BS EN IEC 61784-5-20:2018:2019 Edition
$189.07
Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 20
Published By | Publication Date | Number of Pages |
BSI | 2019 | 48 |
This part of IEC 61784 specifies the installation profiles for CPF 20 (ADS-net1).
The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
5 | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications |
7 | CONTENTS |
9 | FOREWORD |
11 | INTRODUCTION Figure 1 – Standards relationships |
12 | 1 Scope 2 Normative references 3 Terms, definitions, symbols and abbreviations 4 CPF 20: Overview of installation profiles |
13 | 5 Installation profile conventions 6 Conformance to installation profiles |
15 | Annex A (normative)CP 20/1 (ADS-net/μΣNETWORK-1000) specific installation profile A.1 Installation profile scope A.2 Normative references A.3 Installation profile terms, definitions, and abbreviated terms A.3.1 Terms and definitions A.3.2 Abbreviated terms A.3.3 Conventions for installation profiles |
16 | A.4 Installation planning A.4.1 General A.4.2 Planning requirements A.4.3 Network capabilities |
17 | Tables Table A.1 – Network characteristics for balanced cabling based on Ethernet |
18 | A.4.4 Selection and use of cabling components Table A.2 – Network characteristics for optical fibre cabling |
19 | Table A.3 – Information relevant to copper cable: fixed cables Table A.4 – Information relevant to copper cable: cords |
20 | Table A.5 – Information relevant to optical fibre cables Table A.6 – Connectors for balanced cabling CPs based on Ethernet |
21 | Table A.7 – Optical fibre connecting hardware Table A.8 – Relationship between FOC and fibre types (CP 20/1) |
25 | A.4.5 Cabling planning documentation A.4.6 Verification of cabling planning specification A.5 Installation implementation A.5.1 General requirements A.5.2 Cable installation Table A.9 – Parameters for balanced cables |
26 | Table A.10 – Parameters for silica optical fibre cables |
27 | A.5.3 Connector installation A.5.4 Terminator installation A.5.5 Device installation A.5.6 Coding and labelling |
28 | A.5.7 Earthing and bonding of equipment and devices and shield cabling A.5.8 As-implemented cabling documentation A.6 Installation verification and installation acceptance test A.6.1 General A.6.2 Installation verification |
30 | A.6.3 Installation acceptance test A.7 Installation administration A.8 Installation maintenance and installation troubleshooting |
31 | Annex B (normative)CP 20/2 (ADS-net/NX) specific installation profile B.1 Installation profile scope B.2 Normative references B.3 Installation profile terms, definitions, and abbreviated terms B.3.1 Terms and definitions B.3.2 Abbreviated terms B.3.3 Conventions for installation profiles |
32 | B.4 Installation planning B.4.1 General B.4.2 Planning requirements B.4.3 Network capabilities |
33 | Table B.1 – Network characteristics for balanced cabling based on Ethernet |
34 | B.4.4 Selection and use of cabling components Table B.2 – Network characteristics for optical fibre cabling |
35 | Table B.3 – Information relevant to copper cable: fixed cables Table B.4 – Information relevant to copper cable: cords |
36 | Table B.5 – Information relevant to optical fibre cables Table B.6 – Connectors for balanced cabling CPs based on Ethernet |
37 | Table B.7 – Optical fibre connecting hardware Table B.8 – Relationship between FOC and fibre types (CP 20/2) |
41 | B.4.5 Cabling planning documentation B.4.6 Verification of cabling planning specification B.5 Installation implementation B.5.1 General requirements B.5.2 Cable installation Table B.9 – Parameters for balanced cables |
42 | Table B.10 – Parameters for silica optical fibre cables |
43 | B.5.3 Connector installation B.5.4 Terminator installation B.5.5 Device installation B.5.6 Coding and labelling |
44 | B.5.7 Earthing and bonding of equipment and devices and shield cabling B.5.8 As-implemented cabling documentation B.6 Installation verification and installation acceptance test B.6.1 General B.6.2 Installation verification |
46 | B.6.3 Installation acceptance test B.7 Installation administration B.8 Installation maintenance and installation troubleshooting |
47 | Bibliography |