ASME PTB 11 2017 R2018
$98.04
ASME PTB11 Guide for ASME BPVC Section I Stamp Holders – Reaffirmed 2018
Published By | Publication Date | Number of Pages |
ASME | 2017 | 158 |
This guide is a comprehensive review of the European Pressure Equipment Directive (PED) and the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code, Section I. ASME has received requests from all over the world to provide guidance to manufacturers who have been or will be impacted by the PED. This documents provides that guidance. It also addresses the recent revisions of the PED in accordance with the European Union’s new legislative framework.
PDF Catalog
PDF Pages | PDF Title |
---|---|
4 | TABLE OF CONTENTS |
7 | FOREWORD |
8 | ABBREVIATIONS AND ACRONYMS |
10 | 1 INTRODUCTION |
11 | 2 THE EUROPEAN CONTEXT 2.1 Main Concepts of New Directives 2.2 Terms Used in European Directives |
12 | 3 PED OVERVIEW 3.1 Introduction 3.1.1 General 3.1.2 Intent 3.1.3 Manufacturers 3.1.4 Requirements |
13 | 3.2 General Concepts 3.2.1 Scope 3.2.2 Hazard Categories 3.2.3 Conformity Assessment Procedures |
14 | 3.2.4 Notified Body 3.2.5 CE Marking 3.2.6 Essential Safety Requirements 3.2.7 Material Specifications 3.2.8 Use of Non-Harmonized Standards 3.3 Structure of the PED |
16 | 4 SCOPE (PED Articles 1, 2, & 4) 4.1 Scope (PED Article 1-§1) 4.2 Types of Equipment Covered (PED Article 2 & Article 4) 4.3 PED Exclusions (PED Article 1-§2) |
17 | 5 CATEGORIES (PED Article 4, Article 13, Annex II) 5.1 Level of Hazards in Pressure Equipment 5.2 Equipment in level 0 – (PED Article 4-§3) |
18 | 5.3 Equipment in Categories I to IV (PED Article 4-§1) Figures Figure 5-1: Category for Vessel Containing a Dangerous Gas |
19 | 5.4 Vessels Not Subject to Fire or Heat (PED Article 4-§1(a)) 5.5 Vessels Subject to Fire or Heat (PED Article 4-§1(b)) 5.6 Piping (PED Article 4-§1(c)) 5.7 Safety Accessories (PED Article 4-§1(d), Annex ll-§2) |
20 | 5.8 Pressure Accessories (PED Article 4-§1(d), Annex ll-§3) 5.9 Summary |
21 | 6 CONFORMITY ASSESSMENT PROCEDURES (PED Article 14, Annex III) 6.1 Introduction 6.2 General Concept Figure 6-1: Relation of Conformity Assessment Procedures to Categories |
22 | Figure 6-2: Conformity Assessment Modules |
23 | Figure 6-3: PED Conformity Assessment Procedures |
24 | 6.3 Structure of the Procedures Figure 6-4: Conformity Assessment Procedure to be Applied in each Category |
25 | 6.4 Review of Conformity Assessment Modules 6.4.1 Conformity Assessment Modules 6.4.2 Module A: Internal Production Control |
26 | 6.4.3 Module A2: Internal Production Control plus Supervised Pressure Equipment Checks at Random Intervals |
27 | 6.4.4 Module B: EU Type Examination – Production Type |
28 | 6.4.5 Module B: EU Type Examination – Design Type 6.4.6 Module C2: Conformity to Type Based on Internal Production Control plus Supervised Pressure Equipment Checks at Random Intervals |
29 | 6.4.7 Module D: Conformity to Type Based on Quality Assurance of the Production Process 6.4.8 Module D1: Quality Assurance of the Production Process |
30 | 6.4.9 Module E: Conformity to Type Based on Pressure Equipment Quality Assurance 6.4.10 Module E1: Quality Assurance of Final Pressure Equipment Inspection and Testing |
31 | 6.4.11 Module F: Conformity to Type Based on Pressure Equipment Verification 6.4.12 Module G: Conformity Based on Unit Verification |
32 | 6.4.13 Module H: Conformity Based on Full Quality Assurance |
33 | 6.4.14 Module H1: Conformity Based on Full Quality Assurance Plus Design Examination 6.5 Summary of Activities of Manufacturers and Notified Bodies |
34 | 7 ESSENTIAL SAFETY REQUIREMENTS (PED Articles 4 & 6, Annex I) 7.1 Introduction 7.2 General Discussion of ESR (PED Annex I) 7.2.1 Preliminary Remarks |
35 | Figure 7-1: General Membrane Stress Values |
36 | Figure 7-2: Joint Efficiency Values |
37 | Figure 7-3: Welding Procedure Qualifications and Welder Qualifications Figure 7-4: Non-Destructive Testing |
38 | Figure 7-5: Proof Test, Test Pressure Formula |
39 | Figure 7-6: Particular Material Appraisals |
40 | 7.3 Hazard Analysis (PED Annex I) Figure 7-7: Type of Inspection Document |
41 | 7.3.1 Identify the Hazard Due to Pressure 7.3.2 Evaluation 7.3.3 Reduction of Risks 7.3.4 Informing Users 7.3.5 Documentation |
42 | 8 MATERIALS (PED Annex I, Section 4) 8.1 General 8.2 Materials that Comply with Harmonized Materials Standards 8.3 European Approval of Pressure Equipment Materials (PED Article 15) 8.3.1 General |
43 | 8.3.2 General Requirements for Obtaining European Approval Materials |
44 | 8.4 Particular Material Appraisal (PED Annex I-§4.2c) 8.5 Material Certificates (PED Annex I-§4.3) 8.6 Material Manufacturers |
45 | 9 NOTIFIED BODIES (PED Article 24) |
46 | 10 CE MARKING (PED Article 18, Article 19) |
47 | 11 SPECIFIC ISSUES 11.1 Assemblies (PED Article 6, Article 12) 11.2 User Inspectorates (PED Article 25) |
48 | 11.3 Specific Cases 11.4 Manufacturer’s Responsibility |
49 | 11.5 Operating Instructions |
50 | 12 COMPARISON OF ASME AND PED REQUIREMENTS Figure 12-1: Comparison of BPVC Section I Requirements with PED 2014/68/EU, Annex I |
81 | 12.1 Notes in Fig. 12-1 of this Guide on BPVC Section I Requirements |
83 | 12.2 Additional Notes in Fig. 12-1 of this Guide on Considerations for Annex I ESRs |
91 | 12.3 Quantitative Requirements in PED Annex I to be applied as a General Rule Figure 12-2: Q1 Safety Factors for Allowable Stresses Given in Annex I, §7.1.2 Figure 12-3: Q2 Joint Efficiencies Given in Annex I, §7.2 Figure 12-4: Q3 Formula for Calculating Hydrostatic Test Pressure Given in Annex I, §7.4 |
92 | 13 ADDITIONAL CONSIDERATIONS Figure 13-1: Additional Considerations for Application of BPVC Section I, Power Boilerswithin the Scope of PED 2014/68/EU, Annex I |
120 | 14 GUIDELINES RELATED TO PED 2014/68/EU 14.1 Purpose of the Guidelines 14.2 Status of the Guidelines 14.3 Classification of the Guidelines 14.4 Inquiries |
121 | REFERENCES |
129 | Figure C-1: Flowchart for Pressure Equipment Directive (2014/68/EU) |
133 | Figure E-1: Vessels Containing Group 1 Gas |
134 | Figure E-2: Vessels Containing Group 2 Gas |
135 | Figure E-3: Vessels Containing Group 1 Liquid |
136 | Figure E-4: Vessels Containing Group 2 Liquid |
137 | Figure E-5: Boilers |
138 | Figure E-6: Piping Containing a Group 1 Gas |
139 | Figure E-7: Piping Containing a Group 2 Gas |
140 | Figure E-8: Piping Containing Group 1 Liquid |
141 | Figure E-9: Piping Containing Group 2 Liquid |