ASME Y14.35 2014
$98.04
ASME Y14.35 Revision of Engineering Drawings and Associated Documents
Published By | Publication Date | Number of Pages |
ASME | 2014 | 28 |
This Standard defines the practices for revising drawings and associated documents and establishes methods for identification and recording revisions. The revision practices of this Standard apply to any form of original drawing and associated documents.
PDF Catalog
PDF Pages | PDF Title |
---|---|
5 | CONTENTS |
6 | FOREWORD |
7 | COMMITTEE ROSTER |
8 | CORRESPONDENCE WITH THE Y14 COMMITTEE |
9 | 1 GENERAL 1.1 Scope 1.2 ASME Y14 Series Conventions 1.2.1 Mandatory, Recommended, Guidance, and Optional Words 1.2.2 Cross-Reference of Standards. 1.2.3 Invocation of Referenced Standards. 1.2.4 Parentheses Following a Definition. 1.2.5 Notes. |
10 | 1.2.6 Acronyms and Abbreviations. 1.2.7 Units. 1.2.8 Figures. 1.2.9 Precedence of Standards. 1.2.10 Unless Otherwise Specified UOS. 2 REFERENCES |
11 | 3 DEFINITIONS 3.1 Approval 3.1.1 Approval Indicator 3.2 Associated Documents 3.3 Canceled Drawing 3.4 Change 3.5 Data Set See 3.19 Product Definition Data Set 3.6 Commercial and Government Entity CAGE Code 3.7 Data Processing System 3.8 Design Activity 3.8.1 Design Activity — Current 3.8.2 Design Activity — Original 3.9 Design Activity Identification DAI |
12 | 3.10 Digital Data 3.11 Document 3.12 Drawing 3.13 Field of Drawing 3.14 Fit 3.15 Form 3.16 Function 3.17 Obsolete 3.18 Original 3.19 Product Definition Data Set 3.20 Revision 3.21 Revision Authorization Document RAD 3.22 Revision History Block 3.23 Revision Letter |
13 | 3.24 Superseded 3.25 Total Number of Sheets 3.26 Acronyms 3.27 Abbreviations 4 DRAWING PRACTICES 4.1 Revision Methods 4.1.1 Deleting. 4.1.2 Crossing Out. |
14 | 4.2 Dimensional Changes 4.3 Redrawn Drawings 4.3.1 Redrawn Drawing With Change. 4.3.2 Redrawn Drawing Without Change. 4.3.3 Historical Annotations. 4.4 Superseding a Drawing 4.4.1 Superseding New Drawing. 4.4.2 Superseded Old Drawing. 4.4.3 Supersession of Digital Data. 4.5 Revisions of Digital Data |
15 | Figures Fig. 4-1 Notations for a Redrawn Drawing |
16 | 4.6 System Administrator Initiated Changes to Digital Data Fig. 4-2 Notations for a Superseding Drawing Fig. 4-3 Notations for a Superseded Drawing |
17 | 4.7 Design Activity Authority 5 IDENTIFYING INITIAL RELEASE AND REVISIONS ON DRAWINGS 5.1 Initial Release 5.2 Revision Letters |
18 | 5.3 Identifying Revision Locations 5.4 Multiple Changes 5.4.1 Sequence Number Use. Fig. 5-1 Canceling an ARAD |
19 | Fig. 5-2 Replacing an ARAD Fig. 5-3 Sequence Number |
20 | 5.5 Revision Symbol 5.5.1 Symbol Application. 5.5.2 Omitting Symbols. 6 RECORDING REVISIONS 6.1 Revision History Block Entries 6.1.1 ZONE Column. 6.1.2 REV Column. 6.1.3 DESCRIPTION Column. Fig. 5-4 Revision Symbol |
21 | Fig. 6-1 Zone and Revision Columns |
22 | 6.1.4 DATE Column. 6.1.5 APPROVED Column. 6.1.6 Separating Revisions. 6.1.7 Revision Description for Digital Data. Fig. 6-2 Description Column |
23 | 6.2 Transfer of Drawings Between Design Activities 7 REVISION CONTROL METHODS 7.1 Drawing Level Method 7.1.1 Revision Letters 7.1.2 Revision History Block 7.2 Sheet Level Method 7.2.1 Revision Letters 7.2.2 Revision History Block 7.3 All Sheets Same Revision Level Method 7.3.1 Revision Letters |
24 | 7.3.2 Revision History Block 7.4 Revision Status of Sheets 7.4.1 Revision Status of Sheets Block. Fig. 7-1 Examples of Revision Status of Sheets Block |
25 | 7.4.2 Revision Status of Sheets Block Entries. 7.5 Adding or Deleting Sheets 7.5.1 Adding Sheets. 7.5.2 Deleting Sheets. 7.6 Sheet or Drawing Cancellation 7.7 Drawing Reinstatement |
26 | 8 ASSOCIATED DOCUMENT REVISIONS Fig. 7-2 Drawing Sheet Reinstatement |