BS EN ISO 4064-1:2014
$189.07
Water meters for cold potable water and hot water – Metrological and technical requirements
Published By | Publication Date | Number of Pages |
BSI | 2014 | 48 |
This part of ISO 4064|OIML R 49 specifies the metrological and technical requirements for water meters for cold potable water and hot water flowing through a fully charged, closed conduit. These water meters incorporate devices which indicate the integrated volume.
In addition to water meters based on mechanical principles, this part of ISO 4064|OIML R 49 applies to devices based on electrical or electronic principles, and mechanical principles incorporating electronic devices, used to measure the volume of cold potable water and hot water.
This part of ISO 4064|OIML R 49 also applies to electronic ancillary devices. Ancillary devices are optional. However, it is possible for national or regional regulations to render some ancillary devices mandatory in relation to the utilization of water meters.
Any national regulations apply in the country of use.
PDF Catalog
PDF Pages | PDF Title |
---|---|
9 | Section sec_1 Section sec_2 Section sec_3 Section sec_3.1 Section sec_3.1.1 1 Scope 2 Normative references 3 Terms and definitions 3.1 Water meter and its constituents |
10 | Section sec_3.1.2 Section sec_3.1.3 Section sec_3.1.4 Section sec_3.1.5 Section sec_3.1.6 Section sec_3.1.7 |
11 | Section sec_3.1.8 Section sec_3.1.9 Section sec_3.1.10 Section sec_3.1.11 Section sec_3.1.12 Section sec_3.1.13 Section sec_3.1.14 |
12 | Section sec_3.1.15 Section sec_3.1.16 Section sec_3.1.17 Section sec_3.1.18 Section sec_3.1.19 Section sec_3.1.20 Section sec_3.1.21 Section sec_3.1.22 Section sec_3.1.23 Section sec_3.1.24 |
13 | Section sec_3.2 Section sec_3.2.1 Section sec_3.2.2 Section sec_3.2.3 Section sec_3.2.4 Section sec_3.2.5 Section sec_3.2.6 Section sec_3.2.7 Section sec_3.2.8 3.2 Metrological characteristics |
14 | Section sec_3.2.9 Section sec_3.2.10 Section sec_3.2.11 Section sec_3.2.12 Section sec_3.2.13 Section sec_3.2.14 Section sec_3.3 Section sec_3.3.1 Section sec_3.3.2 3.3 Operating conditions |
15 | Section sec_3.3.3 Section sec_3.3.4 Section sec_3.3.5 Section sec_3.3.6 Section sec_3.3.7 Section sec_3.3.8 Section sec_3.3.9 Section sec_3.3.10 Section sec_3.3.11 |
16 | Section sec_3.3.12 Section sec_3.3.13 Section sec_3.3.14 Section sec_3.4 Section sec_3.4.1 Section sec_3.4.2 Section sec_3.4.3 3.4 Test conditions |
17 | Section sec_3.4.4 Section sec_3.4.5 Section sec_3.4.6 Section sec_3.4.7 Section sec_3.4.8 Section sec_3.4.9 Section sec_3.4.10 Section sec_3.4.11 Section sec_3.4.12 |
18 | Section sec_3.4.13 Section sec_3.5 Section sec_3.5.1 Section sec_3.5.2 Section sec_3.5.3 Section sec_3.5.4 Section sec_3.5.5 Section sec_3.5.6 3.5 Electronic and electrical equipment |
19 | Section sec_3.5.7 Section sec_3.5.8 Section sec_3.6 Section sec_4 Section sec_4.1 Section sec_4.1.1 Section sec_4.1.2 Section sec_4.1.3 Section sec_4.1.4 Section sec_4.1.5 Section sec_4.1.6 3.6 Use of certain terms within the European Economic Area 4 Metrological requirements 4.1 Values of Q1, Q2, Q3, and Q4 |
20 | Section sec_4.2 Section sec_4.2.1 Section sec_4.2.2 Section sec_4.2.3 Section sec_4.2.4 Table tab_1 Section sec_4.2.5 4.2 Accuracy class and maximum permissible error |
21 | Section sec_4.2.6 Section sec_4.2.7 Section sec_4.2.8 Section sec_4.2.9 Section sec_4.2.10 Section sec_4.3 Section sec_4.3.1 Section sec_4.3.2 4.3 Requirements for meters and ancillary devices |
22 | Section sec_4.3.3 Section sec_4.3.4 Section sec_4.3.5 Section sec_4.3.6 |
23 | Section sec_5 Section sec_5.1 Section sec_5.1.1 Section sec_5.1.2 Section sec_5.1.3 Section sec_5.1.4 Section sec_5.2 Section sec_5.2.1 Section sec_5.2.2 Section sec_5.2.2.1 5 Water meters equipped with electronic devices 5.1 General requirements 5.2 Power supply |
24 | Section sec_5.2.2.2 Section sec_5.2.2.3 Section sec_5.2.3 Section sec_5.2.3.1 Section sec_5.2.3.2 Section sec_5.2.4 Section sec_5.2.4.1 Section sec_5.2.4.2 Section sec_5.2.4.3 Section sec_5.2.4.4 Section sec_5.2.4.5 Section sec_6 Section sec_6.1 Section sec_6.1.1 Section sec_6.1.2 6 Technical requirements 6.1 Materials and construction of water meters |
25 | Section sec_6.1.3 Section sec_6.1.4 Section sec_6.1.5 Section sec_6.1.6 Section sec_6.1.7 Section sec_6.1.8 Section sec_6.1.9 Section sec_6.2 Section sec_6.2.1 Section sec_6.2.2 Section sec_6.3 Section sec_6.3.1 Section sec_6.3.2 Section sec_6.3.3 Section sec_6.3.4 6.2 Adjustment and correction 6.3 Installation conditions |
26 | Section sec_6.3.5 Table tab_2 Table tab_3 |
27 | Section sec_6.4 Section sec_6.5 Table tab_4 Section sec_6.6 Section sec_6.6.1 Section sec_6.6.2 6.4 Rated operating conditions 6.5 Pressure loss 6.6 Marks and inscriptions |
29 | Section sec_6.7 Section sec_6.7.1 Section sec_6.7.1.1 Section sec_6.7.1.2 Section sec_6.7.1.3 Table tab_5 6.7 Indicating device |
30 | Section sec_6.7.1.4 Section sec_6.7.2 Section sec_6.7.2.1 Section sec_6.7.2.2 |
31 | Section sec_6.7.2.3 Section sec_6.7.3 Section sec_6.7.3.1 Section sec_6.7.3.2 Section sec_6.7.3.2.1 Section sec_6.7.3.2.2 Section sec_6.7.3.2.3 |
32 | Section sec_6.7.3.3 Section sec_6.8 Section sec_6.8.1 Section sec_6.8.2 Section sec_6.8.2.1 Section sec_6.8.2.2 Section sec_6.8.2.3 Section sec_7 Section sec_7.1 6.8 Protection devices 7 Metrological controls 7.1 Reference conditions |
33 | Section sec_7.2 Section sec_7.2.1 Section sec_7.2.2 Table tab_6 Section sec_7.2.3 7.2 Type evaluation and approval |
34 | Section sec_7.2.4 Section sec_7.2.5 Section sec_7.2.6 Section sec_7.2.6.1 Section sec_7.2.6.2 Section sec_7.2.6.3 |
35 | Section sec_7.2.7 Section sec_7.2.8 Section sec_7.2.9 Section sec_7.2.9.1 Section sec_7.2.9.2 |
36 | Section sec_7.2.9.3 Section sec_7.2.10 Section sec_7.2.11 Section sec_7.2.11.1 Section sec_7.2.11.2 Section sec_7.2.11.3 |
37 | Section sec_7.2.12 Section sec_7.2.12.1 Section sec_7.2.12.2 Section sec_7.2.12.2.1 Section sec_7.2.12.2.2 Section sec_7.2.12.2.3 Section sec_7.2.12.2.4 Section sec_7.3 Section sec_7.3.1 7.3 Initial verification |
38 | Section sec_7.3.2 Section sec_7.3.3 Section sec_7.3.4 Section sec_7.3.5 Section sec_7.3.6 |
39 | Annex sec_A Annex sec_A.1 Annex sec_A.2 Annex sec_A.3 Annex A (normative) Performance tests for water meters with electronic devices |
40 | Annex sec_A.4 Annex sec_A.4.1 Annex sec_A.4.2 Annex sec_A.4.3 Annex sec_A.5 Table tab_A.1 |
41 | Annex sec_B Annex sec_B.1 Annex sec_B.2 Annex sec_B.2.1 Annex sec_B.2.2 Annex B (normative) Checking facilities |
42 | Annex sec_B.2.3 Annex sec_B.2.4 Annex sec_B.2.5 Annex sec_B.3 Annex sec_B.3.1 |
43 | Annex sec_B.3.2 Annex sec_B.3.3 Annex sec_B.4 Annex sec_B.4.1 Annex sec_B.4.2 |
44 | Annex sec_B.4.3 Annex sec_B.4.4 Annex sec_B.4.5 Annex sec_B.5 Annex sec_B.6 |
45 | Annex sec_C Annex C (informative) Permissible errors in service and subsequent verification |
46 | Reference ref_1 Reference ref_2 Reference ref_3 Reference ref_4 Reference ref_5 Reference ref_6 Reference ref_7 Reference ref_8 Bibliography |