Shopping Cart

No products in the cart.

ASME POM 102 2014 R2019

$98.04

ASME POM 102-2014 – Operating Walkdowns of Power Plants – Reapproved 2019

Published By Publication Date Number of Pages
ASME 2014 40
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This Standard provides guidelines for operating equipment walkdowns that are designed to ultimately improve the thermal performance and efficiency of the power plant. Following these guidelines may also lead to more proactive maintenance practices, which can also be expected to improve the reliability of the plant.

PDF Catalog

PDF Pages PDF Title
5 CONTENTS
6 NOTICE
7 FOREWORD
8 ASME PTC COMMITTEE ROSTER
9 CORRESPONDENCE WITH THE PAP COMMITTEE
10 INTRODUCTION
11 1 OBJECT AND SCOPE
1.1 Object
1.2 Scope
2 ACRONYMS
3 GUIDING PRINCIPLES
3.1 Safety Considerations
3.2 Pre-Walkdown Activities
12 3.3 Walkdown Plan
3.4 Inspection-Walkdown Activities
3.5 Postinspection-Walkdown Activities
4 SPECIFIC EQUIPMENT CONSIDERATIONS
5 INSTRUMENTS AND METHODS OF MEASUREMENT
6 REPORT OF RESULTS
13 NONMANDATORY APPENDIX A GAS TURBINE INLET AIR CONDITIONING SYSTEMS
A-1 PERFORMANCE CONSIDERATIONS
A-2 EQUIPMENT WALKDOWN
A-2.1 Evaporative Coolers
A-2.2 Chillers
A-2.3 Foggers
14 NONMANDATORY APPENDIX B GAS TURBINES
B-1 PERFORMANCE CONSIDERATIONS
B-2 EQUIPMENT WALKDOWN
15 NONMANDATORY APPENDIX C HEAT RECOVERY STEAM GENERATORS
C-1 INTRODUCTION
C-2 SAFETY CONSIDERATIONS
C-3 DUCTWORK
C-4 PRIOR TO INSPECTION
C-5 DURING INSPECTION
C-6 VISUAL INSPECTION
17 NONMANDATORY APPENDIX D WATER CHEMISTRY — SAMPLE PANEL
D-1 PERFORMANCE CONSIDERATIONS
D-2 EQUIPMENT WALKDOWN
18 NONMANDATORY APPENDIX E STEAM GENERATORS
E-1 PREINSPECTION REVIEW
E-2 SYNERGISTIC CONSIDERATIONS
E-3 IMPACT OF FUELS ON PERFORMANCE
19 E-4 EFFECTS OF THE AIR HEATER
E-5 OPERATIONAL CHECKS
21 NONMANDATORY APPENDIX F STEAM TURBINE AND GENERATOR
F-1 INSPECTION OF ACCESSIBLE STEAM TURBINE-GENERATOR
22 NONMANDATORY APPENDIX G STEAM SURFACE CONDENSERS
G-1 PRIOR TO INSPECTION
G-2 INSPECTION-WALKDOWN
23 NONMANDATORY APPENDIX H AIR-COOLED STEAM CONDENSER
H-1 INSPECTION-WALKDOWN
24 NONMANDATORY APPENDIX I COOLING TOWERS
I-1 PREPLANNING
I-2 PERFORMANCE CONSIDERATIONS
I-3 EQUIPMENT WALKDOWN
25 NONMANDATORY APPENDIX J EMISSIONS CONTROL SYSTEMS
J-1 INSPECTION
26 NONMANDATORY APPENDIX K PIPING SYSTEMS
K-1 GENERAL INSPECTION
27 NONMANDATORY APPENDIX L FUEL DELIVERY SYSTEMS — SOLID FUELS
L-1 INTRODUCTION
L-2 TRUCK SCALES
L-3 ELECTRONIC SCALING
L-4 TRUCK DUMPS
L-5 MAGNETIC SEPARATORS
28 L-6 METAL DETECTORS
L-7 DISC SCREENS (SCALPERS)
L-8 VIBRATING SCREENS
29 L-9 WOOD GRINDERS AND HOGS
L-10 FUEL DIVERTER GATES
L-11 CONVEYOR BELTING
30 L-12 CONVEYOR TRANSITIONS
L-13 DRAG CHAIN CONVEYORS
31 L-14 INSTRUMENTATION
L-15 SAFETY
L-16 FIRE PROTECTION
32 NONMANDATORY APPENDIX M PLANT AUXILIARY SYSTEMS — PUMPS
M-1 ROUTINE INSPECTION
M-2 SAFETY
M-3 PUMP DESCRIPTIONS
M-4 NOISE
M-5 PACKING AND SEALS
M-6 LUBRICATION
33 M-7 BEARINGS
M-8 OIL
M-9 GREASE
M-10 VIBRATION
M-11 ROUTINE INSPECTION-WALKDOWN
M-12 DISCERNIBLE CHANGES
34 M-13 REFERENCES
35 NONMANDATORY APPENDIX N SAFETY CONSIDERATIONS
N-1 GENERAL CONSIDERATIONS
N-2 EQUIPMENT-SPECIFIC CONSIDERATIONS
N-2.1 Cooling Towers
N-2.2 Heat Recovery Steam Generators
N-2.3 Boiler Setting Air In-Leakage and Regenerative Rotary Air Heaters
N-2.4 Boiler: Steam and Water Side
ASME POM 102 2014 R2019
$98.04