Shopping Cart

No products in the cart.

BS EN IEC 61784-5-8:2018:2019 Edition

$215.11

Industrial communication networks. Profiles – Installation of fieldbuses. Installation profiles for CPF 8

Published By Publication Date Number of Pages
BSI 2019 76
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

This part of IEC 61784-5 specifies the installation profiles for CPF 8 (CC-Link1).

The installation profiles are specified in the annexes. These annexes are read in conjunction with IEC 61918:2018.

PDF Catalog

PDF Pages PDF Title
2 undefined
5 Annex ZA(normative)Normative references to international publicationswith their corresponding European publications
7 CONTENTS
11 FOREWORD
13 INTRODUCTION
Figures
Figure 1 – Standards relationships
14 1 Scope
2 Normative references
3 Terms, definitions and abbreviated terms
4 CPF 8: Overview of installation profiles
15 5 Installation profile conventions
6 Conformance to installation profiles
17 Annex A (normative)CP 8/1 and CP 8/2 (CC-Link/V1 and CC-Link/V2) specific installation profile
A.1 Installation profile scope
A.2 Normative references
A.3 Installation profile terms, definitions, and abbreviated terms
A.3.1 Terms and definitions
A.3.2 Abbreviated terms
A.3.3 Conventions for installation profiles
A.4 Installation planning
A.4.1 General
18 A.4.2 Planning requirements
A.4.3 Network capabilities
19 Figure A.1 – Pass-through connector configuration
Figure A.2 – Bus t-branch topology
20 A.4.4 Selection and use of cabling components
Tables
Table A.1 – Basic network characteristics for balanced cabling not based on Ethernet
Table A.2 – Bus t-branch network characteristics
21 Table A.3 – Information relevant to copper cable: fixed cables
22 Figure A.3 – Wiring
Table A.4 – Connectors for copper cabling CPs not based on Ethernet
25 A.4.5 Cabling planning documentation
A.4.6 Verification of cabling planning specification
A.5 Installation implementation
A.5.1 General requirements
26 A.5.2 Cable installation
Table A.5 – Parameters for balanced cables
27 A.5.3 Connector installation
A.5.4 Terminator installation
Table A.6 – Cable conductor assignments
28 A.5.5 Device installation
A.5.6 Coding and labelling
A.5.7 Earthing and bonding of equipment and devices and shield cabling
29 A.5.8 As-implemented cabling documentation
A.6 Installation verification and installation acceptance test
A.6.1 General
A.6.2 Installation verification
30 A.6.3 Installation acceptance test
A.7 Installation administration
A.8 Installation maintenance and installation troubleshooting
31 Annex B (normative)CP 8/3 (CC-Link/LT) specific installation profile
B.1 Installation profile scope
B.2 Normative references
B.3 Installation profile terms, definitions, and abbreviated terms
B.3.1 Terms and definitions
B.3.2 Abbreviated terms
B.3.3 Conventions for installation profiles
B.4 Installation planning
B.4.1 General
32 B.4.2 Planning requirements
B.4.3 Network capabilities
33 Figure B.1 – Powered network topology
Figure B.2 – Bus t-branch topology
34 Table B.1 – Basic network characteristics for balanced cabling not based on Ethernet
Table B.2 – CP 8/3 additional topology length limits
35 B.4.4 Selection and use of cabling components
36 Figure B.3 – Flat cable cross section – with key
Figure B.4 – Flat cable cross section – without key
Figure B.5 – Flat cable polarity marking
Table B.3 – Information relevant to copper cable: cords
37 Figure B.6 – Wiring
38 Figure B.7 – Flat cable connector and terminal cover
39 Table B.4 – Connectors for copper cabling CPs not based on Ethernet
42 B.4.5 Cabling planning documentation
B.4.6 Verification of cabling planning specification
B.5 Installation implementation
B.5.1 General requirements
B.5.2 Cable installation
Table B.5 – Parameters for balanced cables
43 B.5.3 Connector installation
Table B.6 – Flat cable conductor assignments
44 B.5.4 Terminator installation
B.5.5 Device installation
B.5.6 Coding and labelling
B.5.7 Earthing and bonding of equipment and devices and shield cabling
45 B.5.8 As-implemented cabling documentation
B.6 Installation verification and installation acceptance test
B.6.1 General
B.6.2 Installation verification
46 B.6.3 Installation acceptance test
B.7 Installation administration
B.8 Installation maintenance and installation troubleshooting
47 Annex C (normative)CP 8/4 (CC-Link IE Controller Network) specific installation profile
C.1 Installation profile scope
C.2 Normative references
C.3 Installation profile terms, definitions, and abbreviated terms
C.3.1 Terms and definitions
C.3.2 Abbreviated terms
C.3.3 Conventions for installation profiles
C.4 Installation planning
C.4.1 General
C.4.2 Planning requirements
48 C.4.3 Network capabilities
49 Table C.1 – Network characteristics for balanced cabling based on Ethernet
Table C.2 – Network characteristics for optical fibre cabling
50 C.4.4 Selection and use of cabling components
Table C.3 – Information relevant to copper cable: fixed cables
51 Table C.4 – Information relevant to optical fibre cables
Table C.5– Connectors for balanced cabling CPs based on Ethernet
52 Table C.6 – Optical fibre connecting hardware
Table C.7 – Relationship between FOC and fibre types (CP 8/4)
55 C.4.5 Cabling planning documentation
56 C.4.6 Verification of cabling planning specification
C.5 Installation implementation
C.5.1 General requirements
C.5.2 Cable installation
Table C.8 – Parameters for balanced cables
Table C.9 – Parameters for silica optical fibre cables
57 C.5.3 Connector installation
58 C.5.4 Terminator installation
C.5.5 Device installation
C.5.6 Coding and labelling
C.5.7 Earthing and bonding of equipment and devices and shield cabling
59 C.5.8 As-implemented cabling documentation
C.6 Installation verification and installation acceptance test
C.6.1 General
C.6.2 Installation verification
60 C.6.3 Installation acceptance test
C.7 Installation administration
61 C.8 Installation maintenance and installation troubleshooting
62 Annex D (normative)CP 8/5 (CC-Link IE Field Network) specific installation profile
D.1 Installation profile scope
D.2 Normative references
D.3 Installation profile terms, definitions, and abbreviated terms
D.3.1 Terms and definitions
D.3.2 Abbreviated terms
D.3.3 Conventions for installation profiles
D.4 Installation planning
D.4.1 General
D.4.2 Planning requirements
63 D.4.3 Network capabilities
64 D.4.4 Selection and use of cabling components
Table D.1 – Network characteristics for balanced cabling based on Ethernet
65 Table D.2 – Information relevant to copper cable: fixed cables
66 Table D.3 – Connectors for balanced cabling CPs based on Ethernet
69 D.4.5 Cabling planning documentation
70 D.4.6 Verification of cabling planning specification
D.5 Installation implementation
D.5.1 General requirements
D.5.2 Cable installation
Table D.4 – Parameters for balanced cables
71 D.5.3 Connector installation
D.5.4 Terminator installation
72 D.5.5 Device installation
D.5.6 Coding and labelling
D.5.7 Earthing and bonding of equipment and devices and shield cabling
73 D.5.8 As-implemented cabling documentation
D.6 Installation verification and installation acceptance test
D.6.1 General
D.6.2 Installation verification
74 D.6.3 Installation acceptance test
D.7 Installation administration
D.8 Installation maintenance and installation troubleshooting
75 Bibliography
BS EN IEC 61784-5-8:2018
$215.11