BS EN 62446-1:2016+A1:2018
$189.07
Photovoltaic (PV) systems. Requirements for testing, documentation and maintenance – Grid connected systems. Documentation, commissioning tests and inspection
Published By | Publication Date | Number of Pages |
BSI | 2018 | 46 |
This part of IEC 62446 defines the information and documentation required to be handed over to a customer following the installation of a grid connected PV system. It also describes the commissioning tests, inspection criteria and documentation expected to verify the safe installation and correct operation of the system. It can also be used for periodic retesting.
This part of IEC 62446 is written for grid connected PV systems that do not utilize energy storage (e.g. batteries) or hybrid systems.
This part of IEC 62446 is for use by system designers and installers of grid connected solar PV systems as a template to provide effective documentation to a customer. By detailing the expected commissioning tests and inspection criteria, it is also intended to assist in the verification/inspection of a grid connected PV system after installation and for subsequent re-inspection, maintenance or modifications.
This part of IEC 62446 defines the different test regimes expected for different solar PV system types to ensure that the test regime applied is appropriate to the scale, type and complexity of the system in question.
NOTE This part of IEC 62446 does not address CPV (concentrating PV) systems, however many of the parts may apply.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
4 | European foreword Anchor 3 Foreword to amendment A1 |
5 | Annex ZA (normative) Normative references to international publications with their corresponding European publications |
8 | FOREWORD |
10 | INTRODUCTION |
11 | 1 Scope 2 Normative references |
12 | 3 Terms and definitions |
13 | 4 System documentation requirements 4.1 General |
14 | 4.2 System data 4.2.1 Basic system information 4.2.2 System designer information 4.2.3 System installer information 4.3 Wiring diagram 4.3.1 General |
15 | 4.3.2 Array — General specifications 4.3.3 PV string information 4.3.4 Array electrical details 4.3.5 AC system 4.3.6 Earthing and overvoltage protection |
16 | 4.4 String layout 4.5 Datasheets 4.6 Mechanical design information 4.7 Emergency systems 4.8 Operation and maintenance information 4.9 Test results and commissioning data |
17 | 5 Verification 5.1 General 5.2 Inspection 5.2.1 General 5.2.2 DC system — General |
18 | 5.2.3 DC system — Protection against electric shock 5.2.4 DC system — Protection against the effects of insulation faults 5.2.5 DC system — Protection against overcurrent |
19 | 5.2.6 DC system — Earthing and bonding arrangements 5.2.7 DC system — Protection against the effects of lightning and overvoltage 5.2.8 DC system — Selection and erection of electrical equipment |
20 | 5.2.9 AC system 5.2.10 Labelling and identification 5.3 Testing 5.3.1 General |
21 | 5.3.2 Test regimes and additional tests 5.3.3 Test regimes for systems with module level electronics 5.3.4 Category 1 test regime — All systems |
22 | 5.3.5 Category 2 test regime |
23 | 5.3.6 Additional tests 6 Test procedures — Category 1 6.1 Continuity of protective earthing and equipotential bonding conductors 6.2 Polarity test 6.3 PV string combiner box test |
24 | 6.4 PV string — Open circuit voltage measurement |
25 | 6.5 PV string — Current measurement 6.5.1 General 6.5.2 PV string — Short circuit test |
26 | 6.5.3 PV string — Operational test |
27 | 6.6 Functional tests 6.7 PV array insulation resistance test 6.7.1 General 6.7.2 PV array insulation resistance test — Test method |
28 | 6.7.3 PV array insulation resistance — Test procedure |
29 | 7 Test procedures — Category 2 7.1 General 7.2 String I-V curve measurement 7.2.1 General 7.2.2 I-V curve measurement of Voc and Isc |
30 | 7.2.3 I-V curve measurement — Array performance check |
31 | 7.2.4 I-V curve measurement — Identification of module / array defects or shading issues 7.3 PV array infrared camera inspection procedure 7.3.1 General 7.3.2 IR test procedure |
32 | 7.3.3 Interpreting IR test results |
33 | 8 Test procedures — Additional tests 8.1 Voltage to ground — Resistive ground systems 8.2 Blocking diode test 8.3 PV array — Wet insulation resistance test 8.3.1 General |
34 | 8.3.2 Wet insulation test procedure 8.4 Shade evaluation |
35 | 9 Verification reports 9.1 General 9.2 Initial verification 9.3 Periodic verification |
36 | Annex A (informative) Model verification certificate |
37 | Annex B (informative) Model inspection report |
40 | Annex C (informative) Model PV array test report |
41 | Annex D (informative) Interpreting I-V curve shapes |