BS EN IEC 61954:2021
$189.07
Static VAR compensators (SVC). Testing of thyristor valves
Published By | Publication Date | Number of Pages |
BSI | 2021 | 50 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
5 | Annex ZA (normative)Normative references to international publicationswith their corresponding European publications |
8 | English CONTENTS |
11 | FOREWORD |
13 | 1 Scope 2 Normative references 3 Terms and definitions |
15 | 4 General requirements for type, production and optional tests 4.1 Summary of tests Table 1 – List of tests |
16 | 4.2 Objectives of tests 4.2.1 General 4.2.2 Dielectric tests 4.2.3 Operational tests |
17 | 4.2.4 Electromagnetic interference tests 4.2.5 Production tests 4.2.6 Optional tests 4.3 Guidelines for the performance of type and optional tests |
18 | 4.4 Test conditions 4.4.1 General |
19 | 4.4.2 Valve temperature at testing 4.4.3 Redundant thyristor levels |
20 | 4.5 Permissible component failures during type testing 4.6 Documentation of test results 4.6.1 Test reports to be issued |
21 | 4.6.2 Contents of a type test report 5 Type tests on TCR and TSR valves 5.1 Dielectric tests between valve terminals and earth 5.1.1 General Table 2 – Number of thyristor levels permitted to fail during type tests |
22 | 5.1.2 AC test 5.1.3 Lightning impulse test |
23 | 5.2 Dielectric tests between valves (MVU only) 5.2.1 General 5.2.2 AC test |
24 | 5.2.3 Lightning impulse test 5.3 Dielectric tests between valve terminals 5.3.1 General 5.3.2 AC test |
26 | 5.3.3 Switching impulse test |
27 | 5.4 Operational tests 5.4.1 Periodic firing and extinction test |
28 | 5.4.2 Minimum AC voltage test |
29 | 5.4.3 Temperature rise test 6 Type tests on TSC valves 6.1 Dielectric tests between valve terminals and earth 6.1.1 General |
30 | 6.1.2 AC-DC test |
31 | 6.1.3 Lightning impulse test |
32 | 6.2 Dielectric tests between valves (for MVU only) 6.2.1 General 6.2.2 AC-DC test |
34 | 6.2.3 Lightning impulse test 6.3 Dielectric tests between valve terminals 6.3.1 General 6.3.2 AC-DC test |
36 | 6.3.3 Switching impulse test |
37 | 6.4 Operational tests 6.4.1 Overcurrent tests |
39 | Figure 1 – TSC branch |
40 | Figure 2 – One-loop overcurrent |
41 | 6.4.2 Minimum AC voltage test Figure 3 – Two-loop overcurrent |
42 | 6.4.3 Temperature rise test 7 Electromagnetic interference tests 7.1 Objectives 7.2 Test procedures 7.2.1 General |
43 | 7.2.2 Switching impulse test 7.2.3 Non-periodic firing test 8 Production tests 8.1 General 8.2 Visual inspection 8.3 Connection check |
44 | 8.4 Voltage-dividing/damping circuit check 8.5 Voltage withstand check 8.6 Check of auxiliaries 8.7 Firing check 8.8 Cooling system pressure test 8.9 Partial discharge tests 9 Optional tests on TCR and TSR valves 9.1 Overcurrent test 9.1.1 Overcurrent with subsequent blocking |
45 | 9.1.2 Overcurrent without blocking 9.2 Positive voltage transient during recovery test 9.2.1 Objectives 9.2.2 Test values and waveshapes |
46 | 9.2.3 Test procedures 9.3 Non-periodic firing test 9.3.1 Objectives 9.3.2 Test values and waveshapes |
47 | 9.3.3 Test procedures |
48 | 10 Optional tests on TSC valves 10.1 Positive voltage transient during recovery test 10.1.1 Test objective 10.1.2 Test values and waveshapes 10.1.3 Test procedures 10.2 Non-periodic firing test 10.2.1 Objectives |
49 | 10.2.2 Test values and waveshapes |
50 | 10.2.3 Test procedures |