Shopping Cart

No products in the cart.

BS EN IEC 61784-5-20:2018:2019 Edition

$189.07

Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 20

Published By Publication Date Number of Pages
BSI 2019 48
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 61784 specifies the installation profiles for CPF 20 (ADS-net1).

The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018.

PDF Catalog

PDF Pages PDF Title
2 undefined
5 Annex ZA(normative)Normative references to international publicationswith their corresponding European publications
7 CONTENTS
9 FOREWORD
11 INTRODUCTION
Figure 1 – Standards relationships
12 1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviations
4 CPF 20: Overview of installation profiles
13 5 Installation profile conventions
6 Conformance to installation profiles
15 Annex A (normative)CP 20/1 (ADS-net/μΣNETWORK-1000) specific installation profile
A.1 Installation profile scope
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
16 A.4 Installation planning
A.4.1 General
A.4.2 Planning requirements
A.4.3 Network capabilities
17 Tables
Table A.1 – Network characteristics for balanced cabling based on Ethernet
18 A.4.4 Selection and use of cabling components
Table A.2 – Network characteristics for optical fibre cabling
19 Table A.3 – Information relevant to copper cable: fixed cables
Table A.4 – Information relevant to copper cable: cords
20 Table A.5 – Information relevant to optical fibre cables
Table A.6 – Connectors for balanced cabling CPs based on Ethernet
21 Table A.7 – Optical fibre connecting hardware
Table A.8 – Relationship between FOC and fibre types (CP 20/1)
25 A.4.5 Cabling planning documentation
A.4.6 Verification of cabling planning specification
A.5 Installation implementation
A.5.1 General requirements
A.5.2 Cable installation
Table A.9 – Parameters for balanced cables
26 Table A.10 – Parameters for silica optical fibre cables
27 A.5.3 Connector installation
A.5.4 Terminator installation
A.5.5 Device installation
A.5.6 Coding and labelling
28 A.5.7 Earthing and bonding of equipment and devices and shield cabling
A.5.8 As-implemented cabling documentation
A.6 Installation verification and installation acceptance test
A.6.1 General
A.6.2 Installation verification
30 A.6.3 Installation acceptance test
A.7 Installation administration
A.8 Installation maintenance and installation troubleshooting
31 Annex B (normative)CP 20/2 (ADS-net/NX) specific installation profile
B.1 Installation profile scope
B.2 Normative references
B.3 Installation profile terms, definitions, and abbreviated terms
B.3.1 Terms and definitions
B.3.2 Abbreviated terms
B.3.3 Conventions for installation profiles
32 B.4 Installation planning
B.4.1 General
B.4.2 Planning requirements
B.4.3 Network capabilities
33 Table B.1 – Network characteristics for balanced cabling based on Ethernet
34 B.4.4 Selection and use of cabling components
Table B.2 – Network characteristics for optical fibre cabling
35 Table B.3 – Information relevant to copper cable: fixed cables
Table B.4 – Information relevant to copper cable: cords
36 Table B.5 – Information relevant to optical fibre cables
Table B.6 – Connectors for balanced cabling CPs based on Ethernet
37 Table B.7 – Optical fibre connecting hardware
Table B.8 – Relationship between FOC and fibre types (CP 20/2)
41 B.4.5 Cabling planning documentation
B.4.6 Verification of cabling planning specification
B.5 Installation implementation
B.5.1 General requirements
B.5.2 Cable installation
Table B.9 – Parameters for balanced cables
42 Table B.10 – Parameters for silica optical fibre cables
43 B.5.3 Connector installation
B.5.4 Terminator installation
B.5.5 Device installation
B.5.6 Coding and labelling
44 B.5.7 Earthing and bonding of equipment and devices and shield cabling
B.5.8 As-implemented cabling documentation
B.6 Installation verification and installation acceptance test
B.6.1 General
B.6.2 Installation verification
46 B.6.3 Installation acceptance test
B.7 Installation administration
B.8 Installation maintenance and installation troubleshooting
47 Bibliography
BS EN IEC 61784-5-20:2018
$189.07