BS EN IEC 62282-2-100:2020
$189.07
Fuel cell technologies – Fuel cell modules. Safety
Published By | Publication Date | Number of Pages |
BSI | 2020 | 52 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
5 | Annex ZA(normative)Normative references to international publicationswith their corresponding European publications |
7 | English CONTENTS |
9 | FOREWORD |
11 | 1 Scope |
12 | 2 Normative references Figure 1 – Fuel cell power system components |
13 | 3 Terms and definitions |
18 | 4 Requirements 4.1 General safety strategy |
19 | 4.2 Design requirements 4.2.1 General 4.2.2 Behaviour at normal and abnormal operating conditions |
20 | 4.2.3 Leakage 4.2.4 Pressurized operation 4.2.5 Fire and ignition |
21 | 4.2.6 Safeguarding |
22 | 4.2.7 Piping and fittings |
23 | 4.2.8 Electrical components 4.2.9 Terminals and electrical connections |
24 | 4.2.10 Electrically live parts 4.2.11 Insulating materials and dielectric strength 4.2.12 Protective earthing/bonding |
25 | 4.2.13 Shock and vibration 5 Type tests 5.1 General 5.2 Shock and vibration test 5.3 Gas leakage test 5.3.1 General 5.3.2 Flow meter method |
26 | 5.3.3 Pressure drop method |
27 | 5.4 Normal operation test |
28 | 5.5 Allowable working pressure test 5.6 Pressure withstanding test of cooling system |
29 | 5.7 Continuous and short-time electrical rating 5.8 Overpressure test 5.9 Dielectric strength test |
30 | 5.10 Differential pressure test Tables Table 1 – Dielectric strength test voltages |
31 | 5.11 Gas leakage test (repeat) 5.12 Normal operation (repeat) 5.13 Flammable concentration test 5.14 Tests of abnormal operating conditions 5.14.1 General |
32 | 5.14.2 Fuel starvation test 5.14.3 Oxygen/oxidant starvation test 5.14.4 Short-circuit test |
33 | 5.14.5 Lack of cooling/impaired cooling test 5.14.6 Crossover monitoring system test 5.14.7 Freeze/thaw cycle tests |
34 | 6 Routine tests 6.1 General 6.2 Gas-tightness test 6.3 Dielectric strength withstand test 7 Markings and instructions 7.1 Nameplate 7.2 Marking |
35 | 7.3 Warning label 7.4 Documentation 7.4.1 General |
36 | 7.4.2 Installation manual 7.4.3 Installation diagram |
37 | 7.4.4 Operation manual |
38 | 7.4.5 Maintenance manual 7.4.6 Parts list |
39 | Annex A (informative)Significant hazards, hazardous situations and events dealt with in this document Table A.1 – Typical hazardous situations and events |
41 | Annex B (informative)Additional information for the performanceand evaluation of the tests B.1 Estimating the leakage rate of a system when testing with a gas other thanthe working gas B.1.1 General |
42 | B.1.2 Calculation of R using Formula (B.1) B.1.3 Calculation of R using Formula (B.2) B.1.4 Examples |
43 | B.1.5 Conclusion |
44 | B.2 Derivation of the “safety factor” for the allowable working pressure test (5.5) B.2.1 General Table B.1 – Viscosity of gases at one atmosphere |
45 | B.2.2 Pressure relief devices B.2.3 Conclusion B.3 Proposed acceptance tests B.3.1 Leakage test B.3.2 Normal operation B.3.3 Allowable working pressure test |
46 | B.3.4 Pressure withstanding test of cooling system B.3.5 Overpressure test B.3.6 Differential pressure test B.3.7 Safety-related control functions |
47 | Annex C (informative)List of notes concerning particular conditions in certain countries |
48 | Bibliography |