Shopping Cart

No products in the cart.

BS EN 61375-2-2:2012

$215.11

Electronic railway equipment. Train communication network (TCN) – Wire Train Bus conformance testing

Published By Publication Date Number of Pages
BSI 2012 106
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. Weโ€™re here to assist you 24/7.
Email:[email protected]

This part of IEC 61375 applies to all equipment and devices implemented according to IEC 61375-2-1, i.e. it covers the procedures to be applied to such equipment and devices when the conformance should be proven.

The applicability of this standard to a TCN implementation allows for individual conformance checking of the implementation itself and is a pre-requisite for further interoperability checking between different TCN implementations.

NOTE For a definition of TCN implementation see IEC 61375-2-1,1.3.

PDF Catalog

PDF Pages PDF Title
7 English
CONTENTS
11 INTRODUCTION
12 Tables
Table 1 โ€“ Document structure
13 1 Scope
2 Normative references
3 Terms and definitions, abbreviations, conventions
3.1 Terms and definitions
14 3.2 Abbreviations
15 4 Conformance test: approach, requirements and boundaries
4.1 Approach
4.1.1 Requirements
17 4.1.2 Requirements declaration statements for an IUT
18 4.2 Boundaries
4.2.1 General
19 4.2.2 Basic interconnection tests
4.2.3 Capability tests
20 4.2.4 Behaviour tests
4.2.5 Conformance resolution tests
21 4.2.6 Interpretation of clauses/subclauses and statements
22 Table 2 โ€“ Continuance indication
23 4.2.7 Relation to interoperability
4.2.8 Relation to performance test
Table 3 โ€“ Weak statements
Table 4 โ€“ Relation to interoperability
24 4.3 Conformance assessment process outline
4.3.1 General
4.3.2 Analysis of results, outcomes and verdicts
Table 5 โ€“ Relation to performance test
25 5 Conformance test of a WTB node, WTB trunk cable, WTB jumper cables, WTB extension cables
5.1 PICS
5.1.1 Instructions for filling the PICS pro-forma
27 5.1.2 PICS tables
Table 6 โ€“ PICS pro-forma identification
28 Table 7 โ€“ PICS pro-forma implementation under test
Table 8 โ€“ PICS pro-forma IUT supplier and/or test laboratory client
29 Table 9 โ€“ PICS pro-forma identification of the standards
Table 10 โ€“ PICS pro-forma global statement of conformance
Table 11 โ€“ PICS pro-forma level of testing
30 Table 12 โ€“ PICS pro-forma node capability
Table 13 โ€“ PICS pro-forma redundancy
Table 14 โ€“ PICS pro-forma redundancy configuration
31 Table 15 โ€“ PICS pro-forma signalling
Table 16 โ€“ PICS pro-forma cable
Table 17 โ€“ PICS pro-forma trunk cable
32 Table 18 โ€“ PICS pro-forma jumper cable
Table 19 โ€“ PICS pro-forma extension cable
33 Table 20 โ€“ PICS pro-forma front panel layout
Table 21 โ€“ PICS pro-forma connector arrangement
34 Table 22 โ€“ PICS pro-forma connector layout and type
35 5.1.3 Basic interconnection tests
5.1.4 Capability tests
5.1.5 Behaviour tests
Table 23 โ€“ PICS pro-forma switches type
Table 24 โ€“ PICS pro-forma switches
37 Figures
Figure 1 โ€“ Insertion loss measurement
38 Figure 2 โ€“ Measurement of the input resistance
Figure 3 โ€“ End setting measurement setup 1
39 Figure 4 โ€“ End setting measurement setup 2
40 Figure 5 โ€“ Switches measurement setup 1
Figure 6 โ€“ Indirect attachment switches measurements fixture 1
41 Figure 7 โ€“ Direct attachment switches measurements fixture 1
Table 25 โ€“ WTB pin to pin measurement
42 Figure 8 โ€“ Transmitter fixtures
43 Figure 9 โ€“ Transmitter output signal
Figure 10 โ€“ Intermediate transmitted noise test fixture
44 Figure 11 โ€“ End node transmitted noise test fixture
45 Figure 12 โ€“ Signal and idling at transmitter
Table 26 โ€“ Fault tolerance parameters
46 Figure 13 โ€“ RF resistor example
Figure 14 โ€“ Short-circuit test fixture 1
48 Figure 15 โ€“ Receiver signal envelope
49 Figure 16 โ€“ Receiver edge distortion
50 5.1.6 Link layer interface
Table 27 โ€“ Frequency sinusoidal signal
52 Figure 17 โ€“ Example of relay switch logic diagram for line A
53 Table 28 โ€“ WTB devices configuration
54 Table 29 โ€“ TNM agent services
Table 30 โ€“ Mapping Server services
55 Figure 18 โ€“ WTB orientation
56 Figure 19 โ€“ Line switch identification in position P01
Figure 20 โ€“ Line switch identification in position P10
Table 31 โ€“ Power switch identifier
Table 32 โ€“ Line switch identifier
57 Figure 21 โ€“ Line switch identification in position P32
Table 33 โ€“ Test suites
58 Figure 22 โ€“ Test suite identifier TTS1
59 Figure 23 โ€“ Test suite identifier TTS2
60 Figure 24 โ€“ Test suite identifier TTS3
61 5.1.7 Test cases
62 Table 34 โ€“ Test sequence node strength
Table 35 โ€“ Test sequence change of user report
63 Table 36 โ€“ Test sequence change of node descriptor
Table 37 โ€“ Test sequence change of inauguration data
64 Table 38 โ€“ Test sequence inauguration inhibit lengthening
Table 39 โ€“ Test sequence sleep state
65 Table 40 โ€“ Test sequence fast insertion
Table 41 โ€“ Test sequence late insertion
66 Table 42 โ€“ Test sequence process data
Table 43 โ€“ Test sequence individual period 3
Table 44 โ€“ Test sequence individual period 2
67 Table 45 โ€“ Test sequence coupling of two compositions
68 Table 46 โ€“Test sequence inauguration time IUT intermediate
Table 47 โ€“ Test sequence inauguration time IUT end setting main direction 2
Table 48 โ€“ Test sequence inauguration time IUT end setting main direction 1
69 Table 49 โ€“ Test sequence failure of the master node
Table 50 โ€“ Test sequence line redundancy during regular operation
70 Table 51 โ€“ Test sequence line redundancy during inauguration
Table 52 โ€“ Test sequence measurement of basic period
71 6 Conformance test of RTP
Table 53 โ€“ WTB link layer procedures
72 6.1 Ports and Traffic_Store
6.2 Dataset consistency
6.2.1 Error handling
6.2.2 Freshness supervision
6.2.3 Synchronisation dataset
73 6.2.4 Dataset polling
6.2.5 Dataset, port and logical address
6.2.6 Traffic_Store Identifier
6.3 Port_Address
6.4 Link_Process_Data_Interface primitives
6.5 Messages services and protocols
7 Conformance test of a WTB-equipped consist
7.1 General
74 7.2 PICS
7.2.1 Instructions for filling the PICS pro-forma
7.2.2 Abbreviations
7.2.3 PICS tables
Table 54 โ€“ PICS pro-forma identification
75 Table 55 โ€“ PICS pro-forma WTB consist under test
Table 56 โ€“ PICS pro-forma identification of consist WTB node
76 Table 57 โ€“ PICS pro-forma identification of consist trunk cable
Table 58 โ€“ PICS pro-forma identification of consist jumper cable
77 7.3 Test suites
Table 59 โ€“ PICS pro-forma identification of consist extension cable
78 7.3.1 Physical interface tests
7.3.2 DC test: line resistance
79 Figure 25 โ€“ Line resistance
80 Figure 26 โ€“ Crosstalk
81 7.3.3 WTB Link_layer capabilities
Figure 27 โ€“ Propagation delay and attenuation
86 Figure 28 โ€“ Coach tester nodes
88 7.3.4 Data test storage
7.4 Consist network interoperability test
7.5 Application profile
7.6 Several nodes on the consist
8 Conformance test of NM
89 Annex A (normative) Test laboratory role and client role
96 Annex B (informative) Test instrumentation and dedicated test bed
97 Figure B.1 โ€“ Hardware test bed architecture
98 Figure B.2 โ€“ Coach tester architecture
102 Figure B.3 โ€“ Configuration of the coach tester
103 Figure B.4 โ€“ WTB line redundancy switch-over
104 Bibliography
BS EN 61375-2-2:2012
$215.11