ASTM-E1946:2018 Edition(Redline)

$36.83

E1946-18 Standard Practice for Measuring Cost Risk of Buildings and Building Systems and Other Constructed Projects (Redline)

Published By Publication Date Number of Pages
ASTM 2018 12
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

ASTM E1946-18

Redline Standard: Standard Practice for Measuring Cost Risk of Buildings and Building Systems and Other Constructed Projects

ASTM E1946

Scope

1.1 This practice covers a procedure for measuring cost risk for buildings and building systems and other constructed projects, using the Monte Carlo simulation technique as described in Guide E1369.

1.2 A computer program is required for the Monte Carlo simulation. This can be one of the commercially available software programs for cost risk analysis, or one constructed by the user.

1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.

1.4 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

Keywords

cost model; cost risk analysis; Monte Carlo simulation; sensitivity analysis; UNIFORMAT II;

ICS Code

ICS Number Code 91.010.20 (Contractual aspects)

DOI: 10.1520/E1946-18