BS EN IEC 61784-5-21:2018:2019 Edition
$142.49
Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 21
Published By | Publication Date | Number of Pages |
BSI | 2019 | 28 |
This part of IEC 61784 specifies the installation profile for CPF 21 (FL-net1).
The installation profile is specified in Annex A. The annex is read in conjunction with IEC 61918:2018.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
5 | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications |
7 | CONTENTS |
9 | FOREWORD |
11 | INTRODUCTION Figure 1 – Standards relationships |
12 | 1 Scope 2 Normative references 3 Terms, definitions and abbreviated terms 4 CPF 21: Overview of installation profiles |
13 | 5 Installation profile conventions 6 Conformance to installation profiles |
15 | Annex A (normative)CP 21/1 (FL-net) specific installation profile A.1 Installation profile scope A.2 Normative references A.3 Installation profile terms, definitions, and abbreviated terms A.4 Installation planning A.4.1 General A.4.2 Planning requirements |
16 | A.4.3 Network capabilities |
17 | Tables Table A.1 – Network characteristics for balanced cabling based on Ethernet |
18 | Table A.2 – Network characteristics for optical fibre cabling |
19 | A.4.4 Selection and use of cabling components Table A.3 – Information relevant to copper cable: fixed cables Table A.4 – Information relevant to copper cable: cords |
20 | Table A.5 – Information relevant to optical fibre cables |
21 | Table A.6 – Connectors for balanced cabling CPs based on Ethernet Table A.7 – Optical fibre connecting hardware Table A.8 – Relationship between FOC and fibre types (CP 21/1) |
23 | A.4.5 Cabling planning documentation A.4.6 Verification of cabling planning specification A.5 Installation implementation A.5.1 General requirements A.5.2 Cable installation Table A.9 – Parameters for balanced cables Table A.10 – Parameters for silica optical fibre cables |
24 | A.5.3 Connector installation A.5.4 Terminator installation A.5.5 Device installation A.5.6 Coding and labelling A.5.7 Earthing and bonding of equipment and devices and shield cabling A.5.8 As-implemented cabling documentation A.6 Installation verification and installation acceptance test A.6.1 General A.6.2 Installation verification |
25 | A.6.3 Installation acceptance test A.7 Installation administration A.8 Installation maintenance and installation troubleshooting |
26 | Bibliography |