Shopping Cart

No products in the cart.

BS EN 60974-4:2016

$102.76

Arc welding equipment – Periodic inspection and testing

Published By Publication Date Number of Pages
BSI 2016 22
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 60974 specifies test procedures for periodic inspection and, after repair, to ensure electrical safety. These test procedures are also applicable for maintenance.

This standard is applicable to power sources for arc welding and allied processes designed in accordance with IEC 60974‑1 or IEC 60974‑6 . Stand-alone ancillary equipment designed in accordance with other parts of IEC 60974 may be tested in accordance with relevant requirements of this part of IEC 60974 .

NOTE 1

The welding power source can be tested with any ancillary equipment fitted that can affect the test results.

This standard is not applicable to testing of new power sources or engine-driven power sources.

NOTE 2

For a power source not built in accordance with IEC 60974‑1, see Annex C.

PDF Catalog

PDF Pages PDF Title
6 English
CONTENTS
7 FOREWORD
9 1 Scope
2 Normative references
3 Terms and definitions
10 4 General requirements
4.1 Qualification of test personnel
4.2 Test conditions
4.3 Measuring instruments
11 4.4 Periodic inspection and test
4.5 Maintenance
4.6 Repair
4.7 Test sequence
12 5 Protection against electrical shock
5.1 Visual inspection
5.2 Continuity of the protective circuit
Table 1 – Test sequence on used arc welding equipment
13 5.3 Insulation resistance
5.4 Welding circuit touch current
Figures
Figure 1 – Measurement of welding circuit touch current
Table 2 – Insulation resistance
14 5.5 Touch current in normal condition
5.6 Protective conductor current
Figure 2 – Measurement of touch current in normal condition
15 5.7 No-load voltage (U0)
Figure 3 – Principles of protective conductor current measurementfor single phase equipment
16 6 Functional test
6.1 Function
6.2 Supply-circuit on/off switching device
6.3 Voltage-reducing device
Figure 4 – Measurement of peak values
17 6.4 Magnetic gas valve
6.5 Signal and control lamps
7 Documentation
7.1 Test report
7.2 Labelling
18 Annex A (informative) Check-list for the visual inspection
19 Annex B (informative) Example of a test report after repair
20 Annex C (informative) Equipment not built in accordance with IEC 60974-1
BS EN 60974-4:2016
$102.76