Shopping Cart

No products in the cart.

BICSI EDCP 2024 2nded

$40.63

Essentials of Data Center Projects, 2nd Edition

Published By Publication Date Number of Pages
BICSI 2024 286
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

Data centers continue to evolve, and the edge is being pushed on how large or small a data center can be built. While a data center

PDF Catalog

PDF Pages PDF Title
1 EDCP 2nd
2 Preface
5 WARNING
6 Acknowledgments
8 Reader’s Comment Form
10 Acronyms and Abbreviations
16 Table of Contents
17 Figures
19 Tables
20 Chapter 1 – Data Centers
22 Table of Contents
24 Figures
Tables
26 Data Centers
Introduction
29 Common Metrics Used within Data Center Projects
Power Usage Effectiveness (PUE)
Data Center Infrastructure Efficiency (DCiE)
Uptime
Availability
30 Reliability
31 Return on Investment (ROI)
Total Cost of Ownership (TCO)
32 Net Present Value (NPV)
33 Creating Data Centers
Overview
34 Risk Analysis
35 Redundancy
Data Center Facility Availability Classes
36 Availability Class 0
37 Availability Class 1
Availability Class 2
38 Availability Class 3
Availability Class 4
39 Availability Class Sub Groups
Summary
43 Determining the Data Center Availability Class
44 Identify Operational Requirements
45 Quantify and Rank Operational Availability Requirements
46 Determine Impact of Downtime
47 Identify the Data Center Availability Class
48 Multiple Data Centers
Introduction
50 Multiple Data Center Conceptual Examples
High Availability In-House Multi-Data Center Architecture
51 Private Cloud Multi-Data Center Architecture – Class 3 Solution/Three Class 2 Facilities
52 Private Cloud Multi-Data Center Architecture – Class 4 Solution/Four Class 2 Facilities
53 Edge Data Centers
Introduction
Types
54 Benefits and Limitations of EDCs
Benefits
Limitations
55 Modular Data Centers (MDC)
56 Data Center Services Outsourcing
Introduction
57 Outsourcing Models
58 Data Center Services Outsourcing Model Comparison
59 Public Cloud Services
Virtual Redundancy Level
60 Redundant Availability Zone Level
Redundant Cloud Region Level
Redundant Cloud Provider Level
61 Outsourcing Model Decision Tree
64 Chapter 2 – Project Planning
66 Table of Contents
69 Figures
70 Project Planning
Introduction
71 Developing a Project Plan
Lessons Learned
72 Request for Proposals
Overview
Understanding the Request for Proposal
74 Submission and Evaluation of the Response to the Request for Proposal
75 Scope of Work
76 Basic Requirements
Contractual/Administrative Requirements
77 Basic Planning and Needs Assessment
79 Outlining the Scope of Work Process
80 Writing and Reviewing
Description of Format
81 End Result Deliverable
82 Language and Expression
83 Referencing Codes and Standards
84 Design Planning
Overview
Traditional Design Process
85 Data Center Design Process
86 Design Team Members
87 Design Phases
Schematic Design
88 Design Development
89 Construction Document
90 Elements of Design
Specifications
Drawings
91 Cost Estimates
92 Technology Design
Needs Assessment
Design Analysis
Acquisition
Implementation
93 Critical Design Tasks
97 Developing a Quality Plan
98 Quality Benchmarking
99 Operations and Business Continuity Factors
Overview
Energy Regulatory Trends
European Union
100 Efficiency and Productivity Indicators
101 Existing Facility Assessment
102 Reporting
Security
Security Development Theory
104 Security Assessment Process
109 Design Approach
112 Network Vulnerability Assessment
115 Governance
Public Governance
116 Private Governance
Voluntary Governance
Documentation
117 Documentation
Disaster Recovery Plan
Establish A Team
120 DRP Planning Methods
121 Plan Benefits
Types of Plans
122 Implementation
123 Colocation Technical Planning
Overview
124 Floor Plan
Ceiling Height
125 Movement of Equipment
Floor Loading
126 Cabinets
127 Point-of-Presence Rooms
128 Cabling Between Point-of-Presence Rooms
129 Cabling within Cages/Suites
130 Power Within Computer Rooms
132 Work Rules and Procedures
133 Planning for the Edge Data Center (EDC) Facility
General Considerations
Location
Space Planning
Class Rating and Reliability
Codes and Standards
134 Edge Data Center Power
135 Power Systems Space Planning
136 Generator power
137 Cooling Edge Data Centers
Communication Cabling
138 Security, Fire Protection and Building Automation
140 Chapter 3 – Project Implementation
142 Table of Contents
143 Figure
144 Pre-Construction
Project Bidding and Negotiating
Types of Bid Structures
145 Types of Bids
146 Awarding of Bids
Types of Contracts
147 Contract Payment Methodologies
Notice to Proceed
148 Construction Administration
Organizing the Project Team
Construction Team Members
149 Developing a Communications Plan
150 Pre-Construction Meetings
151 Forms
152 Request for Information
153 Submittals
154 Tracking and Managing the Plan
Change Control System
156 Vendor and Contractor Coordination
157 Project Installation and Implementation
Pre-Construction Site Survey
159 Retrofit Additional Survey Tasks
Risk Management Plan
160 Safety Plan
161 Meetings
Initial Construction Meeting
Pre-installation Meeting
162 Progress Meetings
163 Materials and Logistics
Ordering Materials
Receiving Materials
164 Storing Materials
165 Distributing Materials on Site
166 Managing the Project Schedule
167 Commissioning
Overview
Recommendations
168 Phases of the Commissioning Process
Program Phase
169 Design Phase
Construction Phase
Acceptance Phase
170 Post-acceptance Phase
Types of Commissioning
New Building
171 Existing Building
Commissioning Testing
Functional Testing Components
Functional Testing Procedures
172 Test Plan and Documentation
Testing Equipment
System Testing
174 Acceptance Testing
Retesting Equipment and Systems
175 Validation
176 Commissioning Documents
Design Documents
Process Documents
Verification Documents
177 Final Commissioning Report
178 Project Closeout
Overview
179 Post-construction
180 Post-construction/Post-installation Considerations and Tasks
182 Chapter 4 – Project Management Essentials
184 Table of Contents
185 Figures
Tables
186 Project Management: An Overview
Introduction
187 Project
Project Objectives
188 Project Stakeholders
189 Project Team Members
Role of Project Managers
190 Technical Expertise
Project Management Steps
191 Project Management Knowledge Areas
Human Resources Management
Scope Management
Integration Management
Time Management
192 Cost Management
Quality Management
Communications Management
Risk Management
Stakeholder Management
Procurement Management
193 Project Management Tools
Developing an Organization Breakdown Structure
194 Building a Work Breakdown Structure
198 Developing a Schedule Using PERT, Milestone, Gantt, and Calendar Charts
203 Developing Estimates
204 Using the Budget to Determine Project Performance
217 Stakeholder Relations and Management
Overview
218 Interpersonal Skills and Communication
Effective Communication Skills
220 Customer Relations
Customer Perception
221 Feedback and Follow-Through
Professional Appearance
222 Stakeholder Management
224 Chapter 5 – Project Documentation
226 Table of Contents
227 Figure
228 Project Documentation
Introduction
229 Project Drawings
232 The U.S. National Computer-Aided Design Standard®
Components of the National Computer-Aided Design Standard
233 Adoption of the National Computer-Aided Design Standard
234 Expanded Listing of Components of the National Computer-Aided Design Standard
235 Hierarchy of Data Fields
237 Symbol Types
Construction Specifications
239 Types of Project Documentation
Overview
Project Log
240 Maintaining the Project Log
241 Quality Assurance Plan
Project Safety Plan
Request for Information Log
242 Submittals
Change Orders
243 Acceptance Plan
Commissioning Plan
Punch List Log
244 Closeout Submittals
As-Built Drawings
245 Network Traffic Studies
Warranty and License Documentation
Test Documentation
246 Operations and Maintenance Documentation
Patching Matrix
Photographs
248 Chapter 6 – Risk Management
250 Table of Contents
251 Figures
Tables
252 Risk Management
Introduction
253 Risk Management Objectives
254 Client Involvement
Accuracy
Accountability
Management Support
255 Early Warning Indicators in Risk Management
Risk Management Review Cycle
Risk Versus Liability
Culture
256 Continued Improvement
Risk Evaluation
257 Risk Identification
259 Risk Analysis
262 Risk Mitigation
264 Corrective Actions
265 Risk Control
Risk Checklist
270 Glossary
272 Glossary Terms
A
273 B
274 C
276 D
277 E
F
278 G
I
L
279 M
N
O
280 P
281 Q
R
283 S
284 T
285 U
V
W
286 X
BICSI EDCP 2024 2nded
$40.63