ASME POM 102-2014 – Operating Walkdowns of Power Plants – Reapproved 2019
Published By | Publication Date | Number of Pages |
ASME | 2014 | 40 |
This Standard provides guidelines for operating equipment walkdowns that are designed to ultimately improve the thermal performance and efficiency of the power plant. Following these guidelines may also lead to more proactive maintenance practices, which can also be expected to improve the reliability of the plant.
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | CONTENTS |
6 | NOTICE |
7 | FOREWORD |
8 | ASME PTC COMMITTEE ROSTER |
9 | CORRESPONDENCE WITH THE PAP COMMITTEE |
10 | INTRODUCTION |
11 | 1 OBJECT AND SCOPE 1.1 Object 1.2 Scope 2 ACRONYMS 3 GUIDING PRINCIPLES 3.1 Safety Considerations 3.2 Pre-Walkdown Activities |
12 | 3.3 Walkdown Plan 3.4 Inspection-Walkdown Activities 3.5 Postinspection-Walkdown Activities 4 SPECIFIC EQUIPMENT CONSIDERATIONS 5 INSTRUMENTS AND METHODS OF MEASUREMENT 6 REPORT OF RESULTS |
13 | NONMANDATORY APPENDIX A GAS TURBINE INLET AIR CONDITIONING SYSTEMS A-1 PERFORMANCE CONSIDERATIONS A-2 EQUIPMENT WALKDOWN A-2.1 Evaporative Coolers A-2.2 Chillers A-2.3 Foggers |
14 | NONMANDATORY APPENDIX B GAS TURBINES B-1 PERFORMANCE CONSIDERATIONS B-2 EQUIPMENT WALKDOWN |
15 | NONMANDATORY APPENDIX C HEAT RECOVERY STEAM GENERATORS C-1 INTRODUCTION C-2 SAFETY CONSIDERATIONS C-3 DUCTWORK C-4 PRIOR TO INSPECTION C-5 DURING INSPECTION C-6 VISUAL INSPECTION |
17 | NONMANDATORY APPENDIX D WATER CHEMISTRY — SAMPLE PANEL D-1 PERFORMANCE CONSIDERATIONS D-2 EQUIPMENT WALKDOWN |
18 | NONMANDATORY APPENDIX E STEAM GENERATORS E-1 PREINSPECTION REVIEW E-2 SYNERGISTIC CONSIDERATIONS E-3 IMPACT OF FUELS ON PERFORMANCE |
19 | E-4 EFFECTS OF THE AIR HEATER E-5 OPERATIONAL CHECKS |
21 | NONMANDATORY APPENDIX F STEAM TURBINE AND GENERATOR F-1 INSPECTION OF ACCESSIBLE STEAM TURBINE-GENERATOR |
22 | NONMANDATORY APPENDIX G STEAM SURFACE CONDENSERS G-1 PRIOR TO INSPECTION G-2 INSPECTION-WALKDOWN |
23 | NONMANDATORY APPENDIX H AIR-COOLED STEAM CONDENSER H-1 INSPECTION-WALKDOWN |
24 | NONMANDATORY APPENDIX I COOLING TOWERS I-1 PREPLANNING I-2 PERFORMANCE CONSIDERATIONS I-3 EQUIPMENT WALKDOWN |
25 | NONMANDATORY APPENDIX J EMISSIONS CONTROL SYSTEMS J-1 INSPECTION |
26 | NONMANDATORY APPENDIX K PIPING SYSTEMS K-1 GENERAL INSPECTION |
27 | NONMANDATORY APPENDIX L FUEL DELIVERY SYSTEMS — SOLID FUELS L-1 INTRODUCTION L-2 TRUCK SCALES L-3 ELECTRONIC SCALING L-4 TRUCK DUMPS L-5 MAGNETIC SEPARATORS |
28 | L-6 METAL DETECTORS L-7 DISC SCREENS (SCALPERS) L-8 VIBRATING SCREENS |
29 | L-9 WOOD GRINDERS AND HOGS L-10 FUEL DIVERTER GATES L-11 CONVEYOR BELTING |
30 | L-12 CONVEYOR TRANSITIONS L-13 DRAG CHAIN CONVEYORS |
31 | L-14 INSTRUMENTATION L-15 SAFETY L-16 FIRE PROTECTION |
32 | NONMANDATORY APPENDIX M PLANT AUXILIARY SYSTEMS — PUMPS M-1 ROUTINE INSPECTION M-2 SAFETY M-3 PUMP DESCRIPTIONS M-4 NOISE M-5 PACKING AND SEALS M-6 LUBRICATION |
33 | M-7 BEARINGS M-8 OIL M-9 GREASE M-10 VIBRATION M-11 ROUTINE INSPECTION-WALKDOWN M-12 DISCERNIBLE CHANGES |
34 | M-13 REFERENCES |
35 | NONMANDATORY APPENDIX N SAFETY CONSIDERATIONS N-1 GENERAL CONSIDERATIONS N-2 EQUIPMENT-SPECIFIC CONSIDERATIONS N-2.1 Cooling Towers N-2.2 Heat Recovery Steam Generators N-2.3 Boiler Setting Air In-Leakage and Regenerative Rotary Air Heaters N-2.4 Boiler: Steam and Water Side |