BS EN IEC 61784-5-12:2018:2019 Edition
$142.49
Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 12
Published By | Publication Date | Number of Pages |
BSI | 2019 | 28 |
This part of IEC 61784 specifies the installation profiles for CPF 12 (EtherCAT™) 1.
The installation profiles are specified in the annex. This annex is read in conjunction with IEC 61918:2018.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
5 | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications |
7 | CONTENTS |
9 | FOREWORD |
11 | INTRODUCTION Figure 1 – Standards relationships |
12 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 4 CPF 12: Overview of installation profiles |
13 | 5 Installation profile conventions 6 Conformance to installation profiles |
15 | Annex A (normative)CP 12/1 + CP 12/2 (EtherCAT™) specific installation profile A.1 Installation profile scope A.2 Normative references A.3 Installation profile terms, definitions, and abbreviated terms A.3.1 Terms and definitions A.3.2 Abbreviated terms A.3.3 Conventions for installation profiles A.4 Installation planning A.4.1 General |
16 | A.4.2 Planning requirements A.4.3 Network capabilities |
17 | Tables Table A.1 – Network characteristics for balanced cabling based on Ethernet |
18 | Table A.2 – Network characteristics for optical fibre cabling |
19 | A.4.4 Selection and use of cabling components Table A.3 – Information relevant to copper cable: CP12/1, CP12/2 fixed cables |
20 | Table A.4 – Information relevant to copper cable: CP12/1, CP12/2 flexible cables Table A.5 –Information relevant to copper cable: CP12/1, CP12/2 special cables |
21 | Table A.6 – Information relevant to optical fibre cables |
22 | Table A.7 – Connectors for balanced cabling CPs based on Ethernet Table A.8 – Optical fibre connecting hardware Table A.9 – Relationship between FOC and fibre types (CP 12/1 and CP 12/2) |
24 | A.4.5 Cabling planning documentation A.4.6 Verification of cabling planning specification A.5 Installation implementation A.5.1 General requirements A.5.2 Cable installation A.5.3 Connector installation A.5.4 Terminator installation |
25 | A.5.5 Device installation A.5.6 Coding and labelling A.5.7 Earthing and bonding of equipment and devices and shield cabling A.5.8 As-implemented cabling documentation A.6 Installation verification and installation acceptance test A.6.1 General A.6.2 Installation verification |
26 | A.6.3 Installation acceptance test A.7 Installation administration |
27 | A.8 Installation maintenance and installation troubleshooting |