Shopping Cart

No products in the cart.

AWWA C215 2022

$76.92

AWWA C215-22 Extruded Polyolefin Coatings for Steel Pipe

Published By Publication Date Number of Pages
AWWA 2022 32
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

The purpose of this standard is to provide purchasers, manufacturers, and constructors with the minimum requirements for extruded polyole?n coatings for steel water pipe, including material, application, inspection, testing, marking, handling, and packaging requirements.

PDF Catalog

PDF Pages PDF Title
7 Foreword
I. Introduction.
I.A. Background. Extruded polyolefin pipe-coating systems were first applied on steel pipe in 1956 using a crosshead-die extrusion system. In 1965, side extrusion was introduced in Europe and became available in the United States in 1972.
I.B. History. The first edition of ANSI/AWWA C215 was approved by the AWWA Board of Directors on June 19, 1988, and had an effective date of Jan. 1, 1989. The second edition of ANSI/AWWA C215 was approved on Jan. 30, 1994, and had an effective date of Nov.
II. Special Issues. ANSI/AWWA C215 is intended to govern the exterior coating of steel water pipelines for underground or underwater installation under normal conditions. It is based on current experience, but it is not intended for unqualified use under a
III. Use of This Standard. It is the responsibility of the user of an AWWA standard to determine that the products described in that standard are suitable for use in the particular application being considered.
III.A. Purchaser Options and Alternatives. The following items should be provided by the purchaser:
8 IV. Major Revisions. The major revisions made to the standard in this edition include the following:
9 V. Comments. If you have any comments or questions about this standard, please call AWWA Engineering and Technical Services at 303.794.7711; FAX at 303.795.7603; write to the department at 6666 West Quincy Avenue, Denver, CO 80235-3098; or email at standa
11 Sec. 1.1 Scope
12 Sec. 1.2 Purpose
Sec. 1.3 Application
SECTION 2: REFERENCES
14 SECTION 3: DEFINITIONS
SECTION 4: REQUIREMENTS
Sec. 4.1 Equipment
15 Sec. 4.2 Materials and Workmanship
Sec. 4.3 Coating System
16 Sec. 4.4 Surface Preparation
17 Sec. 4.5 Coating Application
19 Sec. 4.6 Coating Fittings and Specials
20 Sec. 4.7 Coating Repair
Sec. 4.8 Field Joints – Welded and Non-Welded
21 Sec. 4.9 Field Procedures
SECTION 5: VERIFICATION
Sec. 5.1 Coating Materials Prequalification
Sec 5.2 Requirements of Coating System
25 Sec. 5.3 Quality Assurance and Records
Sec. 5.4 Inspection and Testing by the Purchaser
Sec. 5.5 Quality-Control Requirements of Applied Coating Systems (Types A, B, and C)
27 Sec. 5.6 Rejection
SECTION 6: DELIVERY
Sec. 6.1 Marking
28 Sec. 6.2 Packaging and Shipping
Sec. 6.3 Affidavit of Compliance
AWWA C215 2022
$76.92