Fuel cell technologies – Stationary fuel cell power systems. Installation
Published By | Publication Date | Number of Pages |
BSI | 2012 | 22 |
IEC 62282-3-300:2012 provides minimum safety requirements for the installation of indoor and outdoor stationary fuel cell power systems in compliance with IEC 62282-3-100 and applies to the installation of the following systems: – intended for electrical connection to mains directly or with a readily accessible, manually operable switch or circuit-breaker; – intended for a stand-alone power distribution system; – intended to provide AC or DC power; – with or without the ability to recover useful heat.
PDF Catalog
PDF Pages | PDF Title |
---|---|
6 | English CONTENTS |
8 | INTRODUCTION |
9 | 1 Scope |
10 | 2 Normative references Figure 1 ā Fuel cell power system |
11 | 3 Terms and definitions |
12 | 4 General safety requirements and strategy |
13 | 5 Siting considerations 5.1 General siting |
14 | 5.2 Outdoor installations 5.2.1 Air intakes and vents 5.2.2 Air intakes and exhaust 5.2.3 Exhaust outlets 5.2.4 Area around outlets 5.2.5 Enclosures 5.3 Indoor installations 5.3.1 General |
15 | 5.3.2 Small fuel cell power systems 5.4 Rooftop installation 6 Ventilation and exhaust 6.1 General 6.2 Ventilation 6.3 Exhaust system 6.3.1 General 6.3.2 Small fuel cell systems 6.4 Purging and venting processes |
16 | 7 Fire protection and gas detection 7.1 Fire protection and detection 7.1.1 Site fire protection 7.1.2 Combustible gas detection (indoor installations only) 7.2 Fire prevention and emergency planning |
17 | 8 Interconnections with site interfaces 8.1 General 8.2 Connections to fuel supplies ā General 8.3 Fuel shut-off and piping 8.4 Connections to auxiliary media supply and media disposal 8.4.1 General 8.4.2 Combustible auxiliary gases 8.4.3 Non-combustible or inert auxiliary gases 8.4.4 Water |
18 | 8.4.5 Waste water and condensate disposal 8.4.6 Discharge pipe 9 Environmental requirements 10 Approval tests 10.1 Gas leakage 10.2 Site specific shut-down devices 11 Maintenance tests |
19 | 12 Documentation 12.1 Markings and instructions 12.2 Inspection checklist 12.3 Installation manual 12.4 Userās information manual 12.5 Maintenance manual |