BS EN 14065:2016 – TC:2020 Edition
$217.84
Tracked Changes. Textiles. Laundry processed textiles. Biocontamination control system
Published By | Publication Date | Number of Pages |
BSI | 2020 | 0 |
This European Standard describes a risk management approach, called Risk Analysis and Biocontamination Control (RABC), designed to enable laundries to continuously assure the microbiological quality of laundry processed textiles. The RABC approach applies for laundry market sectors where it is necessary to control biocontamination, e.g. pharmaceuticals, medical devices, food, healthcare and cosmetics. The RABC approach excludes those aspects relating to worker safety and sterility of the final product.
PDF Catalog
PDF Pages | PDF Title |
---|---|
56 | 1 Scope 2 Normative references 3 Terms and definitions |
59 | 4 General principles and requirements 4.1 Principles and framework |
60 | 4.2 General requirements 5 Alignment with a quality management system 6 Application of the Risk Analysis and Biocontamination Control system to laundries 6.1 General 6.2 Prerequisites and preliminary actions for establishing a RABC system 6.2.1 Management commitment 6.2.2 Constitution of the RABC team |
61 | 6.2.3 Prerequisites programme (PRP) 6.2.3.1 General 6.2.3.2 General prerequisites 6.2.3.3 Operational prerequisites |
62 | 6.2.4 Determination of the intended end use of the textile 6.2.5 Preparation of laundry flow diagram(s) 6.2.6 Process specification 6.2.7 Training awareness and competency 6.2.8 Purchasing information 6.3 Application of the seven principles for implementing the RABC system 6.3.1 General 6.3.2 Principle 1: List of microbiological hazards and list of control measures 6.3.2.1 Identification of the hazard(s) associated with the environment, process or product 6.3.2.2 Assessment of textile biocontamination risks |
63 | 6.3.2.3 Identification of control measures 6.3.3 Principle 2: Determine the Critical Control Points (CCPs) and Control Points (CPs) 6.3.4 Principle 3: Establish the target levels and tolerance limits for each CCP 6.3.5 Principle 4: Establish a monitoring programme for each CCP |
64 | 6.3.6 Principle 5: Establish corrective actions 6.3.7 Principle 6: Establish the RABC system checking procedures 6.3.7.1 Validation and re-validation of CCPs |
65 | 6.3.7.2 Review of the RABC system 6.3.7.3 Internal audit 6.3.8 Principle 7: Establish a documentation system |