Shopping Cart

No products in the cart.

BOMA Z65.2 2012

$32.47

ANSI/BOMA Z65.2-2012: Industrial Buildings: Standard Methods of Measurement

Published By Publication Date Number of Pages
BOMA 2012 58
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

From the first skyscrapers to modern industrial complexes, BOMA has been defining the way commercial real estate professionals measure their properties for nearly 100 years. This updated measurement standard for industrial buildings was developed by BOMA International and the Society of Industrial and Office Realtors®. Industrial Buildings: Standard Methods of Measurement (ANSI Z65.2-2012) details procedures for determining the area of an industrial building using the two dominant market measurement practices observed in North America–the Exterior Wall Methodology (Method A) or the Drip Line Methodology (Method B). Key features of the Industrial Standard include: Measurement information for determining and calculating rentable area for both single occupancy and multiple occupancy in both one-story and multi-story buildings. 22 definitions of common terms used in industrial building measurement. Illustrations throughout that demonstrate different measurement methodologies for various building sizes and occupancy types. Information on areas/items to be excluded in floor area calculations, as well as special conditions. Who benefits from BOMA Standards? A cross section of real estate professionals: building owners, property managers, facility managers, architects, space planners, interior designers, engineers, leasing professionals, asset managers, appraisers, brokers, general contractors and many others.

PDF Catalog

PDF Pages PDF Title
1 COVER PAGE
2 TABLE OF CONTENTS
3 LEGAL NOTICE
4 ACKNOWLEDGEMENTS
5 INTRODUCTION
6 SECTION 1: SCOPE, APPLICATION AND USE
7 SECTION 2: OVERVIEW OF MEASUREMENT METHODS
8 SECTION 3A – METHOD A: EXTERIOR ENCLOSURE METHOD
9 METHOD A – SCENARIO 1: ONE STORY, SINGLE OCCUPANT
10 METHOD A – SCENARIO 2: ONE STORY, MULTIPLE OCCUPANTS
11 METHOD A – SCENARIO 2: GLOBAL SUMMARY OF AREAS
13 METHOD A – SCENARIO 3: MULTIPLE STORIES, SINGLE OCCUPANT
14 METHOD A – SCENARIO 4: MULTIPLE STORIES, MULTIPLE OCCUPANTS
15 METHOD A – SCENARIO 4: GLOBAL SUMMARY OF AREAS
17 SECTION 3B – METHOD B: DRIP LINE METHOD
18 METHOD B – SCENARIO 1: ONE STORY, SINGLE OCCUPANT
19 METHOD B – SCENARIO 2: ONE STORY, MULTIPLE OCCUPANTS
20 METHOD B – SCENARIO 2: GLOBAL SUMMARY OF AREAS
22 METHOD B – SCENARIO 3: MULTIPLE STORIES, SINGLE OCCUPANT
23 METHOD B – SCENARIO 4: MULTIPLE STORIES, MULTIPLE OCCUPANTS
24 METHOD B – SCENARIO 4: GLOBAL SUMMARY OF AREAS
26 SECTION 4: CAMPUS (INDUSTRIAL PLANT) METHOD
28 CAMPUS GLOBAL SUMMARY OF AREAS
30 SECTION 5: DEFINITIONS
38 SECTION 6: APPENDIX
40 SECTION 7: LIST OF ILLUSTRATIONS
41 ILLUSTRATIONS
56 WORKSHEETS
BOMA Z65.2 2012
$32.47