BICSI Field Guide 2 Copper 2019
$16.25
ICT Installation Practices Field Guides: Volume 2 – Copper Cabling, 1st Edition
Published By | Publication Date | Number of Pages |
BICSI | 2019 |
This guide focuses on just that – balanced twisted-pair and coaxial communication cabling. Throughout its pages you will find everything likely to come up on the job site, from cable classification, cable construction, horizontal and backbone applications, performance specifications, length limitations, termination, troubleshooting, and much more.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | ICT Installation Practices Field Guide |
2 | Preface |
5 | WARNING |
6 | Acknowledgments |
8 | Icons, Abbreviations and Acronyms |
12 | Table of Contents |
15 | Figures |
18 | Tables |
19 | Steps |
20 | Balanced Twisted-Pair Cable Cable Construction Pair Twist Cable Design |
22 | Cabling Performance Classification |
23 | Conductor Color Codes |
26 | Balanced Twisted-Pair Cable Jacket Listing Designations |
27 | Coaxial Cable |
29 | Pathways and Spaces Backbone Copper Cabling Backbone Copper Cabling Length Limitations |
32 | Horizontal Copper Cabling |
33 | Mixing Higher Cabling with Lower Performing Cabling |
34 | Terminating Cable Modular Twisted-Pair Connectors |
35 | Modular Twisted-Pair Jacks and Plugs |
37 | Insulation Displacement Contact (IDC) Termination Block Hardware 66-Style Block |
38 | 110-Style Block |
39 | BIX®-Style Block |
41 | LSA-Style Block |
42 | Patch Panels |
43 | Coaxial Connectors F Coaxial Connectors |
44 | N Coaxial Connectors BNC Coaxial Connectors |
45 | Copper Insulation Displacement Contact (IDC) Termination |
50 | Screened/Shielded Terminations Insulation Displacement Contact (IDC) Termination Blocks |
54 | Patch Panel Coaxial Cable Terminations |
56 | Single and Dual Conductor Splice Connectors |
70 | Copper Cable Testing and Troubleshooting Test Equipment |
74 | Designations of Certification Test Sets |
77 | Testing 100-Ohm Balanced Twisted-Pair Horizontal Cabling Wire Map/Continuity Testing |
78 | Certification Field Testing Setup |
80 | Certification Field Testing Results |
82 | Testing Multipair Backbone Cabling for Continuity and Length |
83 | Continuity Testing 50/75-Ohm Coaxial Cabling |
85 | Length Determination for 50/75-Ohm Coaxial Cabling |
86 | Troubleshooting Copper Cabling Systems |
89 | Verifying the Problem |
90 | Isolating and Repairing the Source of the Problem |
94 | High Insertion Loss (Copper) |
95 | Attenuation-to-Crosstalk Ratio (ACR) Incorrect Capacitance |
96 | Excessive Near-End Crosstalk (NEXT) |
97 | Excessive Attenuation-to-Crosstalk Ratio Far-End (ACRF) Excessive Power Sum Near-End Crosstalk (PSNEXT) Excessive Power Sum Attenuation-to-Crosstalk Ratio Far-End (PSACRF) Wire Map Inconsistencies |
98 | Excessive Propagation Delay Excessive Delay Skew Excessive Return Loss |
99 | Incorrect Cable Length |
100 | Excessive Alien Crosstalk (AXT) Setting Nominal Velocity of Propagation (NVP) |
102 | Excessive Loop Resistance Incorrect Connections Incorrect Impedance |
103 | Noise |
104 | Locating Cables Testing the Repaired System |
108 | Balanced Twisted-Pair Media Fault Isolation |
111 | ICT Circuit Protection |
112 | Lightning Exposure for Outside Plant (OSP) |
113 | Primary Protectors |
114 | Carbon Blocks (Legacy) |
115 | Gas Tubes (Typical) |
116 | Solid State (Typical) Primary Protector Terminal Installation |
118 | Secondary Protectors Heat Coil (Legacy) |
119 | Sneak Current Fuse |
120 | Positive Temperature Coefficient Resistors Data and Fire Alarm Protectors |
122 | Workmanship Slack Dressing and Bundling Cables |
123 | Pathways and Cable Management |
124 | Index # A B |
125 | C D |
126 | F H I L |
127 | M N O P R |
128 | S T W |