Shopping Cart

No products in the cart.

BS EN IEC 61784-2-2:2023

$167.15

Industrial networks. Profiles – Additional real-time fieldbus profiles based on ISO/IEC/IEEE 8802-3. CPF 2

Published By Publication Date Number of Pages
BSI 2023 34
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
2 undefined
5 Annex ZA (normative)Normative references to international publicationswith their corresponding European publications
7 English
CONTENTS
9 FOREWORD
11 INTRODUCTION
12 1 Scope
2 Normative references
14 3 Terms, definitions, abbreviated terms, acronyms, and conventions
3.1 Terms and definitions
3.2 Abbreviated terms and acronyms
3.3 Symbols
15 3.4 Conventions
4 CPF 2 (CIP™) – RTE communication profiles
4.1 General overview
Tables
Table 1 – CPF 2 symbols
16 4.2 CP 2/2
4.2.1 Physical layer
4.2.2 Data-link layer
4.2.3 Application layer
4.2.4 Performance indicator selection
Table 2 – CP 2/2: PI overview
17 Table 3 – CP 2/2: PI dependency matrix
20 4.3 CP 2/2.1
4.3.1 Physical layer
4.3.2 Data-link layer
Table 4 – CP 2/2: Consistent set of PIs for factory automation
21 Table 5 – CP 2/2.1: DLL protocol selection
22 4.3.3 Application layer
Table 6 – CP 2/2.1: DLL protocol selection of management objects
23 Table 7 – CP 2/2.1: AL service selection
24 Table 8 – CP 2/2.1: AL protocol selection
25 Table 9 – ClockIdentity encoding for CP 2/2
26 Table 10 – CP 2/2 implementation profiles
Table 11 – Features Supported for Type 2 Ethernet Transports implementation profile
27 Table 12 – Type 2 Ethernet transport profile supported Features
Table 13 – Supported Encapsulation Commands for transport profiles
28 4.3.4 Performance indicator selection
Table 14 – CP 2/2.1: PI overview
29 Table 15 – CP 2/2.1: PI dependency matrix
Table 16 – CP 2/2.1: Consistent set of PIs for motion control
30 Annex A (informative)CPF 2 (CIP) – Performance Indicator calculation
A.1 Profile 2/2 EtherNet/IP
A.1.1 Delivery time
A.1.2 Throughput RTE
31 A.2 Profile 2/2.1 EtherNet/IP with Time Synchronization
A.2.1 Delivery time
A.2.2 Maximum number of end-stations
32 Bibliography
BS EN IEC 61784-2-2:2023
$167.15