This document, in conjunction with ISO 11296‑1, specifies requirements and test methods for cured-in-place pipes and fittings used for the renovation of underground non-pressure drainage and sewerage networks with service temperatures up to 50 °C.
It applies to the use of various thermosetting resin systems, in combination with compatible fibrous carrier materials, reinforcement, and other process-related plastics components (see 5.3).
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
9 | Foreword |
11 | Introduction |
13 | 1 Scope 2 Normative references |
14 | 3 Terms and definitions |
16 | 4 Symbols and abbreviated terms 4.1 Symbols |
18 | 4.2 Abbreviated terms 5 Pipes at the “M” stage 5.1 Materials |
20 | 5.2 General characteristics 5.3 Material characteristics 5.4 Geometric characteristics 5.5 Mechanical characteristics 5.6 Physical characteristics |
21 | 5.7 Jointing 5.8 Marking 6 Fittings at the “M” stage 6.1 Materials 6.2 General characteristics 6.3 Material characteristics 6.4 Geometric characteristics |
22 | 6.5 Mechanical characteristics 6.6 Physical characteristics 6.7 Jointing 6.8 Marking |
23 | 7 Ancillary components 8 Fitness for purpose of the installed lining system at the “I” stage 8.1 Materials 8.2 General characteristics 8.3 Material characteristics 8.4 Geometric characteristics 8.4.1 General 8.4.2 CIPP wall structure |
24 | 8.4.3 Wall thickness 8.5 Mechanical characteristics 8.5.1 Reference conditions for testing 8.5.2 Test requirements |
27 | 8.6 Physical characteristics 8.7 Additional characteristics |
28 | 8.8 Sampling |
29 | 9 Installation practice 9.1 Preparatory work 9.2 Storage, handling and transport of pipe components 9.3 Equipment 9.4 Installation 9.4.1 Environmental precautions 9.4.2 Installation procedures |
30 | 9.4.3 Simulated installations 9.5 Process-related inspection and testing 9.6 Lining termination |
31 | 9.7 Reconnections to existing pipeline system 9.8 Final inspection and testing 9.9 Documentation |
32 | Annex A (informative) CIPP components and their functions |
33 | Annex B (normative) Cured-in-place pipes — Determination of short-term flexural properties |
42 | Annex C (normative) Cured-in-place pipes — Determination of long-term flexural modulus under dry or wet conditions |
47 | Annex D (normative) Cured-in-place pipes — Determination of long-term flexural strength under dry, wet or acidic conditions (stress corrosion test) |
51 | Bibliography |