ASME TDP-1-2023 Prevention of Water Damage to Steam Turbines Used for Electric Power Generation: Fossil-Fueled Plants

Published By Publication Date Number of Pages
ASME 2023 45
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weā€™re here to assist you 24/7.
Email:[email protected]

This Standard includes required and recommended practices concerned primarily with the prevention of water damage to steam turbines used for fossil-fuelfired electric power generation.

PDF Catalog

PDF Pages PDF Title
4 CONTENTS
5 FOREWORD
6 ASME TWDP COMMITTEE ROSTER
7 CORRESPONDENCE WITH THE TWDP COMMITTEE
10 1 SCOPE
2 CRITERIA
2.1 Basis
11 2.2 Definitions
13 2.3 Symbol Legend
2.4 Device Identification Letters
2.5 References
Tables
Table 2.3-1 Symbol Legend
14 3 DESIGN
3.1 Steam Generators
Table 2.4-1 Device Identification
15 Figures
Figure 3.1.2-1 Typical Flash Tank/Separators Arrangement: Local Control System
16 Figure 3.1.2-2 Typical Flash Tank/Separators Arrangement: ICS
17 Figure 3.1.2-3 Typical Leveling System Arrangement: ICS
18 3.2 Steam Attemperators
19 Figure 3.2.5-1 Typical Attemperator System
20 3.3 Motive Steam Systems
21 Figure 3.3.3-1 Typical Drain System With Redundant Level Elements
22 Figure 3.3.3-2 Typical Drain System With Redundant Thermocouples
23 3.4 Process Steam Lines
3.5 Closed Feedwater Heaters and Extraction Systems
24 Figure 3.5.1-1 Typical Heater Steam-Side Isolation System: Local Control System
25 Figure 3.5.1-2 Typical Heater Steam-Side Isolation System: ICS
26 Figure 3.5.1-3 Typical Heater Tube-Side Isolation System: Local Control System
27 Figure 3.5.1-4 Typical Heater Tube-Side Isolation System: ICS
29 3.6 Direct Contact Feedwater Heaters and Extraction Systems
30 Figure 3.6.1-1 Typical Deaerator Arrangement With Drain System: Local Control System
31 Figure 3.6.1-2 Typical Deaerator Arrangement With Drain System: ICS
32 Figure 3.6.1-3 Typical Deaerator Arrangement With Inlet Isolation: Local Control System
33 Figure 3.6.1-4 Typical Deaerator Arrangement With Inlet Isolation: ICS
34 3.7 Drain Systems: Turbine and Cycle Steam Piping
36 3.8 Condenser Steam and Water Dumps
37 3.9 Turbine Steam Seal Systems
38 3.10 Control Systems and Instrumentation
Figure 3.9.1-1 Main Turbine: Typical Steam Seal Arrangement
39 4 OPERATION
40 4.1 Motive Steam
4.2 Main Steam Turbine
41 4.3 Turbine Steam Seal System
4.4 Attemperators
4.5 Feedwater Heaters, Extraction Systems, and Process Steam Extractions
5 TESTING, INSPECTION, MAINTENANCE, AND MONITORING
5.1 Quarterly Testing and Inspection
42 5.2 Inspection and Maintenance During Planned Unit Outages
5.3 Monitoring
6 CONCLUSION
ASME TDP 1 2023