BS ISO 18676:2024
$142.49
Space systems. Requirements and guidelines for the management of systems engineering
Published By | Publication Date | Number of Pages |
BSI | 2024 | 26 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
6 | Foreword |
7 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
11 | 4 Positioning of systems engineering management 4.1 General 4.2 Need for systems engineering management 4.3 Systems engineering |
12 | 4.4 Systems engineering management 4.5 Systems engineering management relative to the mission/programme/project |
13 | 5 Management of the systems engineering activities 5.1 General 5.2 Planning |
14 | 5.3 Assessment 5.4 Trade-offs and decision-making 5.5 Control |
15 | 6 Systems engineering management plan (SEMP) 7 Systems engineering management activities 7.1 Management of stakeholder requirements analysis 7.2 Management of system requirements analysis |
16 | 7.3 Management of architectural design 7.4 Management of detailed design 7.5 Management of assembly, integration and verification 7.6 Management of validation |
17 | 8 Work breakdown structures (WBS) |
18 | 9 Phasing, scheduling and recursivity 10 Budgeting and resource planning 11 Status reporting and assessment 11.1 General 11.2 Cost assessments |
19 | 11.3 Scheduling assessments 11.4 Performance assessments 11.5 Risk assessments |
20 | 12 Reviews, audits and control gates 12.1 General 12.2 Review |
21 | 12.3 Review list |
22 | 12.4 Audits 12.5 Control gates 13 Interfaces management with SE 13.1 General |
23 | 13.2 Acquisition and supply interface management 13.3 Implementation interface management |
24 | Bibliography |