING C-14 CONTINGENCY PLANNING C-15 PERSONNEL LIFTING |
37 | Figure C-4-1 Wind Effect on LHE Figure C-5-1 Effects of Wind on Load |
38 | Figure C-6-1 Side Loading |
39 | Figure C-8-1 Suspended Loads and Taglines |
40 | Figure C-9-1 Establishing a Limiting Wind Speed for a Load Handling Activity |
41 | NONMANDATORY APPENDIX D INDUSTRY REFERENCES |