BICSI EDCP 2024 2nded
$40.63
Essentials of Data Center Projects, 2nd Edition
Published By | Publication Date | Number of Pages |
BICSI | 2024 | 286 |
Data centers continue to evolve, and the edge is being pushed on how large or small a data center can be built. While a data center
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | EDCP 2nd |
2 | Preface |
5 | WARNING |
6 | Acknowledgments |
8 | Reader’s Comment Form |
10 | Acronyms and Abbreviations |
16 | Table of Contents |
17 | Figures |
19 | Tables |
20 | Chapter 1 – Data Centers |
22 | Table of Contents |
24 | Figures Tables |
26 | Data Centers Introduction |
29 | Common Metrics Used within Data Center Projects Power Usage Effectiveness (PUE) Data Center Infrastructure Efficiency (DCiE) Uptime Availability |
30 | Reliability |
31 | Return on Investment (ROI) Total Cost of Ownership (TCO) |
32 | Net Present Value (NPV) |
33 | Creating Data Centers Overview |
34 | Risk Analysis |
35 | Redundancy Data Center Facility Availability Classes |
36 | Availability Class 0 |
37 | Availability Class 1 Availability Class 2 |
38 | Availability Class 3 Availability Class 4 |
39 | Availability Class Sub Groups Summary |
43 | Determining the Data Center Availability Class |
44 | Identify Operational Requirements |
45 | Quantify and Rank Operational Availability Requirements |
46 | Determine Impact of Downtime |
47 | Identify the Data Center Availability Class |
48 | Multiple Data Centers Introduction |
50 | Multiple Data Center Conceptual Examples High Availability In-House Multi-Data Center Architecture |
51 | Private Cloud Multi-Data Center Architecture – Class 3 Solution/Three Class 2 Facilities |
52 | Private Cloud Multi-Data Center Architecture – Class 4 Solution/Four Class 2 Facilities |
53 | Edge Data Centers Introduction Types |
54 | Benefits and Limitations of EDCs Benefits Limitations |
55 | Modular Data Centers (MDC) |
56 | Data Center Services Outsourcing Introduction |
57 | Outsourcing Models |
58 | Data Center Services Outsourcing Model Comparison |
59 | Public Cloud Services Virtual Redundancy Level |
60 | Redundant Availability Zone Level Redundant Cloud Region Level Redundant Cloud Provider Level |
61 | Outsourcing Model Decision Tree |
64 | Chapter 2 – Project Planning |
66 | Table of Contents |
69 | Figures |
70 | Project Planning Introduction |
71 | Developing a Project Plan Lessons Learned |
72 | Request for Proposals Overview Understanding the Request for Proposal |
74 | Submission and Evaluation of the Response to the Request for Proposal |
75 | Scope of Work |
76 | Basic Requirements Contractual/Administrative Requirements |
77 | Basic Planning and Needs Assessment |
79 | Outlining the Scope of Work Process |
80 | Writing and Reviewing Description of Format |
81 | End Result Deliverable |
82 | Language and Expression |
83 | Referencing Codes and Standards |
84 | Design Planning Overview Traditional Design Process |
85 | Data Center Design Process |
86 | Design Team Members |
87 | Design Phases Schematic Design |
88 | Design Development |
89 | Construction Document |
90 | Elements of Design Specifications Drawings |
91 | Cost Estimates |
92 | Technology Design Needs Assessment Design Analysis Acquisition Implementation |
93 | Critical Design Tasks |
97 | Developing a Quality Plan |
98 | Quality Benchmarking |
99 | Operations and Business Continuity Factors Overview Energy Regulatory Trends European Union |
100 | Efficiency and Productivity Indicators |
101 | Existing Facility Assessment |
102 | Reporting Security Security Development Theory |
104 | Security Assessment Process |
109 | Design Approach |
112 | Network Vulnerability Assessment |
115 | Governance Public Governance |
116 | Private Governance Voluntary Governance Documentation |
117 | Documentation Disaster Recovery Plan Establish A Team |
120 | DRP Planning Methods |
121 | Plan Benefits Types of Plans |
122 | Implementation |
123 | Colocation Technical Planning Overview |
124 | Floor Plan Ceiling Height |
125 | Movement of Equipment Floor Loading |
126 | Cabinets |
127 | Point-of-Presence Rooms |
128 | Cabling Between Point-of-Presence Rooms |
129 | Cabling within Cages/Suites |
130 | Power Within Computer Rooms |
132 | Work Rules and Procedures |
133 | Planning for the Edge Data Center (EDC) Facility General Considerations Location Space Planning Class Rating and Reliability Codes and Standards |
134 | Edge Data Center Power |
135 | Power Systems Space Planning |
136 | Generator power |
137 | Cooling Edge Data Centers Communication Cabling |
138 | Security, Fire Protection and Building Automation |
140 | Chapter 3 – Project Implementation |
142 | Table of Contents |
143 | Figure |
144 | Pre-Construction Project Bidding and Negotiating Types of Bid Structures |
145 | Types of Bids |
146 | Awarding of Bids Types of Contracts |
147 | Contract Payment Methodologies Notice to Proceed |
148 | Construction Administration Organizing the Project Team Construction Team Members |
149 | Developing a Communications Plan |
150 | Pre-Construction Meetings |
151 | Forms |
152 | Request for Information |
153 | Submittals |
154 | Tracking and Managing the Plan Change Control System |
156 | Vendor and Contractor Coordination |
157 | Project Installation and Implementation Pre-Construction Site Survey |
159 | Retrofit Additional Survey Tasks Risk Management Plan |
160 | Safety Plan |
161 | Meetings Initial Construction Meeting Pre-installation Meeting |
162 | Progress Meetings |
163 | Materials and Logistics Ordering Materials Receiving Materials |
164 | Storing Materials |
165 | Distributing Materials on Site |
166 | Managing the Project Schedule |
167 | Commissioning Overview Recommendations |
168 | Phases of the Commissioning Process Program Phase |
169 | Design Phase Construction Phase Acceptance Phase |
170 | Post-acceptance Phase Types of Commissioning New Building |
171 | Existing Building Commissioning Testing Functional Testing Components Functional Testing Procedures |
172 | Test Plan and Documentation Testing Equipment System Testing |
174 | Acceptance Testing Retesting Equipment and Systems |
175 | Validation |
176 | Commissioning Documents Design Documents Process Documents Verification Documents |
177 | Final Commissioning Report |
178 | Project Closeout Overview |
179 | Post-construction |
180 | Post-construction/Post-installation Considerations and Tasks |
182 | Chapter 4 – Project Management Essentials |
184 | Table of Contents |
185 | Figures Tables |
186 | Project Management: An Overview Introduction |
187 | Project Project Objectives |
188 | Project Stakeholders |
189 | Project Team Members Role of Project Managers |
190 | Technical Expertise Project Management Steps |
191 | Project Management Knowledge Areas Human Resources Management Scope Management Integration Management Time Management |
192 | Cost Management Quality Management Communications Management Risk Management Stakeholder Management Procurement Management |
193 | Project Management Tools Developing an Organization Breakdown Structure |
194 | Building a Work Breakdown Structure |
198 | Developing a Schedule Using PERT, Milestone, Gantt, and Calendar Charts |
203 | Developing Estimates |
204 | Using the Budget to Determine Project Performance |
217 | Stakeholder Relations and Management Overview |
218 | Interpersonal Skills and Communication Effective Communication Skills |
220 | Customer Relations Customer Perception |
221 | Feedback and Follow-Through Professional Appearance |
222 | Stakeholder Management |
224 | Chapter 5 – Project Documentation |
226 | Table of Contents |
227 | Figure |
228 | Project Documentation Introduction |
229 | Project Drawings |
232 | The U.S. National Computer-Aided Design Standard® Components of the National Computer-Aided Design Standard |
233 | Adoption of the National Computer-Aided Design Standard |
234 | Expanded Listing of Components of the National Computer-Aided Design Standard |
235 | Hierarchy of Data Fields |
237 | Symbol Types Construction Specifications |
239 | Types of Project Documentation Overview Project Log |
240 | Maintaining the Project Log |
241 | Quality Assurance Plan Project Safety Plan Request for Information Log |
242 | Submittals Change Orders |
243 | Acceptance Plan Commissioning Plan Punch List Log |
244 | Closeout Submittals As-Built Drawings |
245 | Network Traffic Studies Warranty and License Documentation Test Documentation |
246 | Operations and Maintenance Documentation Patching Matrix Photographs |
248 | Chapter 6 – Risk Management |
250 | Table of Contents |
251 | Figures Tables |
252 | Risk Management Introduction |
253 | Risk Management Objectives |
254 | Client Involvement Accuracy Accountability Management Support |
255 | Early Warning Indicators in Risk Management Risk Management Review Cycle Risk Versus Liability Culture |
256 | Continued Improvement Risk Evaluation |
257 | Risk Identification |
259 | Risk Analysis |
262 | Risk Mitigation |
264 | Corrective Actions |
265 | Risk Control Risk Checklist |
270 | Glossary |
272 | Glossary Terms A |
273 | B |
274 | C |
276 | D |
277 | E F |
278 | G I L |
279 | M N O |
280 | P |
281 | Q R |
283 | S |
284 | T |
285 | U V W |
286 | X |