ASME RA S 1.1 2024
$75.42
ANS/ASME RA-S-1.1-2024 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications
Published By | Publication Date | Number of Pages |
ASME | 2024 | 401 |
This nuclear standard states requirements for a Level 1 Probabilistic Risk Assessment (PRA) of internal and external hazards while at-power for the evaluation of core damage frequency (CDF). In addition, this standard states requirements for a limited Level 2 PRA sufficient to evaluate large early release frequency (LERF). The only hazards explicitly excluded from the scope are accidents resulting from purposeful human-induced security threats (e.g., sabotage, terrorism). These requirements are written for operating light water reactor (LWR) nuclear power plants. This standard may be used for LWR plants under design or construction or for advanced LWRs, such as small modular reactors (SMR), but revised or additional requirements may be needed.
PDF Catalog
PDF Pages | PDF Title |
---|---|
3 | Contents |
5 | Foreword |
7 | Correspondence with the ASME/ANS Joint Committee on Nuclear Risk Management |
9 | Acknowledgments |
11 | ASME/ANS RA-S Committee |
13 | Part 1. General Requirements for a Level 1 PRA, Including Large Early Release Frequency Section 1-1 Introduction |
21 | Section 1-2 Acronyms and Definitions |
33 | Section 1-3 PRA Scope and Capabilities in Support of Risk-Informed Applications |
34 | Section 1-4 Requirements for Use of Expert Judgment |
35 | Section 1-5 PRA Configuration Control Program |
38 | Section 1-6 Peer Review |
41 | Section 1-7 Newly Developed Methods |
44 | Section 1-8 References |
45 | Nonmandatory Appendix 1-A Meanings of Action Verbs |
50 | Part 2. Requirements for Internal-Events At-Power PRA Section 2-1 Overview of Internal-Events At-Power PRA Requirements |
51 | Section 2-2 Internal-Events PRA Technical Elements and Requirements |
100 | Nonmandatory Appendix 2-A Explanatory Notes Regarding Application of the Part 2 Supporting Requirements |
122 | Part 3. Requirements for Internal Flood At-Power PRA Section 3-1 Overview of Internal Flood At-Power PRA Requirements |
123 | Section 3-2 Internal Flood PRA Technical Elements and Requirements |
147 | Nonmandatory Appendix 3-A Internal Flood At-Power PRA: Commentary |
167 | Part 4. Requirements for Internal Fires At-Power PRA Section 4-1 Risk Assessment Technical Requirements for Internal Fires At-Power |
168 | Section 4-2 Internal Fire PRA Technical Elements and Requirements |
198 | Nonmandatory Appendix 4-A Notes and Explanatory Material |
216 | Part 5. Requirements for Seismic Events for At-Power PRA Section 5-1 Overview of Seismic PRA Requirements At-Power |
217 | Section 5-2 Seismic At-Power Technical Elements and Requirements |
232 | Nonmandatory Appendix 5-A Seismic Probabilistic Risk Assessment Commentary |
262 | Part 6. Requirements for Screening and Conservative Analysis of Hazards for At-Power PRA Section 6-1 Overview of Screening and Conservative Analysis Requirements |
263 | Section 6-2 Screening and Conservative Analysis Technical Requirements |
267 | Nonmandatory Appendix 6-A Screening Commentary |
271 | 6-B List of Hazards for Consideration |
274 | Part 7. Requirements for High Wind At-Power PRA Section 7-1 Overview of High Wind At-Power PRA Requirements |
275 | Section 7-2 High Wind At-Power PRA Technical Elements and Requirements |
289 | Nonmandatory Appendix 7-A High Wind Notes and Commentary |
328 | Part 8. Requirements for External Flood At-Power PRA Section 8-1 Overview of External Flood At-Power PRA Requirements |
329 | Section 8-2 External Flood At-Power PRA Technical Elements and Requirements |
346 | Nonmandatory Appendix 8-A External Flood Probabilistic Risk Assessment Commentary |
384 | Part 9. Requirements for Other Hazards At-Power PRA Section 9-1 Overview of Other Hazards At-Power PRA Requirements |
385 | Section 9-2 Other Hazards At-Power PRA Technical Elements and Requirements |
393 | Nonmandatory Appendix 9-A Other Hazards Commentary |