BS EN 14654-3:2021
$142.49
Drain and sewer systems outside buildings. Management and control of activities – Drain and sewer cleaning
Published By | Publication Date | Number of Pages |
BSI | 2021 | 28 |
This document establishes requirements for the management and control of activities in drain and sewer systems outside buildings and specifies requirements for development and implementation of work programmes, and the selection of techniques.
This document covers the management and control of drain and sewer cleaning.
It is applicable to drain and sewer systems from the point where wastewater leaves a building, roof drainage system, or paved area, to the point where it is discharged into a wastewater treatment plant or receiving water body.
Drains and sewers below buildings are included provided that they do not form part of the drainage system of the building.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
7 | 1 Scope 2 Normative references |
8 | Terms and definitions 3.1 General |
9 | 3.2 Deposits 3.3 Cleaning techniques |
10 | 4 General 5 Integrated sewer system management planning 5.1 Introduction 5.2 Cleaning aims |
11 | 6 Preparation of the cleaning programme 6.1 Introduction 6.2 Review of the cleaning activities planning 6.3 Investigation 6.3.1 Introduction 6.3.2 Review of previous investigations |
12 | 6.3.3 Further investigations 6.4 Assessment |
13 | 6.5 Development of the programme 6.5.1 Introduction 6.5.2 Specification of objectives 6.5.3 Developing options |
14 | 6.5.4 Assess feasibility of solutions 6.5.5 Select optimum solution 6.5.6 Producing the programme 7 Preparation of the project specification 7.1 Introduction 7.2 Review of the project description and project objectives 7.3 Investigation |
15 | 7.4 Assessment 7.5 Drafting the project specification 7.5.1 Introduction 7.5.2 Prepare potential solutions |
16 | 7.5.3 Assess feasibility of solutions 7.5.4 Select optimal solution 7.5.5 Detailed design of optimal solution 7.5.6 Prepare project specification |
17 | 7.6 Performance indicators 7.6.1 Introduction 7.6.2 Indicators for the assessment of the work quality 7.6.3 Indicators for the assessment of the effectiveness of the project or programme |
18 | 8 Implementation of projects 8.1 Introduction 8.2 Select cleaning method |
19 | 8.3 Health and safety 8.4 Environmental impact |
20 | 8.5 Cleaning report 9 Measurement of conformity 9.1 Measuring conformity with the project specification 9.2 Non-conformities |
21 | 10 Review of plan and programme |
22 | Annex A (informative)Example of cleaning report form |
23 | Annex B (informative)Drain and sewer cleaning techniques B.1 General B.2 Jetting B.3 Jetting with suction |
24 | B.4 Winching B.5 Rodding B.6 Remote controlled equipment B.7 Flushing B.8 Cleaning balls/scouring plates B.9 Manual or mechanical excavation |