Shopping Cart

No products in the cart.

BS EN 1279-6:2018

$198.66

Glass in building. Insulating glass units – Factory production control and periodic tests

Published By Publication Date Number of Pages
BSI 2018 60
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This document describes the routine factory production control, the periodic testing and inspection and test methods to verify that an insulating glass unit (IGU) conforms to the system description.

PDF Catalog

PDF Pages PDF Title
2 undefined
9 1 Scope
2 Normative references
3 Terms and definitions and symbols
3.1 Terms and definitions
10 3.2 Symbols
4 Factory production control requirements
4.1 General
4.2 Organization
4.2.1 Responsibility and authority
4.2.2 Management representative for factory production control
4.2.3 Management review
4.3 Factory production control system
4.3.1 General
11 4.3.2 Personnel
4.3.3 Documentation
4.4 Equipment
4.4.1 Testing
4.4.2 Manufacturing
4.4.3 Inspection and testing
4.4.4 Non-complying materials / products
12 Annex A (normative)Inspection and testing tables of insulating glass units
A.1 General
13 A.2 Specific requirements
A.3 Use of proxy testing
35 Annex B (normative)Periodic testing and inspection
B.1 General
B.2 Frequency and sampling
B.2.1 Frequency
B.2.2 Sampling
B.3 Conformity to the system description
B.3.1 Inspection
B.3.2 Requirements
36 B.3.3 Corrective actions
B.4 Moisture penetration index and gas concentration
B.4.1 General
B.4.2 Procedure
B.4.3 Test procedure
37 B.4.4 Requirement
B.4.4.1 Requirement on Ti and moisture penetration index
B.4.4.2 Requirements on gas concentration
B.5 Corrective Actions in case of non-conformity
B.6 Report
38 Annex C (informative)Adhesion test for leaded light strip
C.1 Purpose
C.2 Equipment
C.3 Test specimen
C.4 Procedure
39 C.5 Test report
40 Annex D (informative)Sealant, adhesion measurements
D.1 General
D.2 Standard method
D.2.1 Instruments
D.2.2 Test specimens
D.2.2.1 Glass-glass specimen
41 D.2.2.2 Spacer-spacer specimen
D.2.3 Test procedure
D.2.4 Test report
D.3 Other methods
D.3.1 Tensile test
42 D.3.2 Butterfly test
43 Annex E (informative)Sealants, hardness measurements
E.1 General
E.2 Instruments
E.3 Test specimen
44 E.4 Measurement
E.5 Report
45 Annex F (informative)Two component sealants: check on the thoroughness of mixing
F.1 Purpose
F.2 Test specimen
F.3 Test procedure
F.4 Report
46 Annex G (informative)Tightness check of hollow spacer closed by welding on the back
G.1 Purpose
G.2 Equipment
G.3 Test specimen
G.4 Procedure
G.5 Test report
47 Annex H (informative)Desiccant, water adsorption capacity check
H.1 General
H.2 Determination of the water adsorption capacity of desiccant in bulk
H.2.1 Principle
H.2.2 Equipment
H.2.3 Method
48 H.3 Determination of the water adsorption capacity of polymeric matrix incorporating desiccant
49 Annex I (informative)Desiccant Matrix Adhesion test in u-channels
I.1 General
I.2 Materials
I.3 Test procedure
I.4 Requirement
50 Annex J (informative)Adhesion tests for insulating glass units with prefabricated flexible spacer incorporating desiccant
J.1 Adhesion test of spacer to sealant
J.1.1 General
J.1.2 Materials
J.1.3 Test preparation and procedure
J.1.4 Requirements
51 J.2 Wet out strain and shear test
J.2.1 Materials
J.2.2 Test procedure
55 J.2.3 Requirements
56 Annex K (informative)Reference method for dew point temperature measurement
K.1 General
K.2 Apparatus and materials
K.3 Procedure
BS EN 1279-6:2018
$198.66